|
Volumn 19, Issue 2, 1988, Pages 281-294
|
REPETITIVE LOTS: FLOW‐TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZING
|
Author keywords
Control; Planning; Production Operations Management; Scheduling; Simulation.
|
Indexed keywords
|
EID: 84985801774
PISSN: 00117315
EISSN: 15405915
Source Type: Journal
DOI: 10.1111/j.1540-5915.1988.tb00267.x Document Type: Article |
Times cited : (114)
|
References (6)
|