메뉴 건너뛰기




Volumn 19, Issue 4, 1988, Pages 713-733

Alternate Routing Strategies in Batch Manufacturing: An Evaluation

Author keywords

Control; Planning; Production Operations Management; Scheduling; Simulation

Indexed keywords


EID: 84985841594     PISSN: 00117315     EISSN: 15405915     Source Type: Journal    
DOI: 10.1111/j.1540-5915.1988.tb00297.x     Document Type: Article
Times cited : (39)

References (23)
  • 1
    • 0015484043 scopus 로고
    • Priority scheduling and inventory control in job lot manufacturing systems
    • (1972) AIIE Transactions , vol.4 , Issue.4 , pp. 267-276
    • Berry, W.L.1
  • 7
    • 84985783901 scopus 로고
    • The race to the automatic factory. Fortune
    • (1983) , pp. 52-64
    • Bylinsky, G.1
  • 10
    • 0000745303 scopus 로고
    • Effects of shop size and labor flexibility in labor and machine limited production systems
    • (1975) Management Science , vol.21 , pp. 507-515
    • Fryer, J.1
  • 18
    • 0014855493 scopus 로고
    • A simulation of labor efficiency and centralized assignment in a production model
    • (1970) Management Science , vol.17 , pp. B97
    • Nelson, R.1
  • 20
    • 84985808939 scopus 로고
    • Effects of alternate machines on two priority dispatching disciplines in the general job shop. Unpublished master's thesis, Cornell University
    • (1965)
    • Wayson, R.D.1
  • 22
    • 84985760294 scopus 로고
    • Computer guided tools are catching on. The Wall Street Journal, 1986, p.
    • (1986) , pp. 6
    • Winters, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.