-
1
-
-
56749092458
-
Integrated Project Delivery: A Guide, The American Institute of Architects
-
(01/25, 2011)
-
AIA National, and AIA California C., Integrated Project Delivery: A Guide, The American Institute of Architects. http://www.ipd-ca.net/images/IPDeliveryGuide_final_revised.pdf, 2007 (01/25, 2011).
-
(2007)
-
-
AIA National, and AIA California C.,1
-
2
-
-
77954795877
-
Integrated Project Delivery: case studies
-
(4/20, 2012)
-
AIA National, and AIA California C., Integrated Project Delivery: case studies. http://www.klingstubbins.com/ks_testsite/about/pdfs_articles/Jan_01_10_AIA_IPD%20CaseStudies_Autodesk.pdf, 2010 (4/20, 2012).
-
(2010)
-
-
AIA National, and AIA California C.,1
-
3
-
-
84866186933
-
Project performance modeling: a methodology for evaluating project execution strategies
-
Construction Industry Institute, The University of Texas at Austin (210 pp.)
-
Alarcón, L.F., Ashley, D.B., Project performance modeling: a methodology for evaluating project execution strategies. Source Document 80, 1992, Construction Industry Institute, The University of Texas at Austin (210 pp.).
-
(1992)
Source Document 80
-
-
Alarcón, L.F.1
Ashley, D.B.2
-
4
-
-
0001386480
-
Modeling project performance for decision making
-
Alarcón, L., Ashley, D., Modeling project performance for decision making. J. Constr. Eng. Manag. 122:3 (1996), 265–273.
-
(1996)
J. Constr. Eng. Manag.
, vol.122
, Issue.3
, pp. 265-273
-
-
Alarcón, L.1
Ashley, D.2
-
5
-
-
0032094651
-
Project management decision making using cross-impact analysis
-
(1998)
-
Alarcón, L.F., Ashley, D.B., Project management decision making using cross-impact analysis. Int. J. Proj. Manag. 16:3 (1998), 145–152 (1998).
-
(1998)
Int. J. Proj. Manag.
, vol.16
, Issue.3
, pp. 145-152
-
-
Alarcón, L.F.1
Ashley, D.B.2
-
6
-
-
84992996738
-
A Computer Environment to Support the Strategic Decision-Making Process in Construction Firms
-
Blackwell-Science
-
Alarcón, L.F., Bastías, A., A Computer Environment to Support the Strategic Decision-Making Process in Construction Firms. Engineering, Construction and Architectural Management, 7(1), 2000, Blackwell-Science, 63–75.
-
(2000)
Engineering, Construction and Architectural Management
, vol.71
, pp. 63-75
-
-
Alarcón, L.F.1
Bastías, A.2
-
7
-
-
11944252554
-
Performance modeling for contractor selection
-
Alarcón, L., Mourgues, C., Performance modeling for contractor selection. J. Manag. Eng. 18:2 (2002), 52–60.
-
(2002)
J. Manag. Eng.
, vol.18
, Issue.2
, pp. 52-60
-
-
Alarcón, L.1
Mourgues, C.2
-
8
-
-
84876745922
-
Collaborating with a permitting agency to deliver a healthcare project: case study of the Sutter Medical Center Castro Valley (SMCCV)
-
Alarcón, I., Chritian, D., Tommelein, I., Collaborating with a permitting agency to deliver a healthcare project: case study of the Sutter Medical Center Castro Valley (SMCCV). Proceedings of the 19th Annual Conference of the International Group for Lean Construction IGLC 19, Lima, Peru, July 13–15, 2011.
-
(2011)
Proceedings of the 19th Annual Conference of the International Group for Lean Construction IGLC 19, Lima, Peru, July 13–15
-
-
Alarcón, I.1
Chritian, D.2
Tommelein, I.3
-
9
-
-
0006969527
-
Quality in the Constructed Project: A Guide for Owners, Designers and Constructors
-
second ed American Society of Civil Engineers Reston, Virginia
-
ASCE, Quality in the Constructed Project: A Guide for Owners, Designers and Constructors. second ed, 2000, American Society of Civil Engineers, Reston, Virginia.
-
(2000)
-
-
ASCE1
-
10
-
-
1342287952
-
Effective partnering tools in construction: a case study on MTRC TKE contract 604 in Hong Kong
-
Bayliss, R., Cheung, S., Suen, H.C.H., Wong, S., Effective partnering tools in construction: a case study on MTRC TKE contract 604 in Hong Kong. Int. J. Proj. Manag. 22:3 (2004), 253–263.
-
(2004)
Int. J. Proj. Manag.
, vol.22
, Issue.3
, pp. 253-263
-
-
Bayliss, R.1
Cheung, S.2
Suen, H.C.H.3
Wong, S.4
-
11
-
-
0004013907
-
Trusting the Team: The Best Practice Guide to Partnering in Construction
-
Reading Construction Forum Reading
-
Bennett, J., Jayes, S., Trusting the Team: The Best Practice Guide to Partnering in Construction. 1995, Reading Construction Forum, Reading.
-
(1995)
-
-
Bennett, J.1
Jayes, S.2
-
12
-
-
0004121619
-
The Seven Pillars of Partnering: A Guide to Second Generation Partnering
-
Thomas Telford Publishers London
-
Bennett, J., Jayes, S., The Seven Pillars of Partnering: A Guide to Second Generation Partnering. 1998, Thomas Telford Publishers, London.
-
(1998)
-
-
Bennett, J.1
Jayes, S.2
-
13
-
-
0033714293
-
An analysis of success factors and benefits of partnering in construction
-
Black, C., Akintoye, A., Fitzgerald, E., An analysis of success factors and benefits of partnering in construction. Int. J. Proj. Manag. 18:6 (2000), 423–434.
-
(2000)
Int. J. Proj. Manag.
, vol.18
, Issue.6
, pp. 423-434
-
-
Black, C.1
Akintoye, A.2
Fitzgerald, E.3
-
14
-
-
0042139332
-
Partnering to save troubled projects
-
Brown, J., Partnering to save troubled projects. J. Manag. Eng. 10:3 (1994), 22–25.
-
(1994)
J. Manag. Eng.
, vol.10
, Issue.3
, pp. 22-25
-
-
Brown, J.1
-
15
-
-
77956304467
-
Interrelationships among construction injury prevention strategies: a cross-impact analysis
-
Calhoun, M., Hallowell, M., Interrelationships among construction injury prevention strategies: a cross-impact analysis. Construction Research Congress 2010, 2010, 1264–1273.
-
(2010)
Construction Research Congress 2010
, pp. 1264-1273
-
-
Calhoun, M.1
Hallowell, M.2
-
16
-
-
0042155411
-
An empirical study of the benefits of construction partnering in Hong Kong
-
Chan, A.P.C., Chan, D.W.M., Ho, K.S.K., An empirical study of the benefits of construction partnering in Hong Kong. Constr. Manag. Econ. 21:5 (2003), 523–533.
-
(2003)
Constr. Manag. Econ.
, vol.21
, Issue.5
, pp. 523-533
-
-
Chan, A.P.C.1
Chan, D.W.M.2
Ho, K.S.K.3
-
17
-
-
13944264358
-
Exploring critical success factors for partnering in construction projects
-
Chan, A.P.C., Chan, D.W.M., Chiang, Y.H., Tang, B.S., Chan, E.H.W., Ho, K.S.K., Exploring critical success factors for partnering in construction projects. J. Constr. Eng. Manag. 130:2 (2004), 188–198.
-
(2004)
J. Constr. Eng. Manag.
, vol.130
, Issue.2
, pp. 188-198
-
-
Chan, A.P.C.1
Chan, D.W.M.2
Chiang, Y.H.3
Tang, B.S.4
Chan, E.H.W.5
Ho, K.S.K.6
-
18
-
-
84875115223
-
Relational Contracting for Construction Excellence
-
Spon Press London
-
Chan, A., Chan, D., Yeung, J., Relational Contracting for Construction Excellence. 2010, Spon Press, London.
-
(2010)
-
-
Chan, A.1
Chan, D.2
Yeung, J.3
-
19
-
-
0034149307
-
Establishment of critical success factors for construction partnering
-
Cheng, E., Li, H., Love, P., Establishment of critical success factors for construction partnering. J. Manag. Eng. 16:2 (2000), 84–92.
-
(2000)
J. Manag. Eng.
, vol.16
, Issue.2
, pp. 84-92
-
-
Cheng, E.1
Li, H.2
Love, P.3
-
20
-
-
0003804554
-
Logistics and Supply Chain Management: Strategies for Reducing Costs and Improving Service
-
Pitman Publishing London
-
Christopher, M., Logistics and Supply Chain Management: Strategies for Reducing Costs and Improving Service. 1992, Pitman Publishing, London.
-
(1992)
-
-
Christopher, M.1
-
21
-
-
0034487749
-
Building environmental assessment methods: assessing construction practices
-
Cole, R.J., Building environmental assessment methods: assessing construction practices. Constr. Manag. Econ. 18:8 (2000), 949–957.
-
(2000)
Constr. Manag. Econ.
, vol.18
, Issue.8
, pp. 949-957
-
-
Cole, R.J.1
-
22
-
-
0004030735
-
Partnering: Models for Success
-
Partnering Task Force, Construction Industry Institute Australia
-
Construction Industry Institute (Australia) (CII), Partnering: Models for Success. 1996, Partnering Task Force, Construction Industry Institute, Australia.
-
(1996)
-
-
Construction Industry Institute (Australia) (CII)1
-
24
-
-
84856982574
-
Rethinking the “G” in GMP: why estimated maximum price contracts make sense on collaborative projects
-
Darrington, J., Lichtig, W.A., Rethinking the “G” in GMP: why estimated maximum price contracts make sense on collaborative projects. Constr. Lawyer 30:2 (2010), 1–12.
-
(2010)
Constr. Lawyer
, vol.30
, Issue.2
, pp. 1-12
-
-
Darrington, J.1
Lichtig, W.A.2
-
25
-
-
0032365776
-
Between trust and control: developing confidence in partner cooperation in alliances
-
Das, T.K., Teng, B., Between trust and control: developing confidence in partner cooperation in alliances. Acad. Manag. Rev. 23:3 (1998), 491–512.
-
(1998)
Acad. Manag. Rev.
, vol.23
, Issue.3
, pp. 491-512
-
-
Das, T.K.1
Teng, B.2
-
26
-
-
3042632559
-
Project Delivery Systems for Building Construction
-
Associated Genereal Contractors of America
-
Dorsey, R.W., Project Delivery Systems for Building Construction. 1997, Associated Genereal Contractors of America.
-
(1997)
-
-
Dorsey, R.W.1
-
27
-
-
0003732501
-
Rethinking Construction
-
Construction Task force, London UK (Retreived May 8, 2013:)
-
Egan, J., Rethinking Construction. 1998, Construction Task force, London, UK (Retreived May 8, 2013: http://www.architecture.com/Files/RIBAHoldings/PolicyAndInternationalRelations/Policy/PublicAffairs/RethinkingConstruction.pdf).
-
(1998)
-
-
Egan, J.1
-
28
-
-
84886568744
-
Quantifying performance for the integrated project delivery system as compared to established delivery systems
-
El Asmar, M., Hanna, A., Loh, W., Quantifying performance for the integrated project delivery system as compared to established delivery systems. J. Constr. Eng. Manag., 139(11), 2013, 04013012.
-
(2013)
J. Constr. Eng. Manag.
, vol.139
, Issue.11
, pp. 04013012
-
-
El Asmar, M.1
Hanna, A.2
Loh, W.3
-
29
-
-
78650810970
-
Effects of cooperative procurement procedures on construction project performance: a conceptual framework
-
Eriksson, P.E., Westerberg, M., Effects of cooperative procurement procedures on construction project performance: a conceptual framework. Int. J. Proj. Manag. 29:2 (2011), 197–208.
-
(2011)
Int. J. Proj. Manag.
, vol.29
, Issue.2
, pp. 197-208
-
-
Eriksson, P.E.1
Westerberg, M.2
-
30
-
-
0004044503
-
Managing Construction Contracts: Operational Control for Commercial Risks
-
second ed John. Wiley and Sons New York, N.Y.
-
Gilbreath, R.D., Managing Construction Contracts: Operational Control for Commercial Risks. second ed, 1992, John. Wiley and Sons, New York, N.Y.
-
(1992)
-
-
Gilbreath, R.D.1
-
31
-
-
67650080321
-
Empirical comparison of design/build and design/bid/build project delivery methods
-
Hale, D.R., Shrestha, P.P., Gibson, J., Edward, G., Migliaccio, G.C., Empirical comparison of design/build and design/bid/build project delivery methods. J. Constr. Eng. Manag. 135:7 (2009), 579–587.
-
(2009)
J. Constr. Eng. Manag.
, vol.135
, Issue.7
, pp. 579-587
-
-
Hale, D.R.1
Shrestha, P.P.2
Gibson, J.3
Edward, G.4
Migliaccio, G.C.5
-
32
-
-
75649150289
-
Qualitative research: application of the Delphi method to CEM research
-
Hallowell, M., Gambatese, J., Qualitative research: application of the Delphi method to CEM research. J. Constr. Eng. Manag. 136:1 (2010), 99–107.
-
(2010)
J. Constr. Eng. Manag.
, vol.136
, Issue.1
, pp. 99-107
-
-
Hallowell, M.1
Gambatese, J.2
-
33
-
-
13944273891
-
The partnering philosophy – a procurement strategy for satisfaction through a team work solution to project quality
-
Hellard, R.B., The partnering philosophy – a procurement strategy for satisfaction through a team work solution to project quality. J. Constr. Procure. 2:1 (1996), 41–55.
-
(1996)
J. Constr. Procure.
, vol.2
, Issue.1
, pp. 41-55
-
-
Hellard, R.B.1
-
34
-
-
13944260870
-
Project delivery systems and project change: quantitative analysis
-
Ibbs, C., Kwak, Y., Ng, T., Odabasi, A., Project delivery systems and project change: quantitative analysis. J. Constr. Eng. Manag. 129:4 (2003), 382–386.
-
(2003)
J. Constr. Eng. Manag.
, vol.129
, Issue.4
, pp. 382-386
-
-
Ibbs, C.1
Kwak, Y.2
Ng, T.3
Odabasi, A.4
-
36
-
-
18144374111
-
Factors affecting cost performance: evidence from Indian construction projects
-
Iyer, K.C., Jha, K.N., Factors affecting cost performance: evidence from Indian construction projects. Int. J. Proj. Manag. 23:4 (2005), 283–295.
-
(2005)
Int. J. Proj. Manag.
, vol.23
, Issue.4
, pp. 283-295
-
-
Iyer, K.C.1
Jha, K.N.2
-
37
-
-
84976911348
-
Design–Build Essentials, Delmar, Cengage Learning, New York, USA
-
Jackson, B.J., Design–Build Essentials, Delmar, Cengage Learning, New York, USA. 2011.
-
(2011)
-
-
Jackson, B.J.1
-
38
-
-
84875299000
-
Project Delivery Systems for Construction
-
The Associated General Contractors of America Arlington
-
Kenig, M.E., Project Delivery Systems for Construction. 2011, The Associated General Contractors of America, Arlington.
-
(2011)
-
-
Kenig, M.E.1
-
39
-
-
85009748643
-
What makes the delivery of a project integrated? a case study of Children's Hospital, Bellevue, WA
-
Kim, Y., Dossick, C.S., What makes the delivery of a project integrated? a case study of Children's Hospital, Bellevue, WA. Lean Constr. J., 2011, 53–66.
-
(2011)
Lean Constr. J.
, pp. 53-66
-
-
Kim, Y.1
Dossick, C.S.2
-
40
-
-
0032207592
-
Comparison of US project delivery systems
-
Konchar, M., Sanvido, V., Comparison of US project delivery systems. J. Constr. Eng. Manag. ASCE 124:6 (1998), 435–444.
-
(1998)
J. Constr. Eng. Manag. ASCE
, vol.124
, Issue.6
, pp. 435-444
-
-
Konchar, M.1
Sanvido, V.2
-
41
-
-
0031142116
-
Partnering on construction projects: a study of the relationship between partnering activities and project success
-
Larson, E., Partnering on construction projects: a study of the relationship between partnering activities and project success. Eng. Manag. IEEE Trans. 44:2 (1997), 188–195.
-
(1997)
Eng. Manag. IEEE Trans.
, vol.44
, Issue.2
, pp. 188-195
-
-
Larson, E.1
-
42
-
-
0003654985
-
Constructing the Team, Final Report of the Joint Review of Procurement and Contractual Arrangements in the United Kingdom Construction Industry
-
HMSO London
-
Latham, M., Constructing the Team, Final Report of the Joint Review of Procurement and Contractual Arrangements in the United Kingdom Construction Industry. 1994, HMSO, London.
-
(1994)
-
-
Latham, M.1
-
43
-
-
0035313910
-
Co-operative benchmarking: a tool for partnering excellence in construction
-
Li, H., Cheng, E.W.L., Love, P.E.D., Irani, Z., Co-operative benchmarking: a tool for partnering excellence in construction. Int. J. Proj. Manag. 19:3 (2001), 171–179.
-
(2001)
Int. J. Proj. Manag.
, vol.19
, Issue.3
, pp. 171-179
-
-
Li, H.1
Cheng, E.W.L.2
Love, P.E.D.3
Irani, Z.4
-
44
-
-
77955340018
-
The integrated agreement for lean project delivery
-
Lichtig, W.A., The integrated agreement for lean project delivery. Constr. Lawyer 26:3 (2006), 1–8.
-
(2006)
Constr. Lawyer
, vol.26
, Issue.3
, pp. 1-8
-
-
Lichtig, W.A.1
-
45
-
-
78751513125
-
Risk/reward compensation model for civil engineering infrastructure alliance projects
-
Love, P., Davis, P., Chevis, R., Edwards, D., Risk/reward compensation model for civil engineering infrastructure alliance projects. J. Constr. Eng. Manag. 137:2 (2011), 127–136.
-
(2011)
J. Constr. Eng. Manag.
, vol.137
, Issue.2
, pp. 127-136
-
-
Love, P.1
Davis, P.2
Chevis, R.3
Edwards, D.4
-
46
-
-
84655167893
-
The effect of relationship management on project performance in construction
-
Meng, X., The effect of relationship management on project performance in construction. Int. J. Proj. Manag. 30:2 (2012), 188–198.
-
(2012)
Int. J. Proj. Manag.
, vol.30
, Issue.2
, pp. 188-198
-
-
Meng, X.1
-
47
-
-
79955438732
-
Maturity model for supply chain relationships in construction
-
Meng, X., Sun, M., Jones, M., Maturity model for supply chain relationships in construction. J. Manag. Eng. 27:2 (2011), 97–105.
-
(2011)
J. Manag. Eng.
, vol.27
, Issue.2
, pp. 97-105
-
-
Meng, X.1
Sun, M.2
Jones, M.3
-
48
-
-
0033705836
-
Management-driven integration
-
Mitropoulos, P., Tatum, C., Management-driven integration. J. Manag. Eng. 16:1 (2000), 48–58.
-
(2000)
J. Manag. Eng.
, vol.16
, Issue.1
, pp. 48-58
-
-
Mitropoulos, P.1
Tatum, C.2
-
49
-
-
1542388637
-
Work-group communication patterns in design and build project teams: an investigative framework
-
Moore, D.R., Dainty, A.R.J., Work-group communication patterns in design and build project teams: an investigative framework. J. Constr. Procure. 6:1 (2000), 44–55.
-
(2000)
J. Constr. Procure.
, vol.6
, Issue.1
, pp. 44-55
-
-
Moore, D.R.1
Dainty, A.R.J.2
-
50
-
-
2342510870
-
How important is cooperation to construction project success? A grounded empirical quantification
-
Phua, F.T.T., Rowlinson, S., How important is cooperation to construction project success? A grounded empirical quantification. Eng. Constr. Archit. Manag. 11:1 (2004), 45–54.
-
(2004)
Eng. Constr. Archit. Manag.
, vol.11
, Issue.1
, pp. 45-54
-
-
Phua, F.T.T.1
Rowlinson, S.2
-
51
-
-
37249091613
-
Relational contracting and teambuilding: assessing potential contractual and noncontractual incentives
-
Rahman, M.M., Kumaraswamy, M.M., Relational contracting and teambuilding: assessing potential contractual and noncontractual incentives. J. Manag. Eng. 24:1 (2008), 48–63.
-
(2008)
J. Manag. Eng.
, vol.24
, Issue.1
, pp. 48-63
-
-
Rahman, M.M.1
Kumaraswamy, M.M.2
-
52
-
-
34250195719
-
Building a relational contracting culture and integrated teams
-
Rahman, M.M., Kumaraswamy, M.M., Yng Ling, F.Y., Building a relational contracting culture and integrated teams. Can. J. Civ. Eng. 34:1 (2007), 75–88.
-
(2007)
Can. J. Civ. Eng.
, vol.34
, Issue.1
, pp. 75-88
-
-
Rahman, M.M.1
Kumaraswamy, M.M.2
Yng Ling, F.Y.3
-
54
-
-
0006702564
-
Perceptions on partnering in the public sector
-
Sanders, S.R., Moore, M.M., Perceptions on partnering in the public sector. Proj. Manag. J. 22:4 (1992), 13–19.
-
(1992)
Proj. Manag. J.
, vol.22
, Issue.4
, pp. 13-19
-
-
Sanders, S.R.1
Moore, M.M.2
-
55
-
-
0036778996
-
Implementation of environmental management in the Hong Kong construction industry
-
Shen, L.Y., Tam, V.W.Y., Implementation of environmental management in the Hong Kong construction industry. Int. J. Proj. Manag. 20:7 (2002), 535–543.
-
(2002)
Int. J. Proj. Manag.
, vol.20
, Issue.7
, pp. 535-543
-
-
Shen, L.Y.1
Tam, V.W.Y.2
-
56
-
-
32944458539
-
Partnering mechanism in construction: an empirical study on the Chinese construction industry
-
Tang, W., Duffield, C.F., Young, D.M., Partnering mechanism in construction: an empirical study on the Chinese construction industry. J. Constr. Eng. Manag. 132:3 (2006), 217–229.
-
(2006)
J. Constr. Eng. Manag.
, vol.132
, Issue.3
, pp. 217-229
-
-
Tang, W.1
Duffield, C.F.2
Young, D.M.3
-
57
-
-
39349111005
-
Collaboration, integrated information and the project jifecycle in building design, construction and operation
-
Retreived May 8, 2013:
-
The Construction Users Round Table (CURT), Collaboration, integrated information and the project jifecycle in building design, construction and operation., 2004 Retreived May 8, 2013: http://codebim.com/wp-content/uploads/2013/06/CurtCollaboration.pdf.
-
(2004)
-
-
The Construction Users Round Table (CURT)1
-
58
-
-
27744582527
-
Measuring the impacts of the delivery system on project performance – design–build and design–bid–build
-
(09/27, 2011)
-
Thomas, S.R., Macken, C.L., Chung, T.H., Kim, I., Measuring the impacts of the delivery system on project performance – design–build and design–bid–build. http://fire.nist.gov/bfrlpubs/build02/PDF/b02150.pdf, 2002 (09/27, 2011).
-
(2002)
-
-
Thomas, S.R.1
Macken, C.L.2
Chung, T.H.3
Kim, I.4
-
59
-
-
78649271961
-
Managing integrated project delivery
-
(2010)
-
Thomsen, D.,.J., Dunne, D., Lichtig, W.A., Managing integrated project delivery. http://cmaanet.org/files/shared/ng_Integrated_Project_Delivery__11–19-09__2_.pdf, 2009 (2010).
-
(2009)
-
-
Thomsen, D.J.1
Dunne, D.2
Lichtig, W.A.3
-
60
-
-
84958581073
-
A hybrid cross-impact approach to predicting cost variance of project delivery decisions for highways
-
4015017
-
Tran, D., Molenaar, K., Alarcón, L., A hybrid cross-impact approach to predicting cost variance of project delivery decisions for highways. J. Infrastruct. Syst., 04015017, 2015.
-
(2015)
J. Infrastruct. Syst.
-
-
Tran, D.1
Molenaar, K.2
Alarcón, L.3
-
61
-
-
0000697270
-
Selecting long-term strategies for construction firms
-
Venegas, P., Alarcón, L.F., Selecting long-term strategies for construction firms. J. Constr. Eng. Manag. 123:4 (1997), 388–398.
-
(1997)
J. Constr. Eng. Manag.
, vol.123
, Issue.4
, pp. 388-398
-
-
Venegas, P.1
Alarcón, L.F.2
-
62
-
-
2642537490
-
Procurement Strategies: A Relationship-Based Approach
-
Blackwell Oxford
-
Walker, D., Hampson, K., Procurement Strategies: A Relationship-Based Approach. 2003, Blackwell, Oxford.
-
(2003)
-
-
Walker, D.1
Hampson, K.2
-
63
-
-
54849423329
-
A framework for trust in construction contracting
-
Wong, W.K., Cheung, S.O., Yiu, T.W., Pang, H.Y., A framework for trust in construction contracting. Int. J. Proj. Manag. 26:8 (2008), 821–829.
-
(2008)
Int. J. Proj. Manag.
, vol.26
, Issue.8
, pp. 821-829
-
-
Wong, W.K.1
Cheung, S.O.2
Yiu, T.W.3
Pang, H.Y.4
-
64
-
-
13244265793
-
An agent-based framework for supply chain coordination in construction
-
Xue, X., Li, X., Shen, Q., Wang, Y., An agent-based framework for supply chain coordination in construction. Autom. Constr. 14:3 (2005), 413–430.
-
(2005)
Autom. Constr.
, vol.14
, Issue.3
, pp. 413-430
-
-
Xue, X.1
Li, X.2
Shen, Q.3
Wang, Y.4
-
65
-
-
77956832363
-
Critical review of collaborative working in construction projects: business environment and human behaviors
-
Xue, X., Shen, Q., Ren, Z., Critical review of collaborative working in construction projects: business environment and human behaviors. J. Manag. Eng. 26:4 (2010), 196–208.
-
(2010)
J. Manag. Eng.
, vol.26
, Issue.4
, pp. 196-208
-
-
Xue, X.1
Shen, Q.2
Ren, Z.3
-
66
-
-
84860910554
-
Target value design: using collaboration and a lean approach to reduce construction cost
-
Zimina, D., Ballard, G., Pasquire, C., Target value design: using collaboration and a lean approach to reduce construction cost. Constr. Manag. Econ. 30:5 (2012), 383–398.
-
(2012)
Constr. Manag. Econ.
, vol.30
, Issue.5
, pp. 383-398
-
-
Zimina, D.1
Ballard, G.2
Pasquire, C.3
|