메뉴 건너뛰기




Volumn 16, Issue 3, 1985, Pages 248-264

NEW TECHNOLOGY INVESTMENTS IN MULTISTAGE PRODUCTION SYSTEMS

Author keywords

Production Operations Management

Indexed keywords


EID: 84985756811     PISSN: 00117315     EISSN: 15405915     Source Type: Journal    
DOI: 10.1111/j.1540-5915.1985.tb01678.x     Document Type: Article
Times cited : (19)

References (16)
  • 8
    • 84985840670 scopus 로고
    • How Toyota shortened supply lot production time, waiting time, and conveyance time. Industrial Engineering
    • (1981) , pp. 22-30
    • Monden, Y.1
  • 12
    • 0016984353 scopus 로고
    • A simple method of determining order quantities in joint‐replenishment under deterministic demand
    • (1976) Management Science , vol.22 , pp. 1351-1361
    • Silver, E.A.1
  • 14
    • 0019612365 scopus 로고
    • Comments on the optimality in optimal and system myopic policies for multiechelon production inventory assembly systems
    • (1981) Management Science , vol.27 , pp. 1081-1087
    • Szendrovits, A.1
  • 16
    • 0000584038 scopus 로고
    • On the optimality of integer lot size ratios in economic lot size determination in multi‐stage assembly syśtems
    • (1982) Management Science , vol.28 , pp. 1341-1349
    • Williams, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.