Volumn 86, Issue , 2016, Pages 22-31

Identifying operational requirements for flexible CCS power plant in future energy systems

Author keywords

ancillary services; balancing; CO2 capture; operating reserves; Operational flexibility; power markets; power system

Indexed keywords

BALANCING; CARBON CAPTURE; CARBON DIOXIDE; COMMERCE; ELECTRIC POWER TRANSMISSION NETWORKS; RENEWABLE ENERGY RESOURCES; THERMOELECTRIC POWER PLANTS;

EID: 84971265061     PISSN: 18766102     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1016/j.egypro.2016.01.003     Document Type: Conference Paper
Times cited : (34)

References (27)
  • 1
    • 84859379762 scopus 로고    scopus 로고
    • European Commission Brussels
    • European Commission, "Energy roadmap 2050," Brussels, 2012.
    • (2012) Energy Roadmap 2050
  • 6
    • 84971214978 scopus 로고    scopus 로고
    • Twenties Task 16.3 "grid restriction study: Nordic Hydropower and Northern European Wind Power"," European Commision. Seventh framework Programme
    • H. Farahmand, S. Jaehnert, T. Aigner, and D. Huertas-Hernando Twenties Task 16.3 "Grid restriction study: Nordic Hydropower and Northern European Wind Power"," European Commision. Seventh framework Programme Trondheim Norway 2013
    • (2013) Trondheim Norway
    • Farahmand, H.1    Jaehnert, S.2    Aigner, T.3    Huertas-Hernando, D.4
  • 9
    • 84901484196 scopus 로고    scopus 로고
    • Integration of wind and solar power in Europe: Assesment of flexibility requirements
    • M. Huber, D. Dimkova, and T. Hamacher Integration of wind and solar power in Europe: Assesment of flexibility requirements Energy 69 2014 236 246
    • (2014) Energy , vol.69 , pp. 236-246
    • Huber, M.1    Dimkova, D.2    Hamacher, T.3
  • 10
    • 84898734651 scopus 로고    scopus 로고
    • Flexible Operation of CCS Power Plants to Match Variable Renewable Energies
    • M. Nimtz, and K. Hans-Joachim Flexible Operation of CCS Power Plants to Match Variable Renewable Energies Energy Procedia 2013 294 303
    • (2013) Energy Procedia , pp. 294-303
    • Nimtz, M.1    Hans-Joachim, K.2
  • 12
    • 84898727606 scopus 로고    scopus 로고
    • The Flexibility Requirements for Power Plants with CCS in a Future Energy System with a Large Share of Intermittent Renewable Energy Sources
    • A.S. Brouwer, M. van den Broek, A. Seebregts, and A.P.C. Faaij The Flexibility Requirements for Power Plants with CCS in a Future Energy System with a Large Share of Intermittent Renewable Energy Sources Energy Procedia 2013 2657 2664
    • (2013) Energy Procedia , pp. 2657-2664
    • Brouwer, A.S.1    Van Den Broek, M.2    Seebregts, A.3    Faaij, A.P.C.4
  • 13
    • 84971266905 scopus 로고    scopus 로고
    • SINTEF Offshore Electricity Grid Infraestructure in Europe. A Techno-Economic Assessment
    • October
    • 3E, E.W.E.A. dena, I.E.O. ForWind, N.T.U.A. Senergy, and SINTEF Offshore Electricity Grid Infraestructure in Europe. A Techno-Economic Assessment OffShore Grid October 2011
    • (2011) OffShore Grid
    • Dena, E.W.E.A.1    ForWind, I.E.O.2    Senergy, N.T.U.A.3
  • 14
    • 84922937811 scopus 로고    scopus 로고
    • Assessing Operating Regimes of CCS Power Plants in High Wind and Energy Storage Scenarios
    • A.R. Bruce, G.P. Harrison, J. Gibbins, and H. Chalmers Assessing Operating Regimes of CCS Power Plants in High Wind and Energy Storage Scenarios Energy Procedia 2014 7529 7540
    • (2014) Energy Procedia , pp. 7529-7540
    • Bruce, A.R.1    Harrison, G.P.2    Gibbins, J.3    Chalmers, H.4
  • 17
    • 82855169622 scopus 로고    scopus 로고
    • National Grid Electricity Transmission Plc January
    • National Grid Electricity Transmission Plc, "The grid code. Issue 5 Revision 13," January 2015.
    • (2015) The Grid Code. Issue 5 Revision 13
  • 19
    • 33947323248 scopus 로고    scopus 로고
    • A Survey of Frequency and Voltage Control Ancillary services - Part I: Technical Features
    • February
    • Y.G. Rebours, D.S. Kirschen, and M. Trotignon A Survey of Frequency and Voltage Control Ancillary services - Part I: Technical Features IEEE Transactions on power systems 22 1 February 2007 350 357
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.1 , pp. 350-357
    • Rebours, Y.G.1    Kirschen, D.S.2    Trotignon, M.3
  • 25
    • 84860839829 scopus 로고    scopus 로고
    • On the operation strategy of steam power plants working at variable load: Technical and economic issues.,"
    • A. Stoppato, A. Mirandola, G. Meneghuetti, and E.L. Casto On the operation strategy of steam power plants working at variable load: Technical and economic issues.," Energy 37 2011 228 236
    • (2011) Energy , vol.37 , pp. 228-236
    • Stoppato, A.1    Mirandola, A.2    Meneghuetti, G.3    Casto, E.L.4
  • 26
    • 84878960887 scopus 로고    scopus 로고
    • Estimating power plant start costs in cyclic operation
    • P. Keatley, A. Shibli, and N. Hewitt Estimating power plant start costs in cyclic operation Applied Energy 111 2013 550 557
    • (2013) Applied Energy , vol.111 , pp. 550-557
    • Keatley, P.1    Shibli, A.2    Hewitt, N.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.