-
1
-
-
84958740524
-
NRC Inspection Manual, Inspection Procedure 71152, Problem Identification and Resolution [Internet]. U.S.NRC 2015 [cited 2015 Feb 26]. Available from:.
-
United States Nuclear Regulatory Commission (U.S.NRC). NRC Inspection Manual, Inspection Procedure 71152, Problem Identification and Resolution [Internet]. U.S.NRC 2015 [cited 2015 Feb 26]. Available from:. http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/.
-
-
-
-
2
-
-
84958770495
-
-
IAEA, Vienna
-
International Nuclear Safety Advisory Group (IAEA) Safety Series 75-INSAG-1 1988, IAEA, Vienna.
-
(1988)
Safety Series 75-INSAG-1
-
-
-
5
-
-
77957983462
-
Organizing for high reliability: processes of collective mindfulness
-
Weick K., Sutcliffe K., Obstfeld D. Organizing for high reliability: processes of collective mindfulness. Crisis Manag. 2008, 3:81-123.
-
(2008)
Crisis Manag.
, vol.3
, pp. 81-123
-
-
Weick, K.1
Sutcliffe, K.2
Obstfeld, D.3
-
6
-
-
0942284971
-
Organizing for resilience
-
Berrett-Koehler, San Francisco, Chapter 7, K. Cameron, J.E. Dutton, R.E. Quinn (Eds.)
-
Sutcliffe K.M., Vogus T.J. Organizing for resilience. Positive Organizational Scholarship 2003, 94-110. Berrett-Koehler, San Francisco, Chapter 7. K. Cameron, J.E. Dutton, R.E. Quinn (Eds.).
-
(2003)
Positive Organizational Scholarship
, pp. 94-110
-
-
Sutcliffe, K.M.1
Vogus, T.J.2
-
7
-
-
84937550545
-
-
Ashgate, Farnham, Surry, UK
-
Hollnagel E., Woods D., Leveson N. Resilience Engineering: Concepts and Precepts 2006, Ashgate, Farnham, Surry, UK.
-
(2006)
Resilience Engineering: Concepts and Precepts
-
-
Hollnagel, E.1
Woods, D.2
Leveson, N.3
-
8
-
-
79960667731
-
Leading indicators applied to maintenance in the framework of resilience engineering: A conceptual approach
-
The 3rd Resilience Engineering Symposium, Antibes-Juan Les Pins, France
-
I.A. Herrera, J. Hovden, Leading indicators applied to maintenance in the framework of resilience engineering: A conceptual approach, The 3rd Resilience Engineering Symposium, Antibes-Juan Les Pins, France, 2008 Oct 28-30.
-
(2008)
-
-
Herrera, I.A.1
Hovden, J.2
-
9
-
-
84900015121
-
How Resilient is Your Organisation? An Introduction to the Resilience Analysis Grid (RAG)
-
Sustainable Transformation: Building a Resilient Organization, Toronto, Canada, 2010 May.
-
E. Hollnagel, How Resilient is Your Organisation? An Introduction to the Resilience Analysis Grid (RAG). Sustainable Transformation: Building a Resilient Organization, Toronto, Canada, 2010 May.
-
-
-
Hollnagel, E.1
-
10
-
-
84958771888
-
The Stress-Strain Model of Resilience Operationalizes the Four Cornerstones of Resilience Engineering, 5th REA Symposium: Managing Trade-Offs, Soesterberg, Netherlands
-
D. Woods, Y. Chan, J. Wreathall, The Stress-Strain Model of Resilience Operationalizes the Four Cornerstones of Resilience Engineering, 5th REA Symposium: Managing Trade-Offs, Soesterberg, Netherlands, 2013, Jun 24-27.
-
(2013)
, pp. 24-27
-
-
Woods, D.1
Chan, Y.2
Wreathall, J.3
-
11
-
-
84919798121
-
Development and first application of an operating events ranking
-
Simic Z., Zergera B., Banov R. Development and first application of an operating events ranking. Nucl. Eng. Des. 2015, 282:36-43.
-
(2015)
Nucl. Eng. Des.
, vol.282
, pp. 36-43
-
-
Simic, Z.1
Zergera, B.2
Banov, R.3
-
13
-
-
84958824429
-
Developing Human Performance Measures, Project Milestone Deliverable: Letter Report, INL JCN Y6843
-
B. Hallbert, Developing Human Performance Measures, Project Milestone Deliverable: Letter Report, INL JCN Y6843, 2006 Mar 7.
-
(2006)
-
-
Hallbert, B.1
-
14
-
-
84958824430
-
Evaluation of Barriers and Resilience to Improve Organizational Performance in Nuclear Power Plants, Proceedings from Annual Mexican Nuclear Society Conference, Boca del Río
-
Veracruz, 2014, 31 Aug-4 Sep.
-
P. Nelson, C. Martín del Campo, Evaluation of Barriers and Resilience to Improve Organizational Performance in Nuclear Power Plants, Proceedings from Annual Mexican Nuclear Society Conference, Boca del Río, Veracruz, 2014, 31 Aug-4 Sep.
-
-
-
Nelson, P.1
Martín del Campo, C.2
-
15
-
-
0001176442
-
The negotiated order of organizational reliability
-
Schulman P.R. The negotiated order of organizational reliability. Adm. Soc. 1993, 25:353-372.
-
(1993)
Adm. Soc.
, vol.25
, pp. 353-372
-
-
Schulman, P.R.1
-
16
-
-
84856763959
-
-
Ashgate Publishing, Ltd, Farnham, Surry, UK, J. Pariès, J. Wreathall, D. Woods, E. Hollnagel (Eds.)
-
Resilience Engineering in Practice: A Guide Book 2012, Oct 1, Ashgate Publishing, Ltd, Farnham, Surry, UK. J. Pariès, J. Wreathall, D. Woods, E. Hollnagel (Eds.).
-
(2012)
Resilience Engineering in Practice: A Guide Book
-
-
-
17
-
-
84958754869
-
-
Ashgate Publishing, Farnham, Surry, UK
-
Woods D., Wreathall J. Stress-Strain Plots as a Basis for Assessing System Resilience, Resilience Engineering Perspectives 2008, vol. 1. Ashgate Publishing, Farnham, Surry, UK.
-
(2008)
Stress-Strain Plots as a Basis for Assessing System Resilience, Resilience Engineering Perspectives
, vol.1
-
-
Woods, D.1
Wreathall, J.2
-
18
-
-
84958771741
-
Human Factors Information System [Internet]. U.S.NRC [cited 2014 Apr]
-
United States Nuclear Regulatory Commission (U.S.NRC), Human Factors Information System [Internet]. U.S.NRC [cited 2014 Apr]. Available from:. http://www.nrc.gov/reading-rm/doc-collections/human-factors/.
-
-
-
-
20
-
-
84958824431
-
EPRI Guidelines for Leading Indicators of Human Performance Preliminary Guidance for Use of Workplace and Analytical Indicators of Human Performance, TR-107315 [Internet]
-
EPRI, Palo Alto (CA), 1999 [cited 2014 Oct 25]
-
Electric Power Research Institute (EPRI). EPRI Guidelines for Leading Indicators of Human Performance Preliminary Guidance for Use of Workplace and Analytical Indicators of Human Performance, TR-107315 [Internet]. EPRI, Palo Alto (CA), 1999 [cited 2014 Oct 25]. Available from:. http://www.epri.com/abstracts/Pages/ProductAbstract.aspx?ProductId=TR-107315.
-
-
-
-
21
-
-
84958824432
-
In-Service Use of the Human Performance Assistance Package Experience Using PAOWF and Leading Indicators of Organizational Health, 1007491 [Internet]
-
EPRI, Palo Alto (CA), 2003 [cited 2013 Feb 28]
-
Electric Power Research Institute (EPRI). In-Service Use of the Human Performance Assistance Package Experience Using PAOWF and Leading Indicators of Organizational Health, 1007491 [Internet]. EPRI, Palo Alto (CA), 2003 [cited 2013 Feb 28]. Available from:. http://www.epri.com/abstracts/Pages/ProductAbstract.aspx?ProductId=000000000001007491.
-
-
-
-
22
-
-
34248666540
-
Fuzzy Sets, Inf
-
Zadeh L.A. Fuzzy Sets, Inf. Control 1965, 8:338-353.
-
(1965)
Control
, vol.8
, pp. 338-353
-
-
Zadeh, L.A.1
-
24
-
-
84958775190
-
A Fuzzy Logic Based Method to Monitor Organizational Resilience: Application In a Brazilian Radioactive Facility, 2013 International Nuclear Atlantic Conference - INAC 2013
-
Recife, PE, Brazil, 2013 Nov 24-29.
-
C.H.S. Grecco, M.C.R. Vidal, C.A.N. Cosenza, I.J.A.L. Santos, P.V.R. Carvalho, A Fuzzy Logic Based Method to Monitor Organizational Resilience: Application In a Brazilian Radioactive Facility, 2013 International Nuclear Atlantic Conference - INAC 2013, Recife, PE, Brazil, 2013 Nov 24-29.
-
-
-
Grecco, C.H.S.1
Vidal, M.C.R.2
Cosenza, C.A.N.3
Santos, I.J.A.L.4
Carvalho, P.V.R.5
-
25
-
-
84875896426
-
The Fukushima disaster-systemic failures as the lack of resilience
-
Hollnagel E., Fujita Y. The Fukushima disaster-systemic failures as the lack of resilience. Nucl. Eng. Technol. 2013, 45:13-20.
-
(2013)
Nucl. Eng. Technol.
, vol.45
, pp. 13-20
-
-
Hollnagel, E.1
Fujita, Y.2
|