메뉴 건너뛰기




Volumn 12, Issue 4, 1999, Pages 441-459

Reporting on the state of infrastructure by local government

Author keywords

Assets valuation; Infrastructure; Local government; Planned maintenance; Replacement

Indexed keywords


EID: 84986106213     PISSN: 09513574     EISSN: None     Source Type: Journal    
DOI: 10.1108/09513579910283477     Document Type: Article
Times cited : (30)

References (41)
  • 2
    • 84986028667 scopus 로고
    • Definition and recognition of the elements of financial statements
    • (1992)
    • Australian Accounting Research Foundation (AARF) (1982), Statement of Accounting Concepts 4 (SAC 4) (1992), “Definition and recognition of the elements of financial statements”.
    • (1982) Statement of Accounting Concepts 4 (SAC 4)
  • 8
  • 9
    • 0027597163 scopus 로고
    • An approach for predicting latent infrastructure facility deterioration
    • 2 May
    • Ben-Akiva, M. and Ramaswamy, R. (1993), “An approach for predicting latent infrastructure facility deterioration”, Transportation Science, Vol. 27 No. 2, 2 May, pp. 174-93.
    • (1993) Transportation Science , vol.27 , Issue.2 , pp. 174-193
    • Ben-Akiva, M.1    Ramaswamy, R.2
  • 10
    • 0027271584 scopus 로고
    • Infrastructure management under uncertainty: latent performance approach
    • January/February
    • Ben-Akiva, M., Humplick, F., Madanat, S. and Ramaswamy, R. (1993), “Infrastructure management under uncertainty: latent performance approach”, Journal of Transportation Engineering, Vol. 119 No. 1, January/February, pp. 43-58.
    • (1993) Journal of Transportation Engineering , vol.119 , Issue.1 , pp. 43-58.
    • Ben-Akiva, M.1    Humplick, F.2    Madanat, S.3    Ramaswamy, R.4
  • 11
    • 84986061902 scopus 로고
    • Asset replacement in the public sector
    • May
    • Burns, P. (1987), “Asset replacement in the public sector”, South Australian Builder, May, pp. 12-15.
    • (1987) South Australian Builder , pp. 12-15.
    • Burns, P.1
  • 12
  • 13
    • 84986076414 scopus 로고
    • Asset replacement. The size of the problem
    • July
    • Burns, P. (1991), “Asset replacement. The size of the problem”, Canberra Bulletin of Public Administration, No. 65, July, pp. 88-91.
    • (1991) Canberra Bulletin of Public Administration , Issue.65 , pp. 88-91
    • Burns, P.1
  • 15
    • 0024702168 scopus 로고
    • Developing a data base on infrastructure needs
    • July
    • Clarke, R.M. and Goodrich, J.A. (1989), “Developing a data base on infrastructure needs”, Journal AWWA, July, pp. 81-7.
    • (1989) Journal AWWA , pp. 81-87
    • Clarke, R.M.1    Goodrich, J.A.2
  • 16
    • 0004220973 scopus 로고
    • Assessing the infrastructure deficiencies: the case of highway bridges
    • June
    • Dunker, K.F. and Rabbat, B.G. (1995), “Assessing the infrastructure deficiencies: the case of highway bridges”, Journal of Infrastructure Systems, June, pp. 100-7.
    • (1995) Journal of Infrastructure Systems , pp. 100-107
    • Dunker, K.F.1    Rabbat, B.G.2
  • 18
    • 84986149798 scopus 로고
    • Asset replacement and maintenance, the maintenance backlog
    • July
    • Flutter, J. (1991), “Asset replacement and maintenance, the maintenance backlog”, Canberra Bulletin of Public Administration, No. 65, July, pp 92-4
    • (1991) Canberra Bulletin of Public Administration , Issue.65 , pp. 92-94
    • Flutter, J.1
  • 19
    • 0024751326 scopus 로고
    • Infrastructure maintenance management system development
    • October
    • Karaa, F.A. (1989), “Infrastructure maintenance management system development”, Journal of Professional Issues in Engineering, Vol. 115 No. 4, October, pp. 422-32.
    • (1989) Journal of Professional Issues in Engineering , vol.115 , Issue.4 , pp. 422-32.
    • Karaa, F.A.1
  • 20
    • 84986080155 scopus 로고
    • Pipes and wires – the hidden dilemma
    • paper 58c.
    • Lehmann, T. (1991), “Pipes and wires – the hidden dilemma”, ANZAAS Congress Papers, No. 60, paper 58c.
    • (1991) ANZAAS Congress Papers , Issue.60
    • Lehmann, T.1
  • 21
    • 0024051494 scopus 로고
    • Inventory, condition, and performance assessment in infrastructure facilities management
    • July
    • Maser, K.R. (1988), “Inventory, condition, and performance assessment in infrastructure facilities management”, Journal of Professional Issues in Engineering, Vol. 114 No. 3, July, pp. 271-80.
    • (1988) Journal of Professional Issues in Engineering , vol.114 , Issue.3 , pp. 271-280
    • Maser, K.R.1
  • 22
    • 33847744798 scopus 로고
    • Sensors for infrastructure assessment
    • November
    • Maser, K.R. (1988), “Sensors for infrastructure assessment”, Journal of Performance of Constructed Facilities, Vol. 2 No. 4, November, pp. 226-41.
    • (1988) Journal of Performance of Constructed Facilities , vol.2 , Issue.4 , pp. 226-241
    • Maser, K.R.1
  • 24
    • 5944234717 scopus 로고
    • NSW Government.
    • NSW Commission of Audit (1988), Focus on Reform, NSW Government.
    • (1988) Focus on Reform
  • 27
    • 84986140395 scopus 로고
    • Independent Review of the Financial Performance of the NSW Government 1988-1991.
    • NSW Treasury (1991), How the Government Has Performed, Independent Review of the Financial Performance of the NSW Government 1988-1991.
    • (1991) How the Government Has Performed
  • 29
    • 0008536254 scopus 로고    scopus 로고
    • Infrastructure accounting for local authorities: technical management and political context
    • August
    • >Pallot, J. (1997), “Infrastructure accounting for local authorities: technical management and political context”, Financial Accountability & Management, Vol. 13 No. 3, August, pp. 225-42.
    • (1997) Financial Accountability & Management , vol.13 , Issue.3 , pp. 225-42.
    • >Pallot, J.1
  • 33
    • 84986115682 scopus 로고
    • Report No. 18, 27 March.
    • Public Accounts and Expenditure Review Committee, Western Australia Legislative Assembly (WA PAERC) (1991), Funding and Reporting the State's Superannuation Liability, Report No. 18, 27 March.
    • (1991) Funding and Reporting the State's Superannuation Liability
  • 34
    • 84928457806 scopus 로고
    • The Bridge from Dreams to Realities: Dayton's Capital Allocation Process
    • April
    • Riordan, T.H., Oria, M. and Tuss, J.P. (1987), “The Bridge from Dreams to Realities: Dayton's Capital Allocation Process”, Government Finance Review 3, No. 2, April, pp. 7-13.
    • (1987) Government Finance Review 3 , Issue.2 , pp. 7-13
    • Riordan, T.H.1    Oria, M.2    Tuss, J.P.3
  • 40
    • 84986101598 scopus 로고    scopus 로고
    • The use of replacement price accounting to shape perceptions and ‘control’ the public sector
    • paper presented at Conference of the European Accounting Association, Graz, Austria, April; revised version, UNSW Working Paper, December.
    • Walker, R.G., Clarke, F.L. and Dean, G.W. (1997), “The use of replacement price accounting to shape perceptions and ‘control’ the public sector”, paper presented at Conference of the European Accounting Association, Graz, Austria, April; revised version, UNSW Working Paper, December.
    • (1997)
    • Walker, R.G.1    Clarke, F.L.2    Dean, G.W.3
  • 41
    • 0028858438 scopus 로고
    • Deterioration of public capital and optimal policy of local and central government
    • Yagi, T. (1995), “Deterioration of public capital and optimal policy of local and central government”, Urban Studies, Vol. 32 No. 1, pp. 123-34.
    • (1995) Urban Studies , vol.32 , Issue.1 , pp. 123-134
    • Yagi, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.