메뉴 건너뛰기




Volumn 270, Issue 1-2, 2018, Pages 489-514

Integrating big data analytic and hybrid firefly-chaotic simulated annealing approach for facility layout problem

Author keywords

Analytical hierarchical process; Big data analytics; Chaotic simulated annealing; Factor analysis; Firefly algorithm; Multi objective stochastic dynamic facility layout problem

Indexed keywords


EID: 84976616703     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1007/s10479-016-2237-x     Document Type: Article
Times cited : (50)

References (57)
  • 1
    • 0035895123 scopus 로고    scopus 로고
    • Fuzzy aproach to the robust facility layout in uncertain production environments
    • Aiello, G., & Enea, M. (2001). Fuzzy aproach to the robust facility layout in uncertain production environments. International Journal of Production Research, 39(18), 4089–4101
    • (2001) International Journal of Production Research , vol.39 , Issue.18 , pp. 4089-4101
    • Aiello, G.1    Enea, M.2
  • 2
    • 0034467669 scopus 로고    scopus 로고
    • Design of flexible plant layouts
    • Benjaafar, S., & Sheikhzadeh, S. (2000). Design of flexible plant layouts. IIE Transactions, 32, 309–322
    • (2000) IIE Transactions , vol.32 , pp. 309-322
    • Benjaafar, S.1    Sheikhzadeh, S.2
  • 4
    • 0242301563 scopus 로고    scopus 로고
    • Layout design in dynamic environments: Strategies and quantitative indices
    • Braglia, M., Zanoni, S., & Zavanella, L. (2003). Layout design in dynamic environments: Strategies and quantitative indices. International Journal of Production Research, 41(5), 995–1016
    • (2003) International Journal of Production Research , vol.41 , Issue.5 , pp. 995-1016
    • Braglia, M.1    Zanoni, S.2    Zavanella, L.3
  • 10
    • 84952531536 scopus 로고
    • A multigoal heuristic for facilities design problem: Mughal
    • Dutta, K. N., & Sahu, S. (1982). A multigoal heuristic for facilities design problem: Mughal. International Journal of Production Research, 20, 147–154
    • (1982) International Journal of Production Research , vol.20 , pp. 147-154
    • Dutta, K.N.1    Sahu, S.2
  • 11
    • 84919389078 scopus 로고    scopus 로고
    • Challenges of big data analtics
    • Fan, J., Han, F., & Liu, H. (2014). Challenges of big data analtics. National Science Review, 1(2), 293–314
    • (2014) National Science Review , vol.1 , Issue.2 , pp. 293-314
    • Fan, J.1    Han, F.2    Liu, H.3
  • 14
    • 0012963222 scopus 로고
    • Flexibility in layouts: A simulation approach
    • Gupta, R. M. (1986). Flexibility in layouts: A simulation approach. Material Flow, 3, 243–250
    • (1986) Material Flow , vol.3 , pp. 243-250
    • Gupta, R.M.1
  • 15
    • 84901705764 scopus 로고    scopus 로고
    • Data quality for data science, predictive analytics, and Big Data in supply chain management: An introduction to the problem and suggestions for research and applications
    • Hazen, B. T., Boone, C. A., Ezell, J. D., & Jones-Farmer, L. A. (2014). Data quality for data science, predictive analytics, and Big Data in supply chain management: An introduction to the problem and suggestions for research and applications. International Journal Production Economic, 154, 72–80
    • (2014) International Journal Production Economic , vol.154 , pp. 72-80
    • Hazen, B.T.1    Boone, C.A.2    Ezell, J.D.3    Jones-Farmer, L.A.4
  • 16
    • 69149090568 scopus 로고    scopus 로고
    • The pathologies of Big Data
    • Jacobs, A. (2009). The pathologies of Big Data. Communications of the ACM, 52(8), 36–44
    • (2009) Communications of the ACM , vol.52 , Issue.8 , pp. 36-44
    • Jacobs, A.1
  • 17
  • 18
    • 84899458050 scopus 로고    scopus 로고
    • Data quality management, data usage experience and acquisition intention of Big Data analytics
    • Kwon, O., Lee, N., & Shin, B. (2014). Data quality management, data usage experience and acquisition intention of Big Data analytics. International Journal of Information Management, 34(3), 387–394
    • (2014) International Journal of Information Management , vol.34 , Issue.3 , pp. 387-394
    • Kwon, O.1    Lee, N.2    Shin, B.3
  • 19
    • 0024139754 scopus 로고
    • Combined computer-aided approach for the facilies design problem and estimation of the distribution parameter in the case of multigoal optimization
    • Khare, V. K., Khare, M. K., & Neema, M. L. (1988). Combined computer-aided approach for the facilies design problem and estimation of the distribution parameter in the case of multigoal optimization. Computers Industrial Engineering, 14, 465–476
    • (1988) Computers Industrial Engineering , vol.14 , pp. 465-476
    • Khare, V.K.1    Khare, M.K.2    Neema, M.L.3
  • 20
    • 0002384937 scopus 로고
    • Assignment problem and the location of economic activities
    • Koopmans, T. C. S., & Beckman, M. (1957). Assignment problem and the location of economic activities. Econometric, 25, 53–76
    • (1957) Econometric , vol.25 , pp. 53-76
    • Koopmans, T.C.S.1    Beckman, M.2
  • 23
    • 0005951153 scopus 로고
    • The plant layout problem in automated manufacturing systems
    • Kouvelis, P., & Kiran, A. S. (1990). The plant layout problem in automated manufacturing systems. Annals of Operations Research, 26, 397–412
    • (1990) Annals of Operations Research , vol.26 , pp. 397-412
    • Kouvelis, P.1    Kiran, A.S.2
  • 24
    • 0026168861 scopus 로고
    • Single and multiple period layout models for automated manufacturing systems
    • Kouvelis, P., & Kiran, A. S. (1991). Single and multiple period layout models for automated manufacturing systems. European Journal of Operational Research, 52, 300–314
    • (1991) European Journal of Operational Research , vol.52 , pp. 300-314
    • Kouvelis, P.1    Kiran, A.S.2
  • 28
    • 84880569666 scopus 로고    scopus 로고
    • Modified simulated annealing based approach for multi objective facility layout problem
    • Matai, R., Singh, S. P., & Mittal, M. L. (2013c). Modified simulated annealing based approach for multi objective facility layout problem. International Journal of Production Research, 51(14), 4273–4288
    • (2013) International Journal of Production Research , vol.51 , Issue.14 , pp. 4273-4288
    • Matai, R.1    Singh, S.P.2    Mittal, M.L.3
  • 29
    • 84963715104 scopus 로고    scopus 로고
    • Unlocking the big promise of big data
    • McGahan, A. (2013). Unlocking the big promise of big data. Totman Management, 6(1), 53–57
    • (2013) Totman Management , vol.6 , Issue.1 , pp. 53-57
    • McGahan, A.1
  • 30
    • 33749834100 scopus 로고    scopus 로고
    • The facility layout problem: Recent and emerging trends and perspectives
    • Meller, R. D., & Gau, K. Y. (1996). The facility layout problem: Recent and emerging trends and perspectives. Journal of Manufacturing Systems, 15, 351–366
    • (1996) Journal of Manufacturing Systems , vol.15 , pp. 351-366
    • Meller, R.D.1    Gau, K.Y.2
  • 31
    • 1542290080 scopus 로고    scopus 로고
    • Application of chaos in simulated annealing
    • Mingjun, J., & Huanwen, T. (2004). Application of chaos in simulated annealing. Chaos, Solutions and Fractals, 21, 933–941
    • (2004) Chaos, Solutions and Fractals , vol.21 , pp. 933-941
    • Mingjun, J.1    Huanwen, T.2
  • 32
    • 84870954331 scopus 로고    scopus 로고
    • Intelligent design of a dynamic machine layout in uncertain environment of flexible manufacturing systems
    • Moslemipour, G., & Lee, T. S. (2011). Intelligent design of a dynamic machine layout in uncertain environment of flexible manufacturing systems. Journal of Intelligent Manufacturing, 23(5), 1849–1860
    • (2011) Journal of Intelligent Manufacturing , vol.23 , Issue.5 , pp. 1849-1860
    • Moslemipour, G.1    Lee, T.S.2
  • 38
    • 84952167046 scopus 로고
    • The single period stochastic plan layout problem
    • Rosenblatt, M. J., & Kropp, D. H. (1992). The single period stochastic plan layout problem. IIE Transactions, 24(2), 169–176
    • (1992) IIE Transactions , vol.24 , Issue.2 , pp. 169-176
    • Rosenblatt, M.J.1    Kropp, D.H.2
  • 41
    • 42649130382 scopus 로고    scopus 로고
    • Two level simulated annealing based approach to solve facility layout problem
    • Singh, S. P., & Sharma, R. R. K. (2008). Two level simulated annealing based approach to solve facility layout problem. International Journal of Production Research, 46(13), 3563–3582
    • (2008) International Journal of Production Research , vol.46 , Issue.13 , pp. 3563-3582
    • Singh, S.P.1    Sharma, R.R.K.2
  • 42
    • 74549196326 scopus 로고    scopus 로고
    • An improved heuristic approach for multi-objective facility layout problem
    • Singh, S. P., & Singh, V. K. (2010). An improved heuristic approach for multi-objective facility layout problem. The International Journal of Production Research, 48(4), 1171–1194
    • (2010) The International Journal of Production Research , vol.48 , Issue.4 , pp. 1171-1194
    • Singh, S.P.1    Singh, V.K.2
  • 43
    • 77956239911 scopus 로고    scopus 로고
    • A hybrid genetic search based approach to solve single period facility layout problem
    • Singh, S. P., & Sharma, R. R. K. (2010). A hybrid genetic search based approach to solve single period facility layout problem. Asia Pacific Management Review, 15(2), 301–312
    • (2010) Asia Pacific Management Review , vol.15 , Issue.2 , pp. 301-312
    • Singh, S.P.1    Sharma, R.R.K.2
  • 44
    • 0019024645 scopus 로고
    • Flexible facilities design
    • Shore, R. H., & Tompkins, J. A. (1980). Flexible facilities design. AIIE Transactions, 12(2), 200–205
    • (1980) AIIE Transactions , vol.12 , Issue.2 , pp. 200-205
    • Shore, R.H.1    Tompkins, J.A.2
  • 45
    • 84929515623 scopus 로고    scopus 로고
    • Generalized optimal wavelet decomposing algorithm for big financial data
    • Sun, E. W., Chen, Y. T., & Yu, M. T. (2015). Generalized optimal wavelet decomposing algorithm for big financial data. International Journal of Production Economics, 165, 194–214
    • (2015) International Journal of Production Economics , vol.165 , pp. 194-214
    • Sun, E.W.1    Chen, Y.T.2    Yu, M.T.3
  • 46
    • 85005768520 scopus 로고    scopus 로고
    • Chaotic simulated annealing for solving stochastic dynamic facility layout problem
    • Tayal, A., & Singh, S. P. (2014). Chaotic simulated annealing for solving stochastic dynamic facility layout problem. Journal of International Management Studies, 14(2), 67–74
    • (2014) Journal of International Management Studies , vol.14 , Issue.2 , pp. 67-74
    • Tayal, A.1    Singh, S.P.2
  • 47
    • 84976472641 scopus 로고    scopus 로고
    • Integrated SA-DEA-TOPSIS based solution approach for Multi Objective Stochastic Dynamic Facility Layout Problem
    • accepted
    • Tayal, A., & Singh, S. P. (2015). Integrated SA-DEA-TOPSIS based solution approach for Multi Objective Stochastic Dynamic Facility Layout Problem. International Journal of Business and Systems Research (accepted)
    • (2015) International Journal of Business and Systems Research
    • Tayal, A.1    Singh, S.P.2
  • 48
    • 85020606805 scopus 로고    scopus 로고
    • Analysis of Simulated Annealing Cooling Schemas for Design of Optimal Flexible Layout under Uncertain Dynamic Product Demand
    • Tayal, A., & Singh, S. P. (2016a). Analysis of Simulated Annealing Cooling Schemas for Design of Optimal Flexible Layout under Uncertain Dynamic Product Demand. International Journal of Operation Research (accepted)
    • (2016) International Journal of Operation Research (Accepted).
    • Tayal, A.1    Singh, S.P.2
  • 49
    • 85020602651 scopus 로고    scopus 로고
    • Flexible Layout Design For Uncertain Product Demand by Integrating Firefly and Chaotic Simulated Annealing Approach
    • accepted
    • Tayal, A., & Singh, S. P. (2016b). Flexible Layout Design For Uncertain Product Demand by Integrating Firefly and Chaotic Simulated Annealing Approach. Global Journal of Flexible Systems Management (accepted)
    • (2016) Global Journal of Flexible Systems Management
    • Tayal, A.1    Singh, S.P.2
  • 52
    • 0023558530 scopus 로고
    • A multiple criteria model for the facilities layout problem
    • Urban, T. L. (1987). A multiple criteria model for the facilities layout problem. International Journal of Production Research, 25(12), 1805–1812
    • (1987) International Journal of Production Research , vol.25 , Issue.12 , pp. 1805-1812
    • Urban, T.L.1
  • 53
    • 0004262181 scopus 로고
    • Combining qualitative and quantitative analysis in facility layout
    • Urban, T. L. (1989). Combining qualitative and quantitative analysis in facility layout. Production and Inventory Management, 30, 73–77
    • (1989) Production and Inventory Management , vol.30 , pp. 73-77
    • Urban, T.L.1
  • 55
    • 84962360985 scopus 로고    scopus 로고
    • Big data analytics in logistic sand supply chain management: Certain investigations FDOR research and applications
    • Wang, G., Gunasekaran, A., Ngai, E. W. T., & Papadopoulos, T. (2016). Big data analytics in logistic sand supply chain management: Certain investigations FDOR research and applications. International Journal of Production Economics, 176, 98–110
    • (2016) International Journal of Production Economics , vol.176 , pp. 98-110
    • Wang, G.1    Gunasekaran, A.2    Ngai, E.W.T.3    Papadopoulos, T.4
  • 56
    • 0032122942 scopus 로고    scopus 로고
    • Flexible machine layout design for dynamic and uncertain production environments
    • Yang, T., & Peters, B. A. (1998). Flexible machine layout design for dynamic and uncertain production environments. European Journal of Operational Research, 108, 49–64
    • (1998) European Journal of Operational Research , vol.108 , pp. 49-64
    • Yang, T.1    Peters, B.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.