메뉴 건너뛰기




Volumn 19, Issue 2, 1988, Pages 281-294

REPETITIVE LOTS: FLOW‐TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZING

Author keywords

Control; Planning; Production Operations Management; Scheduling; Simulation.

Indexed keywords


EID: 84985801774     PISSN: 00117315     EISSN: 15405915     Source Type: Journal    
DOI: 10.1111/j.1540-5915.1988.tb00267.x     Document Type: Article
Times cited : (114)

References (6)
  • 3
    • 0021503050 scopus 로고
    • OPT uncovered: Many production planning and scheduling concepts can be applied with or without the software
    • (1984) Industrial Engineering , vol.16 , Issue.10 , pp. 32-41
    • Jacobs, F.R.1
  • 5
    • 0022516278 scopus 로고
    • Optimal and heuristic procedures for component lot‐splitting in multi‐stage manufacturing systems
    • (1986) Management Science , vol.32 , pp. 113-125
    • Moily, J.P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.