-
1
-
-
84859379762
-
-
European Commission Brussels
-
European Commission, "Energy roadmap 2050," Brussels, 2012.
-
(2012)
Energy Roadmap 2050
-
-
-
6
-
-
84971214978
-
Twenties Task 16.3 "grid restriction study: Nordic Hydropower and Northern European Wind Power"," European Commision. Seventh framework Programme
-
H. Farahmand, S. Jaehnert, T. Aigner, and D. Huertas-Hernando Twenties Task 16.3 "Grid restriction study: Nordic Hydropower and Northern European Wind Power"," European Commision. Seventh framework Programme Trondheim Norway 2013
-
(2013)
Trondheim Norway
-
-
Farahmand, H.1
Jaehnert, S.2
Aigner, T.3
Huertas-Hernando, D.4
-
9
-
-
84901484196
-
Integration of wind and solar power in Europe: Assesment of flexibility requirements
-
M. Huber, D. Dimkova, and T. Hamacher Integration of wind and solar power in Europe: Assesment of flexibility requirements Energy 69 2014 236 246
-
(2014)
Energy
, vol.69
, pp. 236-246
-
-
Huber, M.1
Dimkova, D.2
Hamacher, T.3
-
10
-
-
84898734651
-
Flexible Operation of CCS Power Plants to Match Variable Renewable Energies
-
M. Nimtz, and K. Hans-Joachim Flexible Operation of CCS Power Plants to Match Variable Renewable Energies Energy Procedia 2013 294 303
-
(2013)
Energy Procedia
, pp. 294-303
-
-
Nimtz, M.1
Hans-Joachim, K.2
-
11
-
-
84898744464
-
The role of CCS with high levels of renewables penetration
-
S. McCoy, J. Bertsch, C. Growitsch, S. Lorenczik, S. Nagl, D. Volk, M. Finkenrath, and J. Davison The role of CCS with high levels of renewables penetration Energy Procedia 37 GHGT-11 2013 2665 2675
-
(2013)
Energy Procedia
, vol.37
, Issue.11 GHGT
, pp. 2665-2675
-
-
McCoy, S.1
Bertsch, J.2
Growitsch, C.3
Lorenczik, S.4
Nagl, S.5
Volk, D.6
Finkenrath, M.7
Davison, J.8
-
12
-
-
84898727606
-
The Flexibility Requirements for Power Plants with CCS in a Future Energy System with a Large Share of Intermittent Renewable Energy Sources
-
A.S. Brouwer, M. van den Broek, A. Seebregts, and A.P.C. Faaij The Flexibility Requirements for Power Plants with CCS in a Future Energy System with a Large Share of Intermittent Renewable Energy Sources Energy Procedia 2013 2657 2664
-
(2013)
Energy Procedia
, pp. 2657-2664
-
-
Brouwer, A.S.1
Van Den Broek, M.2
Seebregts, A.3
Faaij, A.P.C.4
-
13
-
-
84971266905
-
SINTEF Offshore Electricity Grid Infraestructure in Europe. A Techno-Economic Assessment
-
October
-
3E, E.W.E.A. dena, I.E.O. ForWind, N.T.U.A. Senergy, and SINTEF Offshore Electricity Grid Infraestructure in Europe. A Techno-Economic Assessment OffShore Grid October 2011
-
(2011)
OffShore Grid
-
-
Dena, E.W.E.A.1
ForWind, I.E.O.2
Senergy, N.T.U.A.3
-
14
-
-
84922937811
-
Assessing Operating Regimes of CCS Power Plants in High Wind and Energy Storage Scenarios
-
A.R. Bruce, G.P. Harrison, J. Gibbins, and H. Chalmers Assessing Operating Regimes of CCS Power Plants in High Wind and Energy Storage Scenarios Energy Procedia 2014 7529 7540
-
(2014)
Energy Procedia
, pp. 7529-7540
-
-
Bruce, A.R.1
Harrison, G.P.2
Gibbins, J.3
Chalmers, H.4
-
17
-
-
82855169622
-
-
National Grid Electricity Transmission Plc January
-
National Grid Electricity Transmission Plc, "The grid code. Issue 5 Revision 13," January 2015.
-
(2015)
The Grid Code. Issue 5 Revision 13
-
-
-
19
-
-
33947323248
-
A Survey of Frequency and Voltage Control Ancillary services - Part I: Technical Features
-
February
-
Y.G. Rebours, D.S. Kirschen, and M. Trotignon A Survey of Frequency and Voltage Control Ancillary services - Part I: Technical Features IEEE Transactions on power systems 22 1 February 2007 350 357
-
(2007)
IEEE Transactions on Power Systems
, vol.22
, Issue.1
, pp. 350-357
-
-
Rebours, Y.G.1
Kirschen, D.S.2
Trotignon, M.3
-
24
-
-
84870504225
-
Design-point and part load considerations for natural gas combined cycle plants with post combustion capture
-
K. Jordal, P. Ystad, R. Anantharaman, A. Chikukwa, and O. Bolland Design-point and part load considerations for natural gas combined cycle plants with post combustion capture International Journas of Greenhouse Gas Control 11 2012 271 282
-
(2012)
International Journas of Greenhouse Gas Control
, vol.11
, pp. 271-282
-
-
Jordal, K.1
Ystad, P.2
Anantharaman, R.3
Chikukwa, A.4
Bolland, O.5
-
25
-
-
84860839829
-
On the operation strategy of steam power plants working at variable load: Technical and economic issues.,"
-
A. Stoppato, A. Mirandola, G. Meneghuetti, and E.L. Casto On the operation strategy of steam power plants working at variable load: Technical and economic issues.," Energy 37 2011 228 236
-
(2011)
Energy
, vol.37
, pp. 228-236
-
-
Stoppato, A.1
Mirandola, A.2
Meneghuetti, G.3
Casto, E.L.4
-
26
-
-
84878960887
-
Estimating power plant start costs in cyclic operation
-
P. Keatley, A. Shibli, and N. Hewitt Estimating power plant start costs in cyclic operation Applied Energy 111 2013 550 557
-
(2013)
Applied Energy
, vol.111
, pp. 550-557
-
-
Keatley, P.1
Shibli, A.2
Hewitt, N.3
-
27
-
-
84891484893
-
2 capture plants - A review.,"
-
2 capture plants - A review.," Computers and Chemical Engineering 61 2014 245 265
-
(2014)
Computers and Chemical Engineering
, vol.61
, pp. 245-265
-
-
Bui, M.1
Gunawan, I.2
Verheyen, V.3
Feron, P.4
Meuleman, E.5
Adeloju, S.6
|