메뉴 건너뛰기




Volumn 8, Issue 4, 2002, Pages 364-376

Business process management: Public sector implications

Author keywords

BPR; Implementation; Public sector

Indexed keywords


EID: 84986076245     PISSN: 14637154     EISSN: None     Source Type: Journal    
DOI: 10.1108/14637150210435017     Document Type: Article
Times cited : (113)

References (17)
  • 1
    • 12344322990 scopus 로고    scopus 로고
    • Defining business process requirements for large-scale public sector ERP implementations: a case study
    • Proceedings of the European Conference on Information Systems, Wirtschafts Universität, Wien.
    • Blick, G., Gulledge, T. and Sommer, R. (2000), “Defining business process requirements for large-scale public sector ERP implementations: a case study”, Proceedings of the European Conference on Information Systems, Wirtschafts Universität, Wien.
    • (2000)
    • Blick, G.1    Gulledge, T.2    Sommer, R.3
  • 2
    • 0041983595 scopus 로고    scopus 로고
    • Enterprise software projects rarely satisfy
    • available at: www.internetweek.com/story/INW20000328S0004/ 28 March
    • Booker, E. (2000), “Enterprise software projects rarely satisfy”, InternetWeek, 28 March, available at: www.internetweek.com/story/INW20000328S0004/
    • (2000) InternetWeek
    • Booker, E.1
  • 3
    • 0042126308 scopus 로고    scopus 로고
    • A Boston Consulting Group Report, The Boston Consulting Group, Boston, MA, March.
    • Boston Consulting Group (BCG) (2000), Getting Value from Enterprise Initiatives: A Survey of Executives, A Boston Consulting Group Report, The Boston Consulting Group, Boston, MA, March.
    • (2000) Getting Value from Enterprise Initiatives: A Survey of Executives
  • 5
    • 0002481047 scopus 로고
    • The new industrial engineering: information technology and business process redesign
    • Summer
    • Davenport, T.H. and Short, J.E. (1990), “The new industrial engineering: information technology and business process redesign”, The Sloan Management Review, Vol. 31 No. 4, Summer, pp. 11-27.
    • (1990) The Sloan Management Review , vol.31 , pp. 11-27
    • Davenport, T.H.1    Short, J.E.2
  • 7
    • 3242691039 scopus 로고
    • Processing and operation planning
    • in Maynard, H.B. (Ed.), McGraw-Hill, New York, NY.
    • Grass, I.E. (1956), “Processing and operation planning”, in Maynard, H.B. (Ed.), Industrial Engineering Handbook, McGraw-Hill, New York, NY.
    • (1956) Industrial Engineering Handbook
    • Grass, I.E.1
  • 10
    • 0001848481 scopus 로고    scopus 로고
    • Breaking the functional mind-set in process organizations
    • Majchrzak, A. and Wang, Q. (1996), “Breaking the functional mind-set in process organizations”, Harvard Business Review, Vol. 74 No. 5, September-October, pp. 93-9.
    • (1996) Harvard Business Review , vol.74 , pp. 93-99
    • Majchrzak, A.1    Wang, Q.2
  • 11
    • 3242687486 scopus 로고
    • Process chart procedures
    • in Maynard, H.B. (Ed.), McGraw-Hill, New York, NY.
    • Mullee, W.R. and Porter, D.B. (1956), “Process chart procedures”, in Maynard, H.B. (Ed.), Industrial Engineering Handbook, McGraw-Hill, New York, NY.
    • (1956) Industrial Engineering Handbook
    • Mullee, W.R.1    Porter, D.B.2
  • 13
    • 3242741502 scopus 로고
    • Architecture of integrated information systems (ARIS)
    • in Yoshikawa, H. and Goossenaerts, J. (Eds), North-Holland, Amsterdam.
    • Scheer, A.-W. (1993), “Architecture of integrated information systems (ARIS)”, in Yoshikawa, H. and Goossenaerts, J. (Eds), Information Infrastructure Systems for Manufacturing, North-Holland, Amsterdam.
    • (1993) Information Infrastructure Systems for Manufacturing
    • Scheer, A.-W.1
  • 15
    • 0042052006 scopus 로고    scopus 로고
    • Occasional Paper No. 11, State Services Commission, Wellington.
    • State Services Commission (1999), Improving Accountability: Setting the Scene, Occasional Paper No. 11, State Services Commission, Wellington.
    • (1999) Improving Accountability: Setting the Scene


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.