메뉴 건너뛰기




Volumn 3, Issue , 2002, Pages 1782-1786

Supply reliability evaluation method for deregulated electric power market considering customers uncertainty

Author keywords

Demand Uncertainty; Expected Unserved Power (EUP); Supply reliability; Transmission congestion

Indexed keywords

DEREGULATION; ELECTRIC POWER TRANSMISSION; POWER MARKETS; RELIABILITY; SALES; TRANSMISSIONS;

EID: 84969903600     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICPST.2002.1067839     Document Type: Conference Paper
Times cited : (4)

References (9)
  • 1
    • 0032001723 scopus 로고    scopus 로고
    • Applicatin of Perturbation. Analysis to Sensitivity Computations of Generating Units and System Reliability
    • H. Salehfar, S. Trihadi: "Applicatin of Perturbation. Analysis to Sensitivity Computations of Generating Units and System Reliability", IEEE Transactions on Power System, Vol. 13, No. 1, pp152-158 (1997)
    • (1997) IEEE Transactions on Power System , vol.13 , Issue.1 , pp. 152-158
    • Salehfar, H.1    Trihadi, S.2
  • 2
    • 0031077821 scopus 로고    scopus 로고
    • Composite System Reliability Evaluation using State Space Pruning
    • C. Singh, J. Mitra: "Composite System Reliability Evaluation using State Space Pruning", IEEE Transactions on Power System, Vol. 12, No. 1, pp471-479 (1997)
    • (1997) IEEE Transactions on Power System , vol.12 , Issue.1 , pp. 471-479
    • Singh, C.1    Mitra, J.2
  • 3
    • 0032640595 scopus 로고    scopus 로고
    • Composite system reliability evaluation based on Monte-Carlo simulation combined with outages screening
    • Guo Yongji, Xi Yongjian, Xiao Kai, Yang Huiyi: "Composite system reliability evaluation based on Monte-Carlo simulation combined with outages screening", IEEE Transactions on Power Systems, Vol. 14, No. 4, pp785-790 (1999)
    • (1999) IEEE Transactions on Power Systems , vol.14 , Issue.4 , pp. 785-790
    • Guo, Y.1    Xi, Y.2    Xiao, K.3    Yang, H.4
  • 4
    • 0035341046 scopus 로고    scopus 로고
    • Composite reliability evaluation by sequential Monte Carlo simulation on parallel and distributed processing environments
    • C. L .T. Borges, D. M. Falcao, J. C .O. Mello, A. C. G. Melo: "Composite reliability evaluation by sequential Monte Carlo simulation on parallel and distributed processing environments", IEEE Transactions on Power Systems, Vol. 16, No. 2, pp203-209 (2001)
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.2 , pp. 203-209
    • Borges, C.L.T.1    Falcao, D.M.2    Mello, J.C.O.3    Melo, A.C.G.4
  • 5
    • 0032022780 scopus 로고    scopus 로고
    • Power system reliability assessment suitable for a deregulated system via the method of cumulants
    • L. A. Sanabria, T. S. Dillon: "Power system reliability assessment suitable for a deregulated system via the method of cumulants", Electrical Power and Energy Systems, Vol. 20, No. 3, pp203-211 (1998)
    • (1998) Electrical Power and Energy Systems , vol.20 , Issue.3 , pp. 203-211
    • Sanabria, L.A.1    Dillon, T.S.2
  • 6
    • 0031079076 scopus 로고    scopus 로고
    • Contributions of Individual Generators to Loads and Flows
    • D. Kirschen, R. Allan, G. Strbac: "Contributions of Individual Generators to Loads and Flows", IEEE Transactions on Power Systems, Vol. 12, No. 1, pp52-60 (1997)
    • (1997) IEEE Transactions on Power Systems , vol.12 , Issue.1 , pp. 52-60
    • Kirschen, D.1    Allan, R.2    Strbac, G.3
  • 8
    • 33747187684 scopus 로고    scopus 로고
    • Quality of Supply-Customers Requirement
    • CIGRE WG-37: "Quality of Supply-Customers Requirement", CIGRE 37-116 Report (1999)
    • (1999) CIGRE 37-116 Report
    • CIGRE WG-371


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.