-
1
-
-
21844493858
-
Productivity gains of BPR
-
Autumn
-
Alavi, M. and Yoo, Y. (1995), “Productivity gains of BPR”, Information Systems Management, Vol. 12 No. 4, Autumn, pp. 43-47.
-
(1995)
Information Systems Management
, vol.12
, Issue.4
, pp. 43-47
-
-
Alavi, M.1
Yoo, Y.2
-
2
-
-
0028515809
-
Is re-engineering compatible with total quality management?
-
September
-
Allender, H.D. (1994), “Is re-engineering compatible with total quality management?”, Industrial Engineering, Vol. 26 No. 9, September, p. 41.
-
(1994)
Industrial Engineering
, vol.26
, Issue.9
, pp. 41
-
-
Allender, H.D.1
-
3
-
-
0001905507
-
Using simulation in the business process re-engineering effort
-
July
-
Ardhaldjian, R. and Fahner, M. (1994), “Using simulation in the business process re-engineering effort”, Industrial Engineering, Vol. 26 No. 27, July, pp. 60-61.
-
(1994)
Industrial Engineering
, vol.26
, Issue.27
, pp. 60-61
-
-
Ardhaldjian, R.1
Fahner, M.2
-
4
-
-
0442314242
-
Re-engineering revisited
-
No. 7, July
-
Bartram, P. (1994), “Re-engineering revisited”, Management Today, No. 7, July, pp. 61-63.
-
(1994)
Management Today
, pp. 61-63
-
-
Bartram, P.1
-
5
-
-
84912129234
-
Preconditions for BPR success
-
Spring
-
Bashein, B.J., Markus, M.L. and Riley, P. (1994), “Preconditions for BPR success”, Information Systems Management, Vol. 11 No. 2, Spring, pp. 7-13.
-
(1994)
Information Systems Management
, vol.11
, Issue.2
, pp. 7-13
-
-
Bashein, B.J.1
Markus, M.L.2
Riley, P.3
-
6
-
-
3543082020
-
Strategic direction: don’t re-engineer without it
-
November/December
-
Berman, S. (1994), “Strategic direction: don’t re-engineer without it”, Planning Review, Vol. 22 No. 6, November/December, pp. 18-23.
-
(1994)
Planning Review
, vol.22
, Issue.6
, pp. 18-23
-
-
Berman, S.1
-
7
-
-
0042713179
-
Translating business re-engineering into bottom-line results
-
January
-
Berrington, C.L. and Oblich, R.L. (1995), “Translating business re-engineering into bottom-line results”, Industrial Engineering, Vol. 27 No. 1, January, pp. 24-27.
-
(1995)
Industrial Engineering
, vol.27
, Issue.1
, pp. 24-27
-
-
Berrington, C.L.1
Oblich, R.L.2
-
8
-
-
3543063895
-
Don’t tinker with it: BPR it!
-
July
-
Classe, A. (1993), “Don’t tinker with it: BPR it!”, Accountancy, Vol. 112 No. 1199, July, pp. 64-66.
-
(1993)
Accountancy
, vol.112
, Issue.1199
, pp. 64-66
-
-
Classe, A.1
-
10
-
-
0002481047
-
The new industrial engineering: information technology and business process redesign
-
summer
-
Davenport, T.H., Short, J.E., et al. (1990), “The new industrial engineering: information technology and business process redesign”, Sloan Management Review, Vol. 31 No. 4, summer, pp. 11-27.
-
(1990)
Sloan Management Review
, vol.31
, Issue.4
, pp. 11-27
-
-
Davenport, T.H.1
Short, J.E.2
-
11
-
-
84968123580
-
Business process re-engineering: improving in new strategic directions
-
summer
-
Dixon, J.R., Arnold, P. et al.(1994), “Business process re-engineering: improving in new strategic directions”, California Management Review, Vol. 36 No. 4, summer, pp. 93-107.
-
(1994)
California Management Review
, vol.36
, Issue.4
, pp. 93-107
-
-
Dixon, J.R.1
Arnold, P.2
-
12
-
-
21844514490
-
Business process redesign: hype, hope or hypocrisy?
-
Edwards, C. and Peppard, J.W. (1994), “Business process redesign: hype, hope or hypocrisy?”, Journal of Information Technology, Vol. 9, pp. 251-266.
-
(1994)
Journal of Information Technology
, vol.9
, pp. 251-266
-
-
Edwards, C.1
Peppard, J.W.2
-
13
-
-
71549132763
-
Information technology-enabled change: the risks and rewards of business process redesign and automation
-
Fiedler, K.D., Grover, V. and Teng, J.T.C. (1994), “Information technology-enabled change: the risks and rewards of business process redesign and automation”, Journal of Information Technology, Vol. 9, pp. 267-275.
-
(1994)
Journal of Information Technology
, vol.9
, pp. 267-275
-
-
Fiedler, K.D.1
Grover, V.2
Teng, J.T.C.3
-
14
-
-
0003563874
-
-
Prentice-Hall, Englewood Cliffs, NJ.
-
Fogler, H.S. and LeBlanc, S.E. (1995), Strategies for Creative Problem Solving, Prentice-Hall, Englewood Cliffs, NJ.
-
(1995)
Strategies for Creative Problem Solving
-
-
Fogler, H.S.1
LeBlanc, S.E.2
-
15
-
-
0005869188
-
Building a foundation for successful business process re-engineering
-
September
-
Hales, H.L. and Savoie, B.J. (1994), “Building a foundation for successful business process re-engineering”, Industrial Engineering, Vol. 26 No. 9, September, pp. 17-19.
-
(1994)
Industrial Engineering
, vol.26
, Issue.9
, pp. 17-19
-
-
Hales, H.L.1
Savoie, B.J.2
-
17
-
-
0012704932
-
A beating the risks of re-engineering
-
15 May
-
Hammer, M. and Stanton, S. (1995), “A beating the risks of re-engineering”, Fortune, Vol. 131 No. 9, 15 May, pp. 47-53.
-
(1995)
Fortune
, vol.131
, Issue.9
, pp. 47-53
-
-
Hammer, M.1
Stanton, S.2
-
19
-
-
0041870790
-
Managing change: why re-engineering projects fail
-
March/April
-
Kiely, T.J. (1995), “Managing change: why re-engineering projects fail”, Harvard Business Review, Vol. 73 No. 2, March/April, p. 15.
-
(1995)
Harvard Business Review
, vol.73
, Issue.2
, pp. 15
-
-
Kiely, T.J.1
-
20
-
-
0012498535
-
Business process re-engineering: building a cross-functional information architecture
-
December
-
Kim, B.O. (1994), “Business process re-engineering: building a cross-functional information architecture”, Journal of Systems Management, Vol. 45 No. 12, December, pp. 30-35.
-
(1994)
Journal of Systems Management
, vol.45
, Issue.12
, pp. 30-35
-
-
Kim, B.O.1
-
21
-
-
21844495190
-
Process re-engineering: the strategic dimensions
-
spring
-
King, W.R. (1994), “Process re-engineering: the strategic dimensions”, Information Systems Management, Vol. 11 No. 2, spring, pp. 71-73.
-
(1994)
Information Systems Management
, vol.11
, Issue.2
, pp. 71-73
-
-
King, W.R.1
-
22
-
-
0342828486
-
IEs fill facilitator role in benchmarking operations to improve performance
-
September
-
Klein, M.M. (1993), “IEs fill facilitator role in benchmarking operations to improve performance”, Industrial Engineering, Vol. 25 No. 9, September, pp. 40-42.
-
(1993)
Industrial Engineering
, vol.25
, Issue.9
, pp. 40-42
-
-
Klein, M.M.1
-
23
-
-
84952133027
-
Re-engineering methodologies and tools: a prescription for enhancing success
-
Spring
-
Klein, M.M. (1994a), “Re-engineering methodologies and tools: a prescription for enhancing success”, Information Systems Management, Vol. 11 No. 2, Spring, pp. 30-35.
-
(1994)
Information Systems Management
, vol.11
, Issue.2
, pp. 30-35
-
-
Klein, M.M.1
-
24
-
-
0012930666
-
The most fatal re-engineering mistakes
-
Summer
-
Klein, M.M. (1994b), “The most fatal re-engineering mistakes”, Information Strategy: The Executive’s Journal, Vol. 10 No. 4, Summer, pp. 21-28.
-
(1994)
Information Strategy: The Executive’s Journal
, vol.10
, Issue.4
, pp. 21-28
-
-
Klein, M.M.1
-
25
-
-
84984726744
-
Leading change: why transformation efforts fail
-
March/April
-
Kotter, J. P. (1995), “Leading change: why transformation efforts fail”, Harvard Business Review, Vol. 73 No. 2, March/April, pp. 59-67.
-
(1995)
Harvard Business Review
, vol.73
, Issue.2
, pp. 59-67
-
-
Kotter, J.P.1
-
26
-
-
84986178736
-
Corporate re-engineering should not stop at the factory door
-
August
-
Ligeti, M. (1994), “Corporate re-engineering should not stop at the factory door”, Industrial Engineering, Vol. 26 No. 8, August, pp. 14-15.
-
(1994)
Industrial Engineering
, vol.26
, Issue.8
, pp. 14-15
-
-
Ligeti, M.1
-
27
-
-
84986015395
-
Business process re-engineering
-
13 October
-
Maglitta, J. (1994), “Business process re-engineering”, Computerworld, Vol. 12 No. 2, 13 October, pp. 26-28.
-
(1994)
Computerworld
, vol.12
, Issue.2
, pp. 26-28
-
-
Maglitta, J.1
-
28
-
-
30244441443
-
“Manufacturing expert answers top 10 questions about reengineering”, Managing Office Technology, October
-
Managing Office Technology (1994), “Manufacturing expert answers top 10 questions about reengineering”, Managing Office Technology, Vol. 39 No. 10, October, pp. 22-24.
-
(1994)
Managing Office Technology
, vol.39
, Issue.10
, pp. 22-24
-
-
-
29
-
-
0342856519
-
Define ‘re-engineer’
-
19 July
-
Manganelli, R.L. (1993), “Define ‘re-engineer’”, Computerworld, Vol. 27 No. 29, 19 July, pp. 86-87.
-
(1993)
Computerworld
, vol.27
, Issue.29
, pp. 86-87
-
-
Manganelli, R.L.1
-
30
-
-
0004592881
-
Your re-engineering toolkit
-
August
-
Manganelli, R.L. and Klein, M.M. (1994a), “Your re-engineering toolkit”, American Management Association, Vol. 83 No. 8, August, pp. 26-30.
-
(1994)
American Management Association
, vol.83
, Issue.8
, pp. 26-30
-
-
Manganelli, R.L.1
Klein, M.M.2
-
31
-
-
0041197835
-
Should you start from scratch?
-
July
-
Manganelli, R.L. and Klein, M.M. (1994b), “Should you start from scratch?”, Management Review, Vol. 83 No. 7, July, pp. 45-47.
-
(1994)
Management Review
, vol.83
, Issue.7
, pp. 45-47
-
-
Manganelli, R.L.1
Klein, M.M.2
-
32
-
-
30244541293
-
Does re-engineering really work?
-
February, 32-8
-
Mathews, R. (1995), “Does re-engineering really work?”, Progressive Grocer, Vol. 74 No. 2, February, pp. 29, 32-8.
-
(1995)
Progressive Grocer
, vol.74
, Issue.2
, pp. 29
-
-
Mathews, R.1
-
33
-
-
84986051481
-
Customer service drives re-engineering effort
-
November
-
Miller, M. (1994), “Customer service drives re-engineering effort”, Personnel Journal, Vol. 74 No. 11, November, pp. 87-91.
-
(1994)
Personnel Journal
, vol.74
, Issue.11
, pp. 87-91
-
-
Miller, M.1
-
34
-
-
84986027231
-
Executives: get real about re-engineering
-
March
-
Millman, B. (1994), “Executives: get real about re-engineering”, Training & Development, Vol. 48 No. 3, March, pp. 11-12.
-
(1994)
Training & Development
, vol.48
, Issue.3
, pp. 11-12
-
-
Millman, B.1
-
35
-
-
0002537664
-
Does re-engineering really work?
-
1 August
-
Moad, J. (1993), “Does re-engineering really work?”, Datamation, Vol. 39 No. 15, 1 August, pp. 22-28.
-
(1993)
Datamation
, vol.39
, Issue.15
, pp. 22-28
-
-
Moad, J.1
-
36
-
-
0002134062
-
Successful re-engineering through IT investment
-
Summer
-
Rai, A. and Paper, D. (1994), “Successful re-engineering through IT investment”, Information Strategy: The Executive’s Journal, Vol. 10 No. 4, Summer, pp. 15-20.
-
(1994)
Information Strategy: The Executive’s Journal
, vol.10
, Issue.4
, pp. 15-20
-
-
Rai, A.1
Paper, D.2
-
37
-
-
0042443496
-
Business process re-engineering
-
October
-
Romney, M. (1994), “Business process re-engineering”, The CPA Journal, Vol. 64 No. 10, October, pp. 30-33.
-
(1994)
The CPA Journal
, vol.64
, Issue.10
, pp. 30-33
-
-
Romney, M.1
-
38
-
-
21844512322
-
Reinventing the business
-
spring
-
Ryan, H.W. (1994., “Reinventing the business”, Information Systems Management, Vol. 11 No. 2, spring, pp. 77-9.
-
(1994)
Information Systems Management
, vol.11
, Issue.2
, pp. 77-79
-
-
Ryan, H.W.1
-
39
-
-
3543122848
-
Downsizing, business process re-engineering, and quality improvement plans: how are they related?
-
Spring
-
Scott, G.M. (1995), “Downsizing, business process re-engineering, and quality improvement plans: how are they related?”, Information Strategy: The Executive Journal, Vol. 11 No. 3, Spring, pp. 18-34.
-
(1995)
Information Strategy: The Executive Journal
, vol.11
, Issue.3
, pp. 18-34
-
-
Scott, G.M.1
-
40
-
-
84937317464
-
Business process re-engineering: charting a strategic path for the information age
-
Spring
-
Teng, J.T.C., Grover, V. and Fiedler, K.D. (1994), “Business process re-engineering: charting a strategic path for the information age”, California Management Review, Vol. 37 No. 3, Spring, pp. 9-31.
-
(1994)
California Management Review
, vol.37
, Issue.3
, pp. 9-31
-
-
Teng, J.T.C.1
Grover, V.2
Fiedler, K.D.3
-
41
-
-
0345296714
-
Productivity: re-engineering for competitiveness
-
December
-
Wrennall, W. (1994), “Productivity: re-engineering for competitiveness”, Industrial Engineering, Vol. 26 No. 12, December, pp. 12-14.
-
(1994)
Industrial Engineering
, vol.26
, Issue.12
, pp. 12-14
-
-
Wrennall, W.1
|