메뉴 건너뛰기




Volumn 2, Issue 2, 2005, Pages 1-21

Site implementation and assessment of lean construction techniques

Author keywords

Last planner; Lean construction

Indexed keywords

CONSTRUCTION INDUSTRY; QUALITY CONTROL; SURVEYS; VISUALIZATION;

EID: 84979770557     PISSN: None     EISSN: 15551369     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (135)

References (23)
  • 2
    • 0004011301 scopus 로고    scopus 로고
    • Ph.D. thesis, Univ. Birmingham, Birmingham, United Kingdom, Sep. 3, 2003
    • Ballard, G. (2000) “The last planner system of production control” Ph.D. thesis, Univ. Birmingham, Birmingham, United Kingdom (Sep. 3, 2003)
    • (2000) The Last Planner System of Production Control
    • Ballard, G.1
  • 3
    • 13944266838 scopus 로고    scopus 로고
    • th Conf. of Int. Group for Lean Construction, Univ. California, Berkeley, CA
    • th Conf. of Int. Group for Lean Construction, Univ. California, Berkeley, CA., 275-286.
    • (1999) Improving Work Flow Reliability , pp. 275-286
    • Ballard, G.1
  • 6
    • 85026649821 scopus 로고    scopus 로고
    • ASC Proc. 35th Annual Conf. April 7-10 Associated Schools of Construction. San Luis Obispo, CA
    • Banik, G. (1999). "Construction productivity improvement." ASC Proc. 35th Annual Conf. April 7-10 Associated Schools of Construction. San Luis Obispo, CA., 165-178.
    • (1999) Construction Productivity Improvement , pp. 165-178
    • Banik, G.1
  • 12
    • 0003656231 scopus 로고
    • CIFE Tech. Rep. No.72, Center for Integrated Facility Engineering, Stanford Univ., Stanford, CA
    • Koskela, K. (1992). "Application of the new production philosophy to construction." CIFE Tech. Rep. No.72, Center for Integrated Facility Engineering, Stanford Univ., Stanford, CA., 4-50.
    • (1992) Application of the New Production Philosophy to Construction , pp. 4-50
    • Koskela, K.1
  • 13
    • 0002303124 scopus 로고    scopus 로고
    • Triumph of the lean production system
    • Krafick, J. (1998). “Triumph of the lean production system.” Sloan Management Review, 30 (1), 41-52.
    • (1998) Sloan Management Review , vol.30 , Issue.1 , pp. 41-52
    • Krafick, J.1
  • 15
    • 14844324604 scopus 로고    scopus 로고
    • Benchmarking and improving construction productivity
    • Mohamed, S. (1996) “Benchmarking and improving construction productivity” Benchmarking for Quality Management & Technology, 3(3), 50-58
    • (1996) Benchmarking for Quality Management & Technology , vol.3 , Issue.3 , pp. 50-58
    • Mohamed, S.1
  • 19
    • 17744374988 scopus 로고
    • Moving from Lean Manufacturing to Lean Construction: Toward a Common Sociotechnological Framework
    • Paez, O., Salem, S., Solomon, J., and Genaidy, A. (1995) "Moving from Lean Manufacturing to Lean Construction: Toward a Common Sociotechnological Framework." Human Factors and Ergonomics in Manufacturing, 15(2), 233-245.
    • (1995) Human Factors and Ergonomics in Manufacturing , vol.15 , Issue.2 , pp. 233-245
    • Paez, O.1    Salem, S.2    Solomon, J.3    Genaidy, A.4
  • 23
    • 84891079373 scopus 로고    scopus 로고
    • The Manufacturing Resources Group of Companies (MRGC), The article was originally written for the Durham Region Manufactures Association (DRMA) Feb. 2003 newsletter, Sep. 3, 2003
    • Spoore, T. (2003). Five S (5S): “The key to Simplified Lean Manufacturing.” The Manufacturing Resources Group of Companies (MRGC), The article was originally written for the Durham Region Manufactures Association (DRMA) Feb. 2003 newsletter. (Sep. 3, 2003).
    • (2003) Five S (5S): “The Key to Simplified Lean Manufacturing.”
    • Spoore, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.