-
1
-
-
33645470917
-
-
ADB, JBIC, and World Bank, Manila, Tokyo, and Washington, DC.
-
ADB, JBIC, and World Bank (2005), Connecting East Asia: a New Framework for Infrastructure, ADB, JBIC, and World Bank, Manila, Tokyo, and Washington, DC.
-
(2005)
Connecting East Asia: a New Framework for Infrastructure
-
-
-
2
-
-
84986062756
-
Beijing issues PPP regulations for infrastructure development, front page
-
November 25.
-
Beijing Evening News (2003), “Beijing issues PPP regulations for infrastructure development, front page”, Beijing Evening News, November 25.
-
(2003)
Beijing Evening News
-
-
-
3
-
-
84986130611
-
C-BOT: new urban concession model in Qionglai
-
(in Chinese), available at: www.ccgov.org.cn/zfchxanl/chxanl20060323_028.htm.
-
CCGOV (2006), “C-BOT: new urban concession model in Qionglai” (in Chinese), available at: www.ccgov.org.cn/zfchxanl/chxanl20060323_028.htm.
-
(2006)
-
-
-
4
-
-
84986062753
-
Qionglai model in trap
-
(in Chinese), available at: www.ccgov.org.cn/zfchxanl/cxzl/cxzl20060323_028-1.htm.
-
CCGOV (2006), “Qionglai model in trap” (in Chinese), available at: www.ccgov.org.cn/zfchxanl/cxzl/cxzl20060323_028-1.htm.
-
(2006)
-
-
-
5
-
-
0030231260
-
New methods for subjective mental workload assessment and fuzzy risk analysis
-
Chen, S-M. (1996), “New methods for subjective mental workload assessment and fuzzy risk analysis”, Cybernetics and Systems: An International Journal, Vol. 27, pp. 449-72.
-
(1996)
Cybernetics and Systems: An International Journal
, vol.27
, pp. 449-472
-
-
Chen, S.-M.1
-
6
-
-
84986038576
-
Adopting new investment way for urban development
-
March 15.
-
Chinese Economic Weekly (2002), “Adopting new investment way for urban development”, Chinese Economic Weekly, March 15.
-
(2002)
Chinese Economic Weekly
-
-
-
7
-
-
0004243644
-
-
Pearson, Harlow.
-
Freund, J.E. and Perles, B.M. (2007), Modern Elementary Statistics, 12th ed., Pearson, Harlow.
-
(2007)
Modern Elementary Statistics, 12th ed.
-
-
Freund, J.E.1
Perles, B.M.2
-
8
-
-
84986094477
-
1000 ton/day sludge treatment by Guangzhou
-
(in Chinese), March 16, available at www.greengz.cn/inew/inew_details.asp?inew_ID = 11039.
-
Green GuangZhou (2006), “1000 ton/day sludge treatment by Guangzhou” (in Chinese), March 16, available at www.greengz.cn/inew/inew_details.asp?inew_ID = 11039.
-
(2006)
-
-
-
11
-
-
0003471143
-
-
Prentice-Hall, Englewood Cliffs, NJ.
-
Klir, G.J. and Yuan, B. (1995), Fuzzy Sets and Fuzzy Logic: Theory and Applications, Prentice-Hall, Englewood Cliffs, NJ.
-
(1995)
Fuzzy Sets and Fuzzy Logic: Theory and Applications
-
-
Klir, G.J.1
Yuan, B.2
-
13
-
-
84986103354
-
Asia PPP a survey of the infrastructure sector
-
available at: www.nortonrose.com/html_pubs/view.asp?id = 11027.
-
Norton Rose (2006), “Asia PPP a survey of the infrastructure sector”, available at: www.nortonrose.com/html_pubs/view.asp?id = 11027.
-
(2006)
-
-
-
14
-
-
84986007525
-
The QQIR method – a knowledge based fuzzy expert system for quantifying qualitative information on risks
-
ASCE (in press)
-
Sachs, T. and Tiong, R.L.K. (2007), “The QQIR method – a knowledge based fuzzy expert system for quantifying qualitative information on risks”, Journal of Construction Engineering and Management, ASCE(in press).
-
(2007)
Journal of Construction Engineering and Management
-
-
Sachs, T.1
Tiong, R.L.K.2
-
15
-
-
84986121412
-
Risk exposure and recovery assessment under a guarantee in a water project
-
Sachs, T., Bellinger, C. and Tiong, R. (2007a), “Risk exposure and recovery assessment under a guarantee in a water project”, Journal of Structured Finance, Summer.
-
(2007)
Journal of Structured Finance, Summer.
-
-
Sachs, T.1
Bellinger, C.2
Tiong, R.3
-
16
-
-
84986125119
-
-
Project Finance International, London (in press).
-
Sachs, T., Rosa, A. and Tiong, R. (2007b), Impact quantification of political risks on demand and pricing in a power project – a case study, Project Finance International, London (in press).
-
(2007)
Impact quantification of political risks on demand and pricing in a power project – a case study
-
-
Sachs, T.1
Rosa, A.2
Tiong, R.3
-
17
-
-
0003429159
-
-
Computer Science Press, Potomac, MD.
-
Schmucker, K.J. (1985), Fuzzy Sets, Natural Language Computations, and Risk Analysis, Computer Science Press, Potomac, MD.
-
(1985)
Fuzzy Sets, Natural Language Computations, and Risk Analysis
-
-
Schmucker, K.J.1
-
18
-
-
84986151768
-
-
Standard and Poor's (2006), Credit Week, Vol. 26 No. 37, pp. 108-9.
-
(2006)
Credit Week
, vol.26
, Issue.37
, pp. 108-109
-
-
-
20
-
-
42449154021
-
-
International Risk Management Institute, Dallas, TX.
-
Wagner, D. (1999), Political Risk Insurance Guide, International Risk Management Institute, Dallas, TX.
-
(1999)
Political Risk Insurance Guide
-
-
Wagner, D.1
-
21
-
-
77955336224
-
BOT Trap
-
China Writer Press (Group), Beijing (in Chinese) Issue 2
-
Wang, Y.D. (2002a), “BOT Trap”, Global Entrepreneur, China Writer Press (Group), Beijing (in Chinese) Issue 2, 2002.
-
(2002)
Global Entrepreneur
-
-
Wang, Y.D.1
-
22
-
-
0032667280
-
Political risks: analysis of key contract clauses in China's BOT project
-
Wang, S.Q., Tiong, L.K.R., Ting, S.K. and Ashley, D. (1999), “Political risks: analysis of key contract clauses in China's BOT project”, Journal of Construction Engineering and Management, ASCE, Vol. 125 No. 3, pp. 190-7.
-
(1999)
Journal of Construction Engineering and Management, ASCE
, vol.125
, Issue.3
, pp. 190-197
-
-
Wang, S.Q.1
Tiong, L.K.R.2
Ting, S.K.3
Ashley, D.4
-
23
-
-
0008052876
-
Evaluation and management of political risks in China's BOT projects
-
Wang, S.Q., Tiong, L.K.R., Ting, S.K. and Ashley, D. (2000), “Evaluation and management of political risks in China's BOT projects”, Journal of Construction Engineering and Management, ASCE, Vol. 126 No. 3, pp. 242-50.
-
(2000)
Journal of Construction Engineering and Management, ASCE
, vol.126
, Issue.3
, pp. 242-250
-
-
Wang, S.Q.1
Tiong, L.K.R.2
Ting, S.K.3
Ashley, D.4
-
24
-
-
84986115144
-
A BOT wastewater treatment plant in Yidu City
-
Hubei Province (in Chinese). January 15, 2007. available at: www.027chem.cn/news/BC40D61131934077881F86DFD2AE36A0.html.
-
www.027chem.cn (2007), “A BOT wastewater treatment plant in Yidu City”, Hubei Province (in Chinese). January 15, 2007. available at: www.027chem.cn/news/BC40D61131934077881F86DFD2AE36A0.html.
-
(2007)
-
-
-
25
-
-
84986132843
-
PPP Vehicle to be adopted for the railway from Huhehaote to Zhunger
-
June 13, available at: www.cnworld.net.
-
www.cnworld.net (2004), “PPP Vehicle to be adopted for the railway from Huhehaote to Zhunger”, June 13, available at: www.cnworld.net.
-
(2004)
-
-
-
26
-
-
84986151789
-
Huhehaote-Zhunger Railway Open: release tension of coal transport in Neimenggu
-
(in Chinese) November 13, available at: http://local.xinhuanet.com/dfyw/2006-11/13/content_18848.htm
-
Xinhua News (2006), “Huhehaote-Zhunger Railway Open: release tension of coal transport in Neimenggu”, Xinhua News (in Chinese) November 13, available at: http://local.xinhuanet.com/dfyw/2006-11/13/content_18848.htm.
-
(2006)
Xinhua News
-
-
-
27
-
-
84986124642
-
BOT for dirt-mud treatment facility
-
April 9, available at: www.chinaview.cn.
-
Xinhua Online (2004), “BOT for dirt-mud treatment facility”, Xinhua Online, April 9, available at: www.chinaview.cn.
-
(2004)
Xinhua Online
-
-
-
29
-
-
0035282228
-
BOT-based approaches to infrastructure development in China
-
Zhang, X.Q. and Kumaraswamy, M.M. (2001), “BOT-based approaches to infrastructure development in China”, Journal of Infrastructure Systems, Vol. 7 No. 1, pp. 18-25.
-
(2001)
Journal of Infrastructure Systems
, vol.7
, Issue.1
, pp. 18-25
-
-
Zhang, X.Q.1
Kumaraswamy, M.M.2
-
30
-
-
84986133909
-
New BOT Tide
-
China Writer Press (Group), Beijing, Issue 2
-
Wang, Y.D. (2002b), “New BOT Tide”, Global Entrepreneur, China Writer Press (Group), Beijing, Issue 2, 2002, pp. 61-2.
-
(2002)
Global Entrepreneur
, pp. 61-62
-
-
Wang, Y.D.1
|