|
Volumn 142, Issue 5, 2016, Pages
|
Successive linear programming approach applied to BBLAWN
|
Author keywords
Headloss; Optimal operation; Pipe sizing; Pump scheduling; Water system
|
Indexed keywords
ENERGY UTILIZATION;
LINEAR PROGRAMMING;
OPTIMIZATION;
PRESSURE REGULATORS;
PUMPS;
SCHEDULING;
TANKS (CONTAINERS);
WATER DISTRIBUTION SYSTEMS;
HEADLOSS;
NON-LINEAR CONSTRAINTS;
OPTIMAL OPERATION;
OPTIMIZATION MODELING;
PRESSURE REDUCING VALVES;
PUMP SCHEDULING;
SUCCESSIVE LINEAR PROGRAMMING;
WATER SYSTEM;
WATER TANKS;
LEAKAGE;
LINEAR PROGRAMING;
NUMERICAL MODEL;
OPTIMIZATION;
PIPE;
|
EID: 84964680214
PISSN: 07339496
EISSN: None
Source Type: Journal
DOI: 10.1061/(ASCE)WR.1943-5452.0000563 Document Type: Article |
Times cited : (7)
|
References (2)
|