|
Volumn , Issue , 1999, Pages 263-
|
The maintenance schedule optimization in an interconnected power system using the levelized risk method
a
a
NONE
|
Author keywords
[No Author keywords available]
|
Indexed keywords
AUDITION;
EQUIPMENT, DEVICES AND APPARATUS;
MAINTENANCE;
REPAIR;
MAINTENANCE SCHEDULES;
OPERATING CONDITION;
OPERATION MANAGEMENT;
PLANNING AND DESIGNINGS;
POWER GENERATING UNITS;
POWER SYSTEM EQUIPMENTS;
POWER SYSTEM RELIABILITY;
SCHEDULED MAINTENANCE;
RELIABILITY;
|
EID: 84978659846
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1109/PTC.1999.826695 Document Type: Conference Paper |
Times cited : (4)
|
References (0)
|