메뉴 건너뛰기




Volumn 20, Issue 1, 1973, Pages 46-61

Scheduling Algorithms for Multiprogramming in a Hard-Real-Time Environment

Author keywords

deadline driven scheduling; dynamic scheduling; multiprogram scheduling; priority assignment; processor utilization; real time multiprogramming; scheduling

Indexed keywords


EID: 84974687699     PISSN: 00045411     EISSN: 1557735X     Source Type: Journal    
DOI: 10.1145/321738.321743     Document Type: Article
Times cited : (6573)

References (13)
  • 1
    • 84918850769 scopus 로고
    • Production and stabilization of real-time task schedules
    • July
    • Manacher, G. K. Production and stabilization of real-time task schedules. J. ACM 14, 3 (July 1967), 439-465.
    • (1967) J. ACM , vol.14 , Issue.3 , pp. 439-465
    • Manacher, G.K.1
  • 2
    • 34948820072 scopus 로고
    • June
    • McKinney, J M. A survey of analytical time-sharing models. Computing Surveys 1, 2 (June 1969), 105-116.
    • (1969) Computing Surveys , vol.1 , Issue.2 , pp. 105-116
    • McKinney, J.M.1
  • 3
    • 84945707990 scopus 로고
    • Multiprogram scheduling
    • 6, 7(June, July)
    • CODD, E. F. Multiprogram scheduling. Comm ACM 3, 6, 7 (June, July 1960), 347-350; 413-418.
    • (1960) Comm ACM , vol.3
    • CODD, E.F.1
  • 4
    • 84911053739 scopus 로고
    • Sequencing aspects of multiprogramming
    • July
    • Heller, J. Sequencing aspects of multiprogramming. J. ACM 8, 3 (July 1961), 426-439.
    • (1961) J. ACM , vol.8 , Issue.3 , pp. 426-439
    • Heller, J.1
  • 5
    • 84944813080 scopus 로고
    • Bounds for certain multiprocessing anomalies
    • Nov
    • Graham, R. L. Bounds for certain multiprocessing anomalies. Bell System Tech. J. 45, 9 (Nov. 1966), 1563-1581.
    • (1966) Bell System Tech. J. , vol.45 , Issue.9 , pp. 1563-1581
    • Graham, R.L.1
  • 6
    • 84976849303 scopus 로고
    • Controlling a multiprocessor system
    • Feb
    • Oschner, B. P. Controlling a multiprocessor system. Bell Labs Record 44, 2 (Feb. 1966), 59-62.
    • (1966) Bell Labs Record , vol.44 , Issue.2 , pp. 59-62
    • Oschner, B.P.1
  • 7
    • 0014766132 scopus 로고
    • Preemptive scheduling of real-time tasks on multiprocessor systems
    • Apr
    • Muntz, R. R., and Coffman, E. G., Jr. Preemptive scheduling of real-time tasks on multiprocessor systems. J. ACM 17, 2 (Apr 1970), 324-338.
    • (1970) J. ACM , vol.17 , Issue.2 , pp. 324-338
    • Muntz, R.R.1    Coffman, E.G.2
  • 8
    • 0015007993 scopus 로고
    • A policy-driven scheduler for a time-sharing system
    • Feb
    • Bernstein, A. J., and Sharp, J. C. A policy-driven scheduler for a time-sharing system. Comm. ACM 14, 2 (Feb. 1971), 74-78.
    • (1971) Comm. ACM , vol.14 , Issue.2 , pp. 74-78
    • Bernstein, A.J.1    Sharp, J.C.2
  • 9
    • 84914826148 scopus 로고
    • A scheduling philosophy for multiprocessing systems
    • May
    • Lampson, B. W. A scheduling philosophy for multiprocessing systems. Comm. ACM 11, 5 (May, 1968), 347-360.
    • (1968) Comm. ACM , vol.11 , Issue.5 , pp. 347-360
    • Lampson, B.W.1
  • 11
    • 84933449145 scopus 로고
    • Software design techniques for automatic checkout
    • Nov
    • JIRAUCH, D. H. Software design techniques for automatic checkout. IEEE Trans. AES-3, 6 (Nov. 1967), 934-940).
    • (1967) IEEE Trans. AES , vol.3 , Issue.6 , pp. 934-940
    • JIRAUCH, D.H.1
  • 13
    • 0002670970 scopus 로고
    • Scheduling algorithms for hard-real-time multiprogramming of a single processor
    • Jet Propulsion Lab., Calif. Inst. of Tech., Pasadena, Calif., Nov
    • Liu, C. L. Scheduling algorithms for hard-real-time multiprogramming of a single processor. JPL Space Programs Summary 37-60, Vol. II, Jet Propulsion Lab., Calif. Inst. of Tech., Pasadena, Calif., Nov. 1969.
    • (1969) JPL Space Programs Summary 37-60 , vol.2
    • Liu, C.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.