-
3
-
-
5144232431
-
Executing production schedules in the face of uncertainties: A review and some future directions
-
Aytug, H., Lawley, M.A., McKay, K., Mohan, S., Uzoy, R.: Executing production schedules in the face of uncertainties: A review and some future directions. EJOR 161, 86-110 (2005)
-
(2005)
EJOR
, vol.161
, pp. 86-110
-
-
Aytug, H.1
Lawley, M.A.2
Mc Kay, K.3
Mohan, S.4
Uzoy, R.5
-
4
-
-
0033310058
-
Myopic heuristics for the random yield problem
-
Bollapragada, S., Morton, T.E.: Myopic heuristics for the random yield problem. Oper. Res. 47(5), 713-722 (1999)
-
(1999)
Oper. Res.
, vol.47
, Issue.5
, pp. 713-722
-
-
Bollapragada, S.1
Morton, T.E.2
-
5
-
-
0000522889
-
Analysis of periodic and event-driven rescheduling policies in dynamic shops
-
Church, L.K., Uzsoy, R.: Analysis of periodic and event-driven rescheduling policies in dynamic shops. Int. J. Comput. Integr. Manufact. 5, 153-163 (1992)
-
(1992)
Int. J. Comput. Integr. Manufact.
, vol.5
, pp. 153-163
-
-
Church, L.K.1
Uzsoy, R.2
-
6
-
-
0001110481
-
A periodic review production planning model with uncertain capacity and uncertain demand - Optimality of extended myopic policies
-
Ciarallo, F.W., Akella, R., Morton, T.E.: A periodic review production planning model with uncertain capacity and uncertain demand - Optimality of extended myopic policies. Manage. Sci. 40, 320-332 (1994)
-
(1994)
Manage. Sci.
, vol.40
, pp. 320-332
-
-
Ciarallo, F.W.1
Akella, R.2
Morton, T.E.3
-
7
-
-
0034272624
-
Control of a manufacturing system with random product yield and downward substitutability
-
Duenyas, I., Tsai, C.-Y.: Control of a manufacturing system with random product yield and downward substitutability. IIE Trans. 32, 785-795 (2000)
-
(2000)
IIE Trans.
, vol.32
, pp. 785-795
-
-
Duenyas, I.1
Tsai, C.-Y.2
-
8
-
-
0031250898
-
Production quotas as bounds on interplant JIT contracts
-
Duenyas, I., Hopp, W.J., and Bassok, Y.: Production quotas as bounds on interplant JIT contracts. Manage. Sci. 43(10), 1372-1386 (1997)
-
(1997)
Manage. Sci.
, vol.43
, Issue.10
, pp. 1372-1386
-
-
Duenyas, I.1
Hopp, W.J.2
Bassok, Y.3
-
9
-
-
0037063284
-
Inventory models with random yield in a random environment
-
Erdem, A.S., Ozekici, S.: Inventory models with random yield in a random environment. Intl. J. Prod. Econ. 78, 239-253 (2002)
-
(2002)
Intl. J. Prod. Econ.
, vol.78
, pp. 239-253
-
-
Erdem, A.S.1
Ozekici, S.2
-
11
-
-
0032625768
-
Random yield and random demand in a production system with downward substitution
-
Hsu, A., Bassok, Y.: Random yield and random demand in a production system with downward substitution. Oper. Res. 47(2), 277-290 (1999)
-
(1999)
Oper. Res.
, vol.47
, Issue.2
, pp. 277-290
-
-
Hsu, A.1
Bassok, Y.2
-
13
-
-
8744283651
-
Control-oriented approaches to supply chain management in semiconductor manufacturing
-
June 30-July 2, Boston, MA
-
Kempf, K.G.: Control-oriented approaches to supply chain management in semiconductor manufacturing. In: Proceeding of the 2004 American Control Conference, June 30-July 2 (2004) Boston, MA (2004)
-
(2004)
Proceeding of the 2004 American Control Conference
-
-
Kempf, K.G.1
-
14
-
-
0036680992
-
Supply chain capacity and outsourcing decisions: The dynamic interplay of demand and supply uncertainty
-
Kouvelis, P., Milner, J.M.: Supply chain capacity and outsourcing decisions: the dynamic interplay of demand and supply uncertainty. IIE Trans. 34, 717-728 (2002)
-
(2002)
IIE Trans.
, vol.34
, pp. 717-728
-
-
Kouvelis, P.1
Milner, J.M.2
-
15
-
-
33744983498
-
Models for production planning under uncertainty: A review
-
Mula, J., Poler, R., Garcia-Sabater, J.P., Lario, F.C.: Models for production planning under uncertainty: A review. Int. J. Produc. Econ. 103, 271-285 (2006)
-
(2006)
Int. J. Produc. Econ.
, vol.103
, pp. 271-285
-
-
Mula, J.1
Poler, R.2
Garcia-Sabater, J.P.3
Lario, F.C.4
-
19
-
-
0036520603
-
Optimal and hierarchical controls in dynamic stochastic manufacturing systems: A survey
-
Sethi, S.P., Yan, H., Zhang, H., Zhang, Q.: Optimal and hierarchical controls in dynamic stochastic manufacturing systems: A survey. Manufact. Serv. Oper. Manage. 4(2), 133-170 (2002)
-
(2002)
Manufact. Serv. Oper. Manage.
, vol.4
, Issue.2
, pp. 133-170
-
-
Sethi, S.P.1
Yan, H.2
Zhang, H.3
Zhang, Q.4
-
20
-
-
0342794004
-
Exploiting local flexibility during execution of pre-computed schedules
-
Famili, A., Nau, D.S., Tong, S.H., (eds.), MIT Press, Cambridge, MA
-
Smith, S., Keng, N., Kempf, K.: Exploiting local flexibility during execution of pre-computed schedules. In: Famili, A., Nau, D.S., Tong, S.H., (eds.) Artificial Intelligence Applications in Manufacturing, pp. 277-292. MIT Press, Cambridge, MA (1992)
-
(1992)
Artificial Intelligence Applications in Manufacturing
, pp. 277-292
-
-
Smith, S.1
Keng, N.2
Kempf, K.3
-
21
-
-
22544465501
-
-
McGraw-Hill, New York, NY
-
Vollman, T.E., Barry, W.L., Whybark, D.C., Jacobs, F.R.: Manufacturing Planning and Control Systems for Supply Chain Management, 5th ed. McGraw-Hill, New York, NY (2004)
-
(2004)
Manufacturing Planning and Control Systems for Supply Chain Management, 5th ed
-
-
Vollman, T.E.1
Barry, W.L.2
Whybark, D.C.3
Jacobs, F.R.4
-
22
-
-
0000455414
-
Periodic review production models with variable capacity, random yield, and uncertain demand
-
Wang, Y., Gerchak, Y.: Periodic review production models with variable capacity, random yield, and uncertain demand. Manage. Sci. 42(1), 130-137 (1996)
-
(1996)
Manage. Sci.
, vol.42
, Issue.1
, pp. 130-137
-
-
Wang, Y.1
Gerchak, Y.2
-
23
-
-
0001198301
-
Lot sizing with random yields: A review
-
Yano, C.A., Lee, H.L.: Lot sizing with random yields: A review. Oper. Res. 43, 311-334 (1995)
-
(1995)
Oper. Res.
, vol.43
, pp. 311-334
-
-
Yano, C.A.1
Lee, H.L.2
|