메뉴 건너뛰기




Volumn 41, Issue , 2016, Pages 105-110

The Relevance of Manufacturing Flexibility in the Context of Industrie 4.0

Author keywords

Flexibility; Manufacturing; Mass customization

Indexed keywords

COMPENSATION (PERSONNEL); ENGINEERING RESEARCH; INDUSTRIAL RESEARCH; MANUFACTURE; PRODUCT DESIGN; QUALITY CONTROL; WAGES;

EID: 84968830399     PISSN: 22128271     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1016/j.procir.2015.12.047     Document Type: Conference Paper
Times cited : (81)

References (54)
  • 1
    • 0027580682 scopus 로고
    • Manufacturing Flexibility: A Strategic Perspective
    • D. Gerwin, "Manufacturing Flexibility: A Strategic Perspective.;" Manage. Sci.; vol. 39, no. 4, 1993.
    • (1993) Manage. Sci. , vol.39 , Issue.4
    • Gerwin, D.1
  • 3
    • 0023327068 scopus 로고
    • Newell, "mANUFACTURING STRATEGY, ENVIRONMENTAL UNCERTAINTY and PERFORMANCE: A PATH ANALYTIC MODEL
    • W. T. Swamidass, Paul M. Newell, "MANUFACTURING STRATEGY, ENVIRONMENTAL UNCERTAINTY AND PERFORMANCE: A PATH ANALYTIC MODEL.;" Manage. Sci.; vol. 33, no. 4, 1987.
    • (1987) Manage. Sci. , vol.33 , Issue.4
    • Swamidass, W.T.1    Paul, M.2
  • 4
    • 0001037391 scopus 로고
    • Lasting improvements in manufacturing performance: In search of a new theory
    • Apr
    • K. Ferdows and A. De Meyer, "Lasting improvements in manufacturing performance: In search of a new theory," J. Oper. Manag.; vol. 9, no. 2, pp. 168-184, Apr. 1990.
    • (1990) J. Oper. Manag. , vol.9 , Issue.2 , pp. 168-184
    • Ferdows, K.1    De Meyer, A.2
  • 5
    • 0027624322 scopus 로고
    • Manufacturing flexibility and profitability
    • Jul
    • J. Olhager, "Manufacturing flexibility and profitability," Int. J. Prod. Econ.; vol. 30-31, pp. 67-78, Jul. 1993.
    • (1993) Int. J. Prod. Econ. , vol.30-31 , pp. 67-78
    • Olhager, J.1
  • 6
    • 84904472063 scopus 로고    scopus 로고
    • "effectuation in manufacturing: How entrepreneurial decision-making techniques can be used to deal with uncertainty in manufacturing
    • M. Brettel, D. Bendig, M. Keller, N. Friederichsen, and M. Rosenberg, "Effectuation in manufacturing: how entrepreneurial decision-making techniques can be used to deal with uncertainty in manufacturing," in 47th CIRP Conference on Manufacturing Systems, 2014, vol. 00.
    • (2014) 47th CIRP Conference on Manufacturing Systems
    • Brettel, M.1    Bendig, D.2    Keller, M.3    Friederichsen, N.4    Rosenberg, M.5
  • 7
    • 84989084937 scopus 로고
    • Flexibility: The next competitive battle the manufacturing futures survey
    • Mar
    • A. De Meyer, J. Nakane, J.G. Miller, and K. Ferdows, "Flexibility: The next competitive battle the manufacturing futures survey," Strateg. Manag. J.; vol. 10, no. 2, pp. 135-144, Mar. 1989.
    • (1989) Strateg. Manag. J. , vol.10 , Issue.2 , pp. 135-144
    • De Meyer, A.1    Nakane, J.2    Miller, J.G.3    Ferdows, K.4
  • 8
    • 0032298250 scopus 로고    scopus 로고
    • On theory in operations management
    • Dec.
    • R. W. Schmenner and M. L. Swink, "On theory in operations management," J. Oper. Manag.; vol. 17, no. 1, pp. 97-113, Dec. 1998.
    • (1998) J. Oper. Manag. , vol.17 , Issue.1 , pp. 97-113
    • Schmenner, R.W.1    Swink, M.L.2
  • 11
    • 84896353604 scopus 로고    scopus 로고
    • On the relationship between business environment and competitive priorities: The role of performance frontiers
    • May
    • S. Cai and Z. Yang, "On the relationship between business environment and competitive priorities: The role of performance frontiers," Int. J. Prod. Econ.; vol. 151, pp. 131-145, May 2014.
    • (2014) Int. J. Prod. Econ. , vol.151 , pp. 131-145
    • Cai, S.1    Yang, Z.2
  • 12
    • 0034174106 scopus 로고    scopus 로고
    • The theory of performance frontiers
    • Apr.
    • G. Vastag, "The theory of performance frontiers," J. Oper. Manag.; vol. 18, no. 3, pp. 353-360, Apr. 2000.
    • (2000) J. Oper. Manag. , vol.18 , Issue.3 , pp. 353-360
    • Vastag, G.1
  • 13
    • 84968718110 scopus 로고
    • The Management of Innovation, Tavistock, London, 1961
    • T. Burns and G. M. Stalker, "The Management of Innovation, Tavistock, London, 1961," Burn. Manag. Innov.; 1981.
    • (1981) Burn. Manag. Innov.
    • Burns, T.1    Stalker, G.M.2
  • 14
    • 79955485951 scopus 로고    scopus 로고
    • A hybrid model of competitive capabilities
    • Apr.
    • M. Hallgren, J. Olhager, and R. G. Schroeder, "A hybrid model of competitive capabilities," Int. J. Oper. Prod. Manag.; vol. 31, no. 5, pp. 511-526, Apr. 2011.
    • (2011) Int. J. Oper. Prod. Manag. , vol.31 , Issue.5 , pp. 511-526
    • Hallgren, M.1    Olhager, J.2    Schroeder, R.G.3
  • 15
    • 0032633357 scopus 로고    scopus 로고
    • Agile manufacturing: The drivers, concepts and attributes
    • May
    • Y. Yusuf, M. Sarhadi, and A. Gunasekaran, "Agile manufacturing: The drivers, concepts and attributes," Int. J. Prod. Econ.; vol. 62, no. 1-2, pp. 33-43, May 1999.
    • (1999) Int. J. Prod. Econ. , vol.62 , Issue.1-2 , pp. 33-43
    • Yusuf, Y.1    Sarhadi, M.2    Gunasekaran, A.3
  • 16
    • 0002986901 scopus 로고
    • Manufacturing-missing link in corporate strategy
    • 10p. 1 Black and White Photograph
    • W. Skinner, "Manufacturing-missing link in corporate strategy.;" Harvard Bus. Rev.; vol. 47, no. 3, pp. 136-145. 10p. 1 Black and White Photograph, 1969.
    • (1969) Harvard Bus. Rev. , vol.47 , Issue.3 , pp. 136-145
    • Skinner, W.1
  • 17
    • 84882450168 scopus 로고    scopus 로고
    • Performance improvements seen through the lens of strategic trade-offs
    • Aug.
    • R. Sarmiento, V. Shukla, and J. M. Izar-Landeta, "Performance improvements seen through the lens of strategic trade-offs," Int. J. Prod. Res.; vol. 51, no. 15, pp. 4682-4694, Aug. 2013.
    • (2013) Int. J. Prod. Res. , vol.51 , Issue.15 , pp. 4682-4694
    • Sarmiento, R.1    Shukla, V.2    Izar-Landeta, J.M.3
  • 18
    • 84864770245 scopus 로고    scopus 로고
    • The fit between capabilities and priorities and its impact on performance improvement: Revisiting and extending the theory of production competence
    • Jul
    • T. Schoenherr and R. Narasimhan, "The fit between capabilities and priorities and its impact on performance improvement: revisiting and extending the theory of production competence," Int. J. Prod. Res.; vol. 50, no. 14, pp. 3755-3775, Jul. 2012.
    • (2012) Int. J. Prod. Res. , vol.50 , Issue.14 , pp. 3755-3775
    • Schoenherr, T.1    Narasimhan, R.2
  • 19
    • 4243144874 scopus 로고    scopus 로고
    • An exploratory study of the nature of cumulative capabilities
    • Oct.
    • B. Flynn and J. Flynn, "An exploratory study of the nature of cumulative capabilities," J. Oper. Manag.; vol. 22, no. 5, pp. 439-457, Oct. 2004.
    • (2004) J. Oper. Manag. , vol.22 , Issue.5 , pp. 439-457
    • Flynn, B.1    Flynn, J.2
  • 20
    • 84927949917 scopus 로고    scopus 로고
    • Economic Implications of 3D printing: Market structure Models in light of additive manufacturing Revisited
    • Mar
    • C. Weller, R. Kleer, and F. T. Piller, "Economic Implications of 3D printing: Market structure Models in light of additive manufacturing Revisited," Int. J. Prod. Econ.; vol. 164, pp. 43-56, Mar. 2015.
    • (2015) Int. J. Prod. Econ. , vol.164 , pp. 43-56
    • Weller, C.1    Kleer, R.2    Piller, F.T.3
  • 21
    • 84868368547 scopus 로고    scopus 로고
    • 1st ed. Berlin, Heidelberg: Springer
    • C. Brecher, S. Jeschke, G. Schuh, S. Aghassi, J. Arnoscht, F. Bauhoff, S. Fuchs, C. Jooß, O. Karmann, S. Kozielski, S. Orilski, A. Richert, A. Roderburg, M. Schiffer, J. Schubert, S. Stiller, and S. Tönissen, Integrative Produktionstechnik für Hochlohnländer, 1st ed. Berlin, Heidelberg: Springer, 2011.
    • (2011) Integrative Produktionstechnik für Hochlohnländer
    • Brecher, C.1
  • 22
    • 84883254110 scopus 로고    scopus 로고
    • Product variety management
    • Jan.
    • H. ElMaraghy, G. Schuh, W. ElMaraghy, F. Piller, P. Schönsleben, M. Tseng, and A. Bernard, "Product variety management," CIRP Ann.-Manuf. Technol.; vol. 62, no. 2, pp. 629-652, Jan. 2013.
    • (2013) CIRP Ann.-Manuf. Technol. , vol.62 , Issue.2 , pp. 629-652
    • ElMaraghy, H.1
  • 23
    • 84859908356 scopus 로고    scopus 로고
    • The mass customization decade: An updated review of the literature
    • Jul.
    • F. S. Fogliatto, G.J. C. da Silveira, and D. Borenstein, "The mass customization decade: An updated review of the literature," Int. J. Prod. Econ.; vol. 138, no. 1, pp. 14-25, Jul. 2012.
    • (2012) Int. J. Prod. Econ. , vol.138 , Issue.1 , pp. 14-25
    • Fogliatto, F.S.1    Da Silveira, G.J.C.2    Borenstein, D.3
  • 24
    • 0033737562 scopus 로고    scopus 로고
    • A review of empirical research on manufacturing flexibility
    • Jun.
    • R. J. Vokurka and S. W. O'Leary-Kelly, "A review of empirical research on manufacturing flexibility," J. Oper. Manag.; vol. 18, no. 4, pp. 485-501, Jun. 2000.
    • (2000) J. Oper. Manag. , vol.18 , Issue.4 , pp. 485-501
    • Vokurka, R.J.1    O'Leary-Kelly, S.W.2
  • 26
    • 34248539177 scopus 로고
    • Flexibility in manufacturing: A survey
    • Jul.
    • A. Sethi and S. Sethi, "Flexibility in manufacturing: A survey," Int. J. Flex. Manuf. Syst.; vol. 2, no. 4, Jul. 1990.
    • (1990) Int. J. Flex. Manuf. Syst. , vol.2 , Issue.4
    • Sethi, A.1    Sethi, S.2
  • 30
    • 0002299755 scopus 로고
    • The measurement of manufacturing flexibility
    • Jul
    • Y. P. Gupta and T. M. Somers, "The measurement of manufacturing flexibility," Eur. J. Oper. Res.; vol. 60, no. 2, pp. 166-182, Jul. 1992.
    • (1992) Eur. J. Oper. Res. , vol.60 , Issue.2 , pp. 166-182
    • Gupta, Y.P.1    Somers, T.M.2
  • 31
    • 0033101952 scopus 로고    scopus 로고
    • A multiple-method study of environmental uncertainty and manufacturing flexibility
    • Mar.
    • M. Pagell and D. R. Krause, "A multiple-method study of environmental uncertainty and manufacturing flexibility," J. Oper. Manag.; vol. 17, no. 3, pp. 307-325, Mar. 1999.
    • (1999) J. Oper. Manag. , vol.17 , Issue.3 , pp. 307-325
    • Pagell, M.1    Krause, D.R.2
  • 32
    • 33947357136 scopus 로고    scopus 로고
    • Matching plant flexibility and supplier flexibility: Lessons from small suppliers of U.S. Manufacturing plants in India
    • Apr.
    • B. Avittathur and P. Swamidass, "Matching plant flexibility and supplier flexibility: Lessons from small suppliers of U.S. manufacturing plants in India," J. Oper. Manag.; vol. 25, no. 3, pp. 717-735, Apr. 2007.
    • (2007) J. Oper. Manag. , vol.25 , Issue.3 , pp. 717-735
    • Avittathur, B.1    Swamidass, P.2
  • 33
    • 19844375734 scopus 로고    scopus 로고
    • A Structural Approach to Measuring Uncertainty in Supply Chains
    • 24p. 5 Diagrams
    • 2Yen-Ping ChiYi-Ming Tai, Chin-Fu Ho1, "A Structural Approach to Measuring Uncertainty in Supply Chains.;" Int. J. Electron. Commer.; vol. 9, no. 3, pp. 91-114. 24p. 5 Diagrams, 2005.
    • (2005) Int. J. Electron. Commer. , vol.9 , Issue.3 , pp. 91-114
    • Chi, Y.1    Tai, Y.2    Ho, C.3
  • 34
    • 1642477963 scopus 로고    scopus 로고
    • Re-exploring the relationship between flexibility and the external environment
    • Jan.
    • M. Pagell and D. R. Krause, "Re-exploring the relationship between flexibility and the external environment," J. Oper. Manag.; vol. 21, no. 6, pp. 629-649, Jan. 2004.
    • (2004) J. Oper. Manag. , vol.21 , Issue.6 , pp. 629-649
    • Pagell, M.1    Krause, D.R.2
  • 35
    • 78651274738 scopus 로고    scopus 로고
    • Supply chain flexibility, uncertainty and firm performance: An empirical analysis of German manufacturing firms
    • Mar.
    • U. Merschmann and U. W. Thonemann, "Supply chain flexibility, uncertainty and firm performance: An empirical analysis of German manufacturing firms," Int. J. Prod. Econ.; vol. 130, no. 1, pp. 43-53, Mar. 2011.
    • (2011) Int. J. Prod. Econ. , vol.130 , Issue.1 , pp. 43-53
    • Merschmann, U.1    Thonemann, U.W.2
  • 36
    • 79957449326 scopus 로고    scopus 로고
    • The contingency effects of environmental uncertainty on the relationship between supply chain integration and operational performance
    • Sep.
    • C. Y. Wong, S. Boon-itt, and C. W. Y. Wong, "The contingency effects of environmental uncertainty on the relationship between supply chain integration and operational performance," J. Oper. Manag.; vol. 29, no. 6, pp. 604-615, Sep. 2011.
    • (2011) J. Oper. Manag. , vol.29 , Issue.6 , pp. 604-615
    • Wong, C.Y.1    Boon-Itt, S.2    Wong, C.W.Y.3
  • 37
    • 84989095992 scopus 로고
    • Output flexibility - A competitive advantage for small firms
    • A. Fiegenbaum and A. Karnani, "Output flexibility- A competitive advantage for small firms," Strateg. Manag. J.; vol. 12, no. 2, pp. 101-114, 1991.
    • (1991) Strateg. Manag. J. , vol.12 , Issue.2 , pp. 101-114
    • Fiegenbaum, A.1    Karnani, A.2
  • 38
    • 84855334734 scopus 로고    scopus 로고
    • Corporate effectuation: Entrepreneurial action and its impact on R&D project performance
    • Mar.
    • M. Brettel, R. Mauer, A. Engelen, and D. Küpper, "Corporate effectuation: Entrepreneurial action and its impact on R&D project performance," J. Bus. Ventur.; vol. 27, no. 2, pp. 167-184, Mar. 2012.
    • (2012) J. Bus. Ventur. , vol.27 , Issue.2 , pp. 167-184
    • Brettel, M.1
  • 39
    • 0031197670 scopus 로고    scopus 로고
    • Process range in manufacturing: An empirical study of flexibility
    • 14p. 1 Diagram
    • D. M. Upton, "Process range in manufacturing: An empirical study of flexibility.;" Manage. Sci.; vol. 43, no. 8, p. 1079. 14p. 1 Diagram, 1997.
    • (1997) Manage. Sci. , vol.43 , Issue.8 , pp. 1079
    • Upton, D.M.1
  • 40
    • 41549156354 scopus 로고    scopus 로고
    • Economic and strategic perspectives on investing in RMS and FMS
    • Mar.
    • O. Kuzgunkaya and H. A. ElMaraghy, "Economic and strategic perspectives on investing in RMS and FMS," Int. J. Flex. Manuf. Syst.; vol. 19, no. 3, pp. 217-246, Mar. 2007.
    • (2007) Int. J. Flex. Manuf. Syst. , vol.19 , Issue.3 , pp. 217-246
    • Kuzgunkaya, O.1    ElMaraghy, H.A.2
  • 41
    • 0031272250 scopus 로고    scopus 로고
    • Dimensions of manufacturing strength in the furniture industry
    • S. K. Vickery, C. Dröge, and R. E. Markland, "Dimensions of manufacturing strength in the furniture industry," J. Oper. Manag.; vol. 15, no. 4, pp. 317-330, 1997.
    • (1997) J. Oper. Manag. , vol.15 , Issue.4 , pp. 317-330
    • Vickery, S.K.1
  • 42
    • 21844453645 scopus 로고    scopus 로고
    • Supply chain flexibility and firm performance
    • Jul.
    • A. Sánchez and M. Pérez, "Supply chain flexibility and firm performance," Int. J. Oper. Prod. Manag.; vol. 25, no. 7, pp. 681-700, Jul. 2005.
    • (2005) Int. J. Oper. Prod. Manag. , vol.25 , Issue.7 , pp. 681-700
    • Sánchez, A.1    Pérez, M.2
  • 43
    • 84989095331 scopus 로고
    • Relating strategy and structure to flexible automation: A test of fit and performance implications
    • R. Parthasarthy and S. P. Sethi, "Relating strategy and structure to flexible automation: a test of fit and performance implications," Strateg. Manag. J.; vol. 14, no. 7, pp. 529-549, 1993.
    • (1993) Strateg. Manag. J. , vol.14 , Issue.7 , pp. 529-549
    • Parthasarthy, R.1    Sethi, S.P.2
  • 44
    • 0037464629 scopus 로고    scopus 로고
    • Manufacturing flexibility and business strategy: An empirical study of small and medium sized firms
    • Jan
    • S.-C. Chang, C.-L. Yang, H.-C. Cheng, and C. Sheu, "Manufacturing flexibility and business strategy: An empirical study of small and medium sized firms," Int. J. Prod. Econ.; vol. 83, no. 1, pp. 13-26, Jan. 2003.
    • (2003) Int. J. Prod. Econ. , vol.83 , Issue.1 , pp. 13-26
    • Chang, S.-C.1    Yang, C.-L.2    Cheng, H.-C.3    Sheu, C.4
  • 45
    • 33748702773 scopus 로고    scopus 로고
    • Interplay between uncertainty and flexibility across the value-chain: Towards a transformation model of manufacturing flexibility
    • Sep.
    • R. Sawhney, "Interplay between uncertainty and flexibility across the value-chain: Towards a transformation model of manufacturing flexibility," J. Oper. Manag.; vol. 24, no. 5, pp. 476-493, Sep. 2006.
    • (2006) J. Oper. Manag. , vol.24 , Issue.5 , pp. 476-493
    • Sawhney, R.1
  • 47
    • 77954983195 scopus 로고    scopus 로고
    • Redesign and cost estimation of rapid manufactured plastic parts
    • E. Atzeni, L. Iuliano, P. Minetola, and A. Salmi, "Redesign and cost estimation of rapid manufactured plastic parts," Rapid Prototyp. J.; vol. 16, no. 5, pp. 308-317, 2010.
    • (2010) Rapid Prototyp. J. , vol.16 , Issue.5 , pp. 308-317
    • Atzeni, E.1    Iuliano, L.2    Minetola, P.3    Salmi, A.4
  • 48
    • 34547491325 scopus 로고    scopus 로고
    • Selective laser melting of biocompatible metals for rapid manufacturing of medical parts
    • Jul
    • B. Vandenbroucke and J.-P. Kruth, "Selective laser melting of biocompatible metals for rapid manufacturing of medical parts," Rapid Prototyp. J.; vol. 13, no. 4, pp. 196-203, Jul. 2007.
    • (2007) Rapid Prototyp. J. , vol.13 , Issue.4 , pp. 196-203
    • Vandenbroucke, B.1    Kruth, J.-P.2
  • 50
    • 33746353717 scopus 로고    scopus 로고
    • Rapid manufacturing of metal components by laser forming
    • Oct
    • E. C. Santos, M. Shiomi, K. Osakada, and T. Laoui, "Rapid manufacturing of metal components by laser forming," Int. J. Mach. Tools Manuf.; vol. 46, no. 12-13, pp. 1459-1468, Oct. 2006.
    • (2006) Int. J. Mach. Tools Manuf. , vol.46 , Issue.12-13 , pp. 1459-1468
    • Santos, E.C.1    Shiomi, M.2    Osakada, K.3    Laoui, T.4
  • 51
    • 84968774158 scopus 로고    scopus 로고
    • Grundlagen des Marketingmanagements: Einführung in Strategien
    • 4th ed. Wiesbaden: Gabler Verlag
    • C. Homburg, Grundlagen des Marketingmanagements: Einführung in Strategien, Instrumente, Umsetzung und Unternehmensführung, 4th ed. Wiesbaden: Gabler Verlag, 2012.
    • (2012) Instrumente, Umsetzung und Unternehmensführung
    • Homburg, C.1
  • 52
    • 0000839837 scopus 로고
    • Product life cycle research: A literature review
    • Sep.
    • D. R. Rink and J. E. Swan, "Product life cycle research: A literature review," J. Bus. Res.; vol. 7, no. 3, pp. 219-242, Sep. 1979.
    • (1979) J. Bus. Res. , vol.7 , Issue.3 , pp. 219-242
    • Rink, D.R.1    Swan, J.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.