메뉴 건너뛰기




Volumn 3, Issue 1, 1997, Pages 39-63

Business process re-engineering: Evocation, elucidation and exploration

Author keywords

[No Author keywords available]

Indexed keywords


EID: 84984808791     PISSN: 14637154     EISSN: None     Source Type: Journal    
DOI: 10.1108/14637159710161576     Document Type: Article
Times cited : (18)

References (41)
  • 1
    • 21844493858 scopus 로고
    • Productivity gains of BPR
    • Autumn
    • Alavi, M. and Yoo, Y. (1995), “Productivity gains of BPR”, Information Systems Management, Vol. 12 No. 4, Autumn, pp. 43-47.
    • (1995) Information Systems Management , vol.12 , Issue.4 , pp. 43-47
    • Alavi, M.1    Yoo, Y.2
  • 2
    • 0028515809 scopus 로고
    • Is re-engineering compatible with total quality management?
    • September
    • Allender, H.D. (1994), “Is re-engineering compatible with total quality management?”, Industrial Engineering, Vol. 26 No. 9, September, p. 41.
    • (1994) Industrial Engineering , vol.26 , Issue.9 , pp. 41
    • Allender, H.D.1
  • 3
    • 0001905507 scopus 로고
    • Using simulation in the business process re-engineering effort
    • July
    • Ardhaldjian, R. and Fahner, M. (1994), “Using simulation in the business process re-engineering effort”, Industrial Engineering, Vol. 26 No. 27, July, pp. 60-61.
    • (1994) Industrial Engineering , vol.26 , Issue.27 , pp. 60-61
    • Ardhaldjian, R.1    Fahner, M.2
  • 4
    • 0442314242 scopus 로고
    • Re-engineering revisited
    • No. 7, July
    • Bartram, P. (1994), “Re-engineering revisited”, Management Today, No. 7, July, pp. 61-63.
    • (1994) Management Today , pp. 61-63
    • Bartram, P.1
  • 6
    • 3543082020 scopus 로고
    • Strategic direction: don’t re-engineer without it
    • November/December
    • Berman, S. (1994), “Strategic direction: don’t re-engineer without it”, Planning Review, Vol. 22 No. 6, November/December, pp. 18-23.
    • (1994) Planning Review , vol.22 , Issue.6 , pp. 18-23
    • Berman, S.1
  • 7
    • 0042713179 scopus 로고
    • Translating business re-engineering into bottom-line results
    • January
    • Berrington, C.L. and Oblich, R.L. (1995), “Translating business re-engineering into bottom-line results”, Industrial Engineering, Vol. 27 No. 1, January, pp. 24-27.
    • (1995) Industrial Engineering , vol.27 , Issue.1 , pp. 24-27
    • Berrington, C.L.1    Oblich, R.L.2
  • 8
    • 3543063895 scopus 로고
    • Don’t tinker with it: BPR it!
    • July
    • Classe, A. (1993), “Don’t tinker with it: BPR it!”, Accountancy, Vol. 112 No. 1199, July, pp. 64-66.
    • (1993) Accountancy , vol.112 , Issue.1199 , pp. 64-66
    • Classe, A.1
  • 10
    • 0002481047 scopus 로고
    • The new industrial engineering: information technology and business process redesign
    • summer
    • Davenport, T.H., Short, J.E., et al. (1990), “The new industrial engineering: information technology and business process redesign”, Sloan Management Review, Vol. 31 No. 4, summer, pp. 11-27.
    • (1990) Sloan Management Review , vol.31 , Issue.4 , pp. 11-27
    • Davenport, T.H.1    Short, J.E.2
  • 11
    • 84968123580 scopus 로고
    • Business process re-engineering: improving in new strategic directions
    • summer
    • Dixon, J.R., Arnold, P. et al.(1994), “Business process re-engineering: improving in new strategic directions”, California Management Review, Vol. 36 No. 4, summer, pp. 93-107.
    • (1994) California Management Review , vol.36 , Issue.4 , pp. 93-107
    • Dixon, J.R.1    Arnold, P.2
  • 12
    • 21844514490 scopus 로고
    • Business process redesign: hype, hope or hypocrisy?
    • Edwards, C. and Peppard, J.W. (1994), “Business process redesign: hype, hope or hypocrisy?”, Journal of Information Technology, Vol. 9, pp. 251-266.
    • (1994) Journal of Information Technology , vol.9 , pp. 251-266
    • Edwards, C.1    Peppard, J.W.2
  • 13
    • 71549132763 scopus 로고
    • Information technology-enabled change: the risks and rewards of business process redesign and automation
    • Fiedler, K.D., Grover, V. and Teng, J.T.C. (1994), “Information technology-enabled change: the risks and rewards of business process redesign and automation”, Journal of Information Technology, Vol. 9, pp. 267-275.
    • (1994) Journal of Information Technology , vol.9 , pp. 267-275
    • Fiedler, K.D.1    Grover, V.2    Teng, J.T.C.3
  • 15
    • 0005869188 scopus 로고
    • Building a foundation for successful business process re-engineering
    • September
    • Hales, H.L. and Savoie, B.J. (1994), “Building a foundation for successful business process re-engineering”, Industrial Engineering, Vol. 26 No. 9, September, pp. 17-19.
    • (1994) Industrial Engineering , vol.26 , Issue.9 , pp. 17-19
    • Hales, H.L.1    Savoie, B.J.2
  • 17
    • 0012704932 scopus 로고
    • A beating the risks of re-engineering
    • 15 May
    • Hammer, M. and Stanton, S. (1995), “A beating the risks of re-engineering”, Fortune, Vol. 131 No. 9, 15 May, pp. 47-53.
    • (1995) Fortune , vol.131 , Issue.9 , pp. 47-53
    • Hammer, M.1    Stanton, S.2
  • 19
    • 0041870790 scopus 로고
    • Managing change: why re-engineering projects fail
    • March/April
    • Kiely, T.J. (1995), “Managing change: why re-engineering projects fail”, Harvard Business Review, Vol. 73 No. 2, March/April, p. 15.
    • (1995) Harvard Business Review , vol.73 , Issue.2 , pp. 15
    • Kiely, T.J.1
  • 20
    • 0012498535 scopus 로고
    • Business process re-engineering: building a cross-functional information architecture
    • December
    • Kim, B.O. (1994), “Business process re-engineering: building a cross-functional information architecture”, Journal of Systems Management, Vol. 45 No. 12, December, pp. 30-35.
    • (1994) Journal of Systems Management , vol.45 , Issue.12 , pp. 30-35
    • Kim, B.O.1
  • 21
    • 21844495190 scopus 로고
    • Process re-engineering: the strategic dimensions
    • spring
    • King, W.R. (1994), “Process re-engineering: the strategic dimensions”, Information Systems Management, Vol. 11 No. 2, spring, pp. 71-73.
    • (1994) Information Systems Management , vol.11 , Issue.2 , pp. 71-73
    • King, W.R.1
  • 22
    • 0342828486 scopus 로고
    • IEs fill facilitator role in benchmarking operations to improve performance
    • September
    • Klein, M.M. (1993), “IEs fill facilitator role in benchmarking operations to improve performance”, Industrial Engineering, Vol. 25 No. 9, September, pp. 40-42.
    • (1993) Industrial Engineering , vol.25 , Issue.9 , pp. 40-42
    • Klein, M.M.1
  • 23
    • 84952133027 scopus 로고
    • Re-engineering methodologies and tools: a prescription for enhancing success
    • Spring
    • Klein, M.M. (1994a), “Re-engineering methodologies and tools: a prescription for enhancing success”, Information Systems Management, Vol. 11 No. 2, Spring, pp. 30-35.
    • (1994) Information Systems Management , vol.11 , Issue.2 , pp. 30-35
    • Klein, M.M.1
  • 24
    • 0012930666 scopus 로고
    • The most fatal re-engineering mistakes
    • Summer
    • Klein, M.M. (1994b), “The most fatal re-engineering mistakes”, Information Strategy: The Executive’s Journal, Vol. 10 No. 4, Summer, pp. 21-28.
    • (1994) Information Strategy: The Executive’s Journal , vol.10 , Issue.4 , pp. 21-28
    • Klein, M.M.1
  • 25
    • 84984726744 scopus 로고
    • Leading change: why transformation efforts fail
    • March/April
    • Kotter, J. P. (1995), “Leading change: why transformation efforts fail”, Harvard Business Review, Vol. 73 No. 2, March/April, pp. 59-67.
    • (1995) Harvard Business Review , vol.73 , Issue.2 , pp. 59-67
    • Kotter, J.P.1
  • 26
    • 84986178736 scopus 로고
    • Corporate re-engineering should not stop at the factory door
    • August
    • Ligeti, M. (1994), “Corporate re-engineering should not stop at the factory door”, Industrial Engineering, Vol. 26 No. 8, August, pp. 14-15.
    • (1994) Industrial Engineering , vol.26 , Issue.8 , pp. 14-15
    • Ligeti, M.1
  • 27
    • 84986015395 scopus 로고
    • Business process re-engineering
    • 13 October
    • Maglitta, J. (1994), “Business process re-engineering”, Computerworld, Vol. 12 No. 2, 13 October, pp. 26-28.
    • (1994) Computerworld , vol.12 , Issue.2 , pp. 26-28
    • Maglitta, J.1
  • 28
    • 30244441443 scopus 로고
    • “Manufacturing expert answers top 10 questions about reengineering”, Managing Office Technology, October
    • Managing Office Technology (1994), “Manufacturing expert answers top 10 questions about reengineering”, Managing Office Technology, Vol. 39 No. 10, October, pp. 22-24.
    • (1994) Managing Office Technology , vol.39 , Issue.10 , pp. 22-24
  • 29
    • 0342856519 scopus 로고
    • Define ‘re-engineer’
    • 19 July
    • Manganelli, R.L. (1993), “Define ‘re-engineer’”, Computerworld, Vol. 27 No. 29, 19 July, pp. 86-87.
    • (1993) Computerworld , vol.27 , Issue.29 , pp. 86-87
    • Manganelli, R.L.1
  • 31
    • 0041197835 scopus 로고
    • Should you start from scratch?
    • July
    • Manganelli, R.L. and Klein, M.M. (1994b), “Should you start from scratch?”, Management Review, Vol. 83 No. 7, July, pp. 45-47.
    • (1994) Management Review , vol.83 , Issue.7 , pp. 45-47
    • Manganelli, R.L.1    Klein, M.M.2
  • 32
    • 30244541293 scopus 로고
    • Does re-engineering really work?
    • February, 32-8
    • Mathews, R. (1995), “Does re-engineering really work?”, Progressive Grocer, Vol. 74 No. 2, February, pp. 29, 32-8.
    • (1995) Progressive Grocer , vol.74 , Issue.2 , pp. 29
    • Mathews, R.1
  • 33
    • 84986051481 scopus 로고
    • Customer service drives re-engineering effort
    • November
    • Miller, M. (1994), “Customer service drives re-engineering effort”, Personnel Journal, Vol. 74 No. 11, November, pp. 87-91.
    • (1994) Personnel Journal , vol.74 , Issue.11 , pp. 87-91
    • Miller, M.1
  • 34
    • 84986027231 scopus 로고
    • Executives: get real about re-engineering
    • March
    • Millman, B. (1994), “Executives: get real about re-engineering”, Training & Development, Vol. 48 No. 3, March, pp. 11-12.
    • (1994) Training & Development , vol.48 , Issue.3 , pp. 11-12
    • Millman, B.1
  • 35
    • 0002537664 scopus 로고
    • Does re-engineering really work?
    • 1 August
    • Moad, J. (1993), “Does re-engineering really work?”, Datamation, Vol. 39 No. 15, 1 August, pp. 22-28.
    • (1993) Datamation , vol.39 , Issue.15 , pp. 22-28
    • Moad, J.1
  • 36
    • 0002134062 scopus 로고
    • Successful re-engineering through IT investment
    • Summer
    • Rai, A. and Paper, D. (1994), “Successful re-engineering through IT investment”, Information Strategy: The Executive’s Journal, Vol. 10 No. 4, Summer, pp. 15-20.
    • (1994) Information Strategy: The Executive’s Journal , vol.10 , Issue.4 , pp. 15-20
    • Rai, A.1    Paper, D.2
  • 37
    • 0042443496 scopus 로고
    • Business process re-engineering
    • October
    • Romney, M. (1994), “Business process re-engineering”, The CPA Journal, Vol. 64 No. 10, October, pp. 30-33.
    • (1994) The CPA Journal , vol.64 , Issue.10 , pp. 30-33
    • Romney, M.1
  • 38
    • 21844512322 scopus 로고
    • Reinventing the business
    • spring
    • Ryan, H.W. (1994., “Reinventing the business”, Information Systems Management, Vol. 11 No. 2, spring, pp. 77-9.
    • (1994) Information Systems Management , vol.11 , Issue.2 , pp. 77-79
    • Ryan, H.W.1
  • 39
    • 3543122848 scopus 로고
    • Downsizing, business process re-engineering, and quality improvement plans: how are they related?
    • Spring
    • Scott, G.M. (1995), “Downsizing, business process re-engineering, and quality improvement plans: how are they related?”, Information Strategy: The Executive Journal, Vol. 11 No. 3, Spring, pp. 18-34.
    • (1995) Information Strategy: The Executive Journal , vol.11 , Issue.3 , pp. 18-34
    • Scott, G.M.1
  • 40
    • 84937317464 scopus 로고
    • Business process re-engineering: charting a strategic path for the information age
    • Spring
    • Teng, J.T.C., Grover, V. and Fiedler, K.D. (1994), “Business process re-engineering: charting a strategic path for the information age”, California Management Review, Vol. 37 No. 3, Spring, pp. 9-31.
    • (1994) California Management Review , vol.37 , Issue.3 , pp. 9-31
    • Teng, J.T.C.1    Grover, V.2    Fiedler, K.D.3
  • 41
    • 0345296714 scopus 로고
    • Productivity: re-engineering for competitiveness
    • December
    • Wrennall, W. (1994), “Productivity: re-engineering for competitiveness”, Industrial Engineering, Vol. 26 No. 12, December, pp. 12-14.
    • (1994) Industrial Engineering , vol.26 , Issue.12 , pp. 12-14
    • Wrennall, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.