메뉴 건너뛰기




Volumn 23, Issue 3, 1995, Pages 201-223

Grey quadratic programming and its application to municipal solid waste management planning under uncertainty

Author keywords

decision making; economies of scale; Grey quadratic programming; municipal solid waste management; uncertainty

Indexed keywords


EID: 84963458331     PISSN: 0305215X     EISSN: 10290273     Source Type: Journal    
DOI: 10.1080/03052159508941354     Document Type: Article
Times cited : (88)

References (23)
  • 1
    • 84954829625 scopus 로고
    • A Grey Fuzzy Linear Programming Approach for Municipal Solid Waste Management Planning Under Uncertainty
    • L. Huang, G. H., Baetz, B. W. and Patry, G. G. (1993) A Grey Fuzzy Linear Programming Approach for Municipal Solid Waste Management Planning Under Uncertainty, Civil Engineering Systems, 10, 123–-146.
    • (1993) Civil Engineering Systems , vol.10 , pp. 123-146
    • Huang, L.1    Baetz, B.W.2    Patry, G.G.3
  • 2
    • 84950938520 scopus 로고
    • Grey Linear Programming, Its Solving Approach, and Its Application
    • Huang, G. H. and Moore, R. D. (1993) Grey Linear Programming, Its Solving Approach, and Its Application. International Journal of Systems Science, 24, 159–172.
    • (1993) International Journal of Systems Science , vol.24 , pp. 159-172
    • Huang, G.H.1    Moore, R.D.2
  • 3
    • 84963455687 scopus 로고
    • A Grey Linear Programming Approach for Municipal Solid Waste Management Planning Under Uncertainty
    • Huang, G. H., Baetz, B. W. and Patry, G. G. (1992) A Grey Linear Programming Approach for Municipal Solid Waste Management Planning Under Uncertainty. Civil Engineering Systems, 9, 319–335.
    • (1992) Civil Engineering Systems , vol.9 , pp. 319-335
    • Huang, G.H.1    Baetz, B.W.2    Patry, G.G.3
  • 5
    • 0026106069 scopus 로고
    • An integrated plant loading model with economies of scale and scope
    • Cohen, M. A. and Moon, S. (1991) An integrated plant loading model with economies of scale and scope. European J. of Operational Research, 50, 266–279.
    • (1991) European J. of Operational Research , vol.50 , pp. 266-279
    • Cohen, M.A.1    Moon, S.2
  • 6
    • 21144472695 scopus 로고
    • Location and allocation for distribution systems with transshipments and transportation economies of scale
    • In, edited by Z. Drezner. J.C. Baltzer AG Science Publishers, Basel
    • Campbell, A. (1992) Location and allocation for distribution systems with transshipments and transportation economies of scale. In Annals of Operational Research, Vol. 40, edited by Z. Drezner. J.C. Baltzer AG Science Publishers, Basel.
    • (1992) Annals of Operational Research , vol.40
    • Campbell, A.1
  • 7
    • 0027912255 scopus 로고
    • Designing distribution systems with transport economies of scale
    • Fleischmann, B. (1993) Designing distribution systems with transport economies of scale. European J. of Operational Research, 70, 31–42.
    • (1993) European J. of Operational Research , vol.70 , pp. 31-42
    • Fleischmann, B.1
  • 8
    • 0023450722 scopus 로고
    • A new algorithm for quadratic programming
    • Terlaky,T. (1987) A new algorithm for quadratic programming. European J. of Operational Research,32, 294–301.
    • (1987) European J. of Operational Research , vol.32 , pp. 294-301
    • Terlaky, T.1
  • 9
    • 0025444692 scopus 로고
    • On the numerical realization of the exact penalty method for quadratic programming algorithms
    • Korner, F. (1990) On the numerical realization of the exact penalty method for quadratic programming algorithms. European J, of Operational Research, 46, 404–408.
    • (1990) European J, of Operational Research , vol.46 , pp. 404-408
    • Korner, F.1
  • 10
    • 0026221349 scopus 로고
    • A class of methods for solving large, convex quadratic programs subject to box constraints
    • Yang, E. K. and Tolle, J. W. (1991) A class of methods for solving large, convex quadratic programs subject to box constraints. Mathematical Programming, 51, 223–228.
    • (1991) Mathematical Programming , vol.51 , pp. 223-228
    • Yang, E.K.1    Tolle, J.W.2
  • 11
    • 0007808985 scopus 로고
    • Some generalizations of the criss-cross method for quadratic programming
    • Klafszky, E. and Terlaky, T. (1992) Some generalizations of the criss-cross method for quadratic programming. Optimization, 24, 127–140.
    • (1992) Optimization , vol.24 , pp. 127-140
    • Klafszky, E.1    Terlaky, T.2
  • 12
    • 34249839449 scopus 로고
    • On affine scaling algorithms for nonconvex quadratic programming
    • Ye, Y. (1992) On affine scaling algorithms for nonconvex quadratic programming. Mathematical Programming, 56, 285–300.
    • (1992) Mathematical Programming , vol.56 , pp. 285-300
    • Ye, Y.1
  • 13
    • 0027790159 scopus 로고
    • Unit graph estimation and stabilization using quadratic programming and difference norms
    • Dietrich, C. R. and Chapman, T. G. (1993) Unit graph estimation and stabilization using quadratic programming and difference norms. Water Resources Research, 29, 2629-2635.
    • (1993) Water Resources Research , vol.29 , pp. 2629-2635
    • Dietrich, C.R.1    Chapman, T.G.2
  • 14
    • 0040782562 scopus 로고
    • An unconstrained convex programming approach to solving convex quadratic programming problems
    • Fang, S. C. and Tsao, H.S.-J. (1993) An unconstrained convex programming approach to solving convex quadratic programming problems. Optimization, 27, 235–244.
    • (1993) Optimization , vol.27 , pp. 235-244
    • Fang, S.C.1    Tsao, H.S.-J.2
  • 15
    • 84963476688 scopus 로고
    • LINDO Software, LINDO Software, Inc., Chicago
    • LINDO Software (1988) Linear, interactive Discrete Optimizer, LINDO Software, Inc., Chicago.
    • (1988) Linear, interactive Discrete Optimizer
  • 16
    • 84910879970 scopus 로고
    • A grey chance-constrained programming approach for municipal solid waste management planning under uncertainty
    • In, edited by K. W. Hipel. Kluwer Academic publishers, Dordrecht
    • Huang, G. H., Baetz, B. W. and Patry, G. G. (1994) A grey chance-constrained programming approach for municipal solid waste management planning under uncertainty. In Environmental Management, edited by K. W. Hipel. Kluwer Academic publishers, Dordrecht.
    • (1994) Environmental Management
    • Huang, G.H.1    Baetz, B.W.2    Patry, G.G.3
  • 17
    • 0025480980 scopus 로고
    • Multiobjective Programming in Optimization of the Interval Objective Function
    • Ishibuchi, H. and Tanaka, H. (1990) Multiobjective Programming in Optimization of the Interval Objective Function. European J. of Operational Research, 48, 219–225.
    • (1990) European J. of Operational Research , vol.48 , pp. 219-225
    • Ishibuchi, H.1    Tanaka, H.2
  • 18
    • 0028665777 scopus 로고
    • Grey dynamic programming for solid waste management planning under uncertainty
    • Huang, G. H., Baetz, B. W. and Patry, G. G. (1994) Grey dynamic programming for solid waste management planning under uncertainty. ASCE J. of Urban Planning and Development, 120, 132–156.
    • (1994) ASCE J. of Urban Planning and Development , vol.120 , pp. 132-156
    • Huang, G.H.1    Baetz, B.W.2    Patry, G.G.3
  • 23
    • 34248138979 scopus 로고
    • Waste flow allocation under independent stipulation uncertainties: a grey fuzzy quadratic programming approach
    • (in press)
    • Huang, G. H., Baetz, B. W. and Patry, G. G.(1994) Waste flow allocation under independent stipulation uncertainties: a grey fuzzy quadratic programming approach. Civil Engineering Systems (in press).
    • (1994) Civil Engineering Systems
    • Huang, G.H.1    Baetz, B.W.2    Patry, G.G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.