메뉴 건너뛰기




Volumn , Issue , 2007, Pages 460-464

Integrating Analytical and Simulation Techniques in Multi-Echelon Cyclic Planning

Author keywords

[No Author keywords available]

Indexed keywords

LIFE CYCLE; SUPPLY CHAINS;

EID: 84963959660     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/AMS.2007.54     Document Type: Conference Paper
Times cited : (24)

References (6)
  • 1
    • 0000204962 scopus 로고
    • Cyclical schedules for capacitated lot sizing with dynamic demands
    • G.M. Campbell, V.A. Mabert, "Cyclical schedules for capacitated lot sizing with dynamic demands", Management Science, vol. 37, no. 4, pp. 409-427, 1991.
    • (1991) Management Science , vol.37 , Issue.4 , pp. 409-427
    • Campbell, G.M.1    Mabert, V.A.2
  • 2
    • 0030217546 scopus 로고    scopus 로고
    • Cyclic assembly schedules for dynamic demands
    • G.M. Campbell, "Cyclic assembly schedules for dynamic demands", IIE Transactions, 28, pp. 643-651, 1996.
    • (1996) IIE Transactions , vol.28 , pp. 643-651
    • Campbell, G.M.1
  • 3
    • 0039253629 scopus 로고    scopus 로고
    • Using cyclic planning to manage capacity at ALCOA
    • E. Schmidt, M. Dada, J. Ward, D. Adams, "Using cyclic planning to manage capacity at ALCOA", Interfaces, vol. 31, no. 3, pp. 16-27, 2001.
    • (2001) Interfaces , vol.31 , Issue.3 , pp. 16-27
    • Schmidt, E.1    Dada, M.2    Ward, J.3    Adams, D.4
  • 4
    • 84963938876 scopus 로고    scopus 로고
    • Autonomous Management School of Ghent University and Katholieke Universiteit Leuven, IMBA
    • B. Desmet, Collaborative processing in the extended supply chains, Autonomous Management School of Ghent University and Katholieke Universiteit Leuven, 154 p., IMBA 2003-2004.
    • (2003) Collaborative Processing in the Extended Supply Chains
    • Desmet, B.1
  • 5
    • 50149102457 scopus 로고    scopus 로고
    • Evaluating the 'optimality gap' between cyclic and noncyclic planning policies in supply chains
    • Wroclaw, Poland, December
    • G. Merkuryeva, S. Timmermans, O. Vecherinska, "Evaluating the 'optimality gap' between cyclic and noncyclic planning policies in supply chains", in Proc of Int. Conf. on Production Engineering, 2006. Wroclaw, Poland, December 2006.
    • (2006) Proc of Int. Conf. on Production Engineering, 2006
    • Merkuryeva, G.1    Timmermans, S.2    Vecherinska, O.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.