-
1
-
-
84862794677
-
Guest editorial: Special issue on integration of intermittent renewable energy resources into power grid
-
Mar.
-
L.Wang, C. Singh, and A. Kusiak, "Guest editorial: Special issue on integration of intermittent renewable energy resources into power grid," IEEE Syst. J., vol. 6, no. 1, pp. 2-3, Mar. 2012.
-
(2012)
IEEE Syst. J.
, vol.6
, Issue.1
, pp. 2-3
-
-
Wang, L.1
Singh, C.2
Kusiak, A.3
-
2
-
-
77958487600
-
Conditional prediction intervals of wind power generation
-
Nov.
-
P. Pinson and G. Kariniotakis, "Conditional prediction intervals of wind power generation," IEEE Trans. Power Syst., vol. 25, no. 4, pp. 1845-1856, Nov. 2010.
-
(2010)
IEEE Trans. Power Syst.
, vol.25
, Issue.4
, pp. 1845-1856
-
-
Pinson, P.1
Kariniotakis, G.2
-
3
-
-
84903279004
-
Probabilistic optimal power flow considering correlations of wind speeds following different distributions
-
Jul.
-
Y. Li, W. Li, W. Yan, J. Yu, and X. Zhao, "Probabilistic optimal power flow considering correlations of wind speeds following different distributions," IEEE Trans. Power Syst., vol. 29, no. 4, pp. 1847-1854, Jul. 2014.
-
(2014)
IEEE Trans. Power Syst.
, vol.29
, Issue.4
, pp. 1847-1854
-
-
Li, Y.1
Li, W.2
Yan, W.3
Yu, J.4
Zhao, X.5
-
4
-
-
84899656251
-
Point estimate method addressing correlated wind power for probabilistic optimal power flow
-
May
-
C. S. Saunders, "Point estimate method addressing correlated wind power for probabilistic optimal power flow," IEEE Trans. Power Syst., vol. 29, no. 3, pp. 1045-1054, May 2014.
-
(2014)
IEEE Trans. Power Syst.
, vol.29
, Issue.3
, pp. 1045-1054
-
-
Saunders, C.S.1
-
5
-
-
67650727683
-
A review on the economic dispatch and risk management considering wind power in the power market
-
B. Ren and C. Jiang, "A review on the economic dispatch and risk management considering wind power in the power market," Renew. Sustain. Energy Rev., vol. 13, no. 8, pp. 2169-2174, 2009.
-
(2009)
Renew. Sustain. Energy Rev.
, vol.13
, Issue.8
, pp. 2169-2174
-
-
Ren, B.1
Jiang, C.2
-
6
-
-
33847610105
-
Probabilistic optimal power flow in electricity markets based on a two-point estimate method
-
Nov.
-
G. Verbic and C. A. Canizares, "Probabilistic optimal power flow in electricity markets based on a two-point estimate method," IEEE Trans. Power Syst., vol. 21, no. 4, pp. 1883-1893, Nov. 2006.
-
(2006)
IEEE Trans. Power Syst.
, vol.21
, Issue.4
, pp. 1883-1893
-
-
Verbic, G.1
Canizares, C.A.2
-
7
-
-
85008038959
-
Analysis of probabilistic optimal power flow taking account of the variation of load power
-
Nov.
-
X. Li, Y. Li, and S. Zhang, "Analysis of probabilistic optimal power flow taking account of the variation of load power," IEEE Trans. Power Syst., vol. 23, no. 3, pp. 992-999, Nov. 2008.
-
(2008)
IEEE Trans. Power Syst.
, vol.23
, Issue.3
, pp. 992-999
-
-
Li, X.1
Li, Y.2
Zhang, S.3
-
8
-
-
0031645047
-
Probabilistic optimal power flow
-
Waterloo, ON, Canada, May
-
M. Madrigal, K. Ponnambalam, and V. H. Quintana, "Probabilistic optimal power flow," in Proc. IEEE Can. Conf. Electr. Comput. Eng., Waterloo, ON, Canada, May 1998, pp. 385-388.
-
(1998)
Proc. IEEE Can. Conf. Electr. Comput. Eng.
, pp. 385-388
-
-
Madrigal, M.1
Ponnambalam, K.2
Quintana, V.H.3
-
9
-
-
18944402673
-
Cumulant-based probabilistic optimal power flow (P-OPF) with Gaussian and gamma distributions
-
May
-
A. Schellenberg, W. Rosehart, and J. Aguado, "Cumulant-based probabilistic optimal power flow (P-OPF) with Gaussian and gamma distributions," IEEE Trans. Power Syst., vol. 20, no. 2, pp. 773-781, May 2005.
-
(2005)
IEEE Trans. Power Syst.
, vol.20
, Issue.2
, pp. 773-781
-
-
Schellenberg, A.1
Rosehart, W.2
Aguado, J.3
-
10
-
-
70350728415
-
Enhancements to the cumulant method for probabilistic optimal power flow studies
-
Nov.
-
A. Tamtum, A. Schellenberg, and W. Rosehart, "Enhancements to the cumulant method for probabilistic optimal power flow studies," IEEE Trans. Power Syst., vol. 24, no. 4, pp. 1739-1746, Nov. 2009.
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, Issue.4
, pp. 1739-1746
-
-
Tamtum, A.1
Schellenberg, A.2
Rosehart, W.3
-
11
-
-
77955689529
-
Economic load dispatch constrained by wind power availability: A here-and-now approach
-
Apr.
-
X. Liu and W. Xu, "Economic load dispatch constrained by wind power availability: A here-and-now approach," IEEE Trans. Sustain. Energy, vol. 1, no. 1, pp. 2-9, Apr. 2010.
-
(2010)
IEEE Trans. Sustain. Energy
, vol.1
, Issue.1
, pp. 2-9
-
-
Liu, X.1
Xu, W.2
-
12
-
-
84867990645
-
An optimal power flow algorithm to achieve robust operation considering load and renewable generation uncertainties
-
Nov.
-
H. Yu and W. D. Rosehart, "An optimal power flow algorithm to achieve robust operation considering load and renewable generation uncertainties," IEEE Trans. Power Syst., vol. 27, no. 4, pp. 1808-1817, Nov. 2012.
-
(2012)
IEEE Trans. Power Syst.
, vol.27
, Issue.4
, pp. 1808-1817
-
-
Yu, H.1
Rosehart, W.D.2
-
13
-
-
77954834157
-
Intermittent wind generation in optimal power flow dispatching
-
R. A. Jabr and B. C. Pal, "Intermittent wind generation in optimal power flow dispatching," IET Gener. Transm. Distrib., vol. 3, no. 1, pp. 66-74, 2009.
-
(2009)
IET Gener. Transm. Distrib.
, vol.3
, Issue.1
, pp. 66-74
-
-
Jabr, R.A.1
Pal, B.C.2
-
14
-
-
44349093221
-
An economic dispatch model incorporating wind power
-
Jun.
-
J. Hetzer, D. C. Yu, and K. Bhattarai, "An economic dispatch model incorporating wind power," IEEE Trans. Energy Convers., vol. 23, no. 2, pp. 603-611, Jun. 2008.
-
(2008)
IEEE Trans. Energy Convers.
, vol.23
, Issue.2
, pp. 603-611
-
-
Hetzer, J.1
Yu, D.C.2
Bhattarai, K.3
-
15
-
-
84861756734
-
Optimal power flow solution incorporating wind power
-
Jun.
-
L. Shi, C. Wang, L. Yao, and Y. Ni, "Optimal power flow solution incorporating wind power," IEEE Syst. J., vol. 6, no. 2, pp. 233-241, Jun. 2012.
-
(2012)
IEEE Syst. J.
, vol.6
, Issue.2
, pp. 233-241
-
-
Shi, L.1
Wang, C.2
Yao, L.3
Ni, Y.4
-
16
-
-
84903973841
-
The value of using chanceconstrained optimal power flows for generation re-dispatch under uncertainty with detailed security constraints
-
Jul. 12-14
-
C. Hamon, M. Perninge, and L. Soder, "The value of using chanceconstrained optimal power flows for generation re-dispatch under uncertainty with detailed security constraints," in Proc. IEEE PES Asia-Pac. Power Energy Eng. Conf. (APPEEC'13), Jul. 12-14, 2013, pp. 1-6.
-
(2013)
Proc. IEEE PES Asia-Pac. Power Energy Eng. Conf. (APPEEC'13)
, pp. 1-6
-
-
Hamon, C.1
Perninge, M.2
Soder, L.3
-
17
-
-
80054912363
-
Chance constrained programming for optimal power flow under uncertainty
-
Nov.
-
H. Zhang and P. Li, "Chance constrained programming for optimal power flow under uncertainty," IEEE Trans. Power Syst., vol. 26, no. 4, pp. 2417-2424, Nov. 2011.
-
(2011)
IEEE Trans. Power Syst.
, vol.26
, Issue.4
, pp. 2417-2424
-
-
Zhang, H.1
Li, P.2
-
18
-
-
84881436912
-
Chance constrained optimal power flow with non-Gaussian distributed uncertain wind power generation
-
May 5-8
-
M. Kloppel, A. Gabash, A. Geletu, and P. Li, "Chance constrained optimal power flow with non-Gaussian distributed uncertain wind power generation," in Proc. 12th Int. Conf. Environ. Electr. Eng. (EEEIC'13), May 5-8, 2013, pp. 265-270.
-
(2013)
Proc. 12th Int. Conf. Environ. Electr. Eng. (EEEIC'13)
, pp. 265-270
-
-
Kloppel, M.1
Gabash, A.2
Geletu, A.3
Li, P.4
-
19
-
-
84880060050
-
Chance-constrained optimizationbased unbalanced optimal power flow for radial distribution networks
-
Jul.
-
Y. Cao, Y. Tan, C. Li, and C. Rehtanz, "Chance-constrained optimizationbased unbalanced optimal power flow for radial distribution networks," IEEE Trans. Power Del., vol. 28, no. 3, pp. 1855-1864, Jul. 2013.
-
(2013)
IEEE Trans. Power Del.
, vol.28
, Issue.3
, pp. 1855-1864
-
-
Cao, Y.1
Tan, Y.2
Li, C.3
Rehtanz, C.4
-
20
-
-
84902352554
-
Robust modeling of probabilistic uncertainty in smart Grids: Data ambiguous chance constrained optimum power flow
-
Dec. 10-13
-
D. Bienstock, M. Chertkov, and S. Harnett, "Robust modeling of probabilistic uncertainty in smart Grids: Data ambiguous chance constrained optimum power flow," in Proc. IEEE 52nd Annu. Conf. Decis. Control (CDC'13), Dec. 10-13, 2013, pp. 4335-4339.
-
(2013)
Proc. IEEE 52nd Annu. Conf. Decis. Control (CDC'13)
, pp. 4335-4339
-
-
Bienstock, D.1
Chertkov, M.2
Harnett, S.3
-
21
-
-
84886099587
-
Adjustable robust OPF with renewable energy sources
-
Nov.
-
R. A. Jabr, "Adjustable robust OPF with renewable energy sources," IEEE Trans. Power Syst., vol. 28, no. 4, pp. 4742-4751, Nov. 2013.
-
(2013)
IEEE Trans. Power Syst.
, vol.28
, Issue.4
, pp. 4742-4751
-
-
Jabr, R.A.1
-
22
-
-
77953404139
-
Probabilistic analysis for optimal power flow under uncertainty
-
H. Zhang and P. Li, "Probabilistic analysis for optimal power flow under uncertainty," IET Gener. Transm. Distrib., vol. 4, no. 5, pp. 553-561, 2010.
-
(2010)
IET Gener. Transm. Distrib.
, vol.4
, Issue.5
, pp. 553-561
-
-
Zhang, H.1
Li, P.2
-
23
-
-
1442313488
-
Probabilistic load flow computation using method of combined cumulants and Gram-Charlier expansion
-
Feb.
-
P. Zhang and S. T. Lee, "Probabilistic load flow computation using method of combined cumulants and Gram-Charlier expansion," IEEE Trans. Power Syst., vol. 19, no. 1, pp. 676-682, Feb. 2004.
-
(2004)
IEEE Trans. Power Syst.
, vol.19
, Issue.1
, pp. 676-682
-
-
Zhang, P.1
Lee, S.T.2
-
24
-
-
0007260294
-
Expansions for nearly Gaussian distributions
-
S. Blinnikov and R. Moessner, "Expansions for nearly Gaussian distributions," Astron. Astrophys. Suppl. Ser., vol. 130, pp. 193-205, 1998.
-
(1998)
Astron. Astrophys. Suppl. Ser.
, vol.130
, pp. 193-205
-
-
Blinnikov, S.1
Moessner, R.2
-
25
-
-
71749103439
-
Probabilistic load flow in systems with wind generation
-
J. Usaola, "Probabilistic load flow in systems with wind generation," IET Gener. Transm. Distrib., vol. 3, no. 12, pp. 1031-1041, 2009.
-
(2009)
IET Gener. Transm. Distrib.
, vol.3
, Issue.12
, pp. 1031-1041
-
-
Usaola, J.1
-
26
-
-
84867995366
-
Probabilistic power flow studies for transmission systems with photovoltaic generation using cumulants
-
Nov.
-
M. Fan, V. Vittal, G. T. Heydt, and R. Ayyanar, "Probabilistic power flow studies for transmission systems with photovoltaic generation using cumulants," IEEE Trans. Power Syst., vol. 27, no. 4, pp. 2251-2261, Nov. 2012.
-
(2012)
IEEE Trans. Power Syst.
, vol.27
, Issue.4
, pp. 2251-2261
-
-
Fan, M.1
Vittal, V.2
Heydt, G.T.3
Ayyanar, R.4
-
27
-
-
68349150313
-
A chance constrained transmission network expansion planning method with consideration of load and wind farm uncertainties
-
Aug.
-
H. Yu, C. Y. Chung, K. P. Wong, and J. H. Zhang, "A chance constrained transmission network expansion planning method with consideration of load and wind farm uncertainties," IEEE Trans. Power Syst., vol. 24, no. 3, pp. 1568-1576, Aug. 2009.
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, Issue.3
, pp. 1568-1576
-
-
Yu, H.1
Chung, C.Y.2
Wong, K.P.3
Zhang, J.H.4
-
28
-
-
84860250598
-
Probabilistic analysis of small-signal stability of large-scale power systems as affected by penetration of wind generation
-
May
-
S. Q. Bu, W. Du, H. F. Wang, Z. Chen, L. Y. Xiao, and H. F. Li, "Probabilistic analysis of small-signal stability of large-scale power systems as affected by penetration of wind generation," IEEE Trans. Power Syst., vol. 27, no. 2, pp. 762-770, May 2012.
-
(2012)
IEEE Trans. Power Syst.
, vol.27
, Issue.2
, pp. 762-770
-
-
Bu, S.Q.1
Du, W.2
Wang, H.F.3
Chen, Z.4
Xiao, L.Y.5
Li, H.F.6
-
29
-
-
76649139141
-
Statistical representation of distribution system loads using Gaussian mixture model
-
Feb.
-
R. Singh, B. C. Pal, and R. A. Jabr, "Statistical representation of distribution system loads using Gaussian mixture model," IEEE Trans. Power Syst., vol. 25, no. 1, pp. 29-37, Feb. 2010.
-
(2010)
IEEE Trans. Power Syst.
, vol.25
, Issue.1
, pp. 29-37
-
-
Singh, R.1
Pal, B.C.2
Jabr, R.A.3
-
30
-
-
84863541904
-
Probabilistic load flow with non-Gaussian correlated random variables using Gaussian mixture models
-
G. Valverde, A. T. Saric, and V. Terzija, "Probabilistic load flow with non-Gaussian correlated random variables using Gaussian mixture models," IET Gener. Transm. Distrib., vol. 6, no. 7, pp. 701-709, 2012.
-
(2012)
IET Gener. Transm. Distrib.
, vol.6
, Issue.7
, pp. 701-709
-
-
Valverde, G.1
Saric, A.T.2
Terzija, V.3
-
31
-
-
79960892341
-
Probabilistic load flow including wind power generation
-
Aug.
-
D. Villanueva, J. L. Pazos, and F. Feijoo, "Probabilistic load flow including wind power generation," IEEE Trans. Power Syst., vol. 26, no. 3, pp. 1659-1667, Aug. 2011.
-
(2011)
IEEE Trans. Power Syst.
, vol.26
, Issue.3
, pp. 1659-1667
-
-
Villanueva, D.1
Pazos, J.L.2
Feijoo, F.3
-
32
-
-
0029409018
-
Large-scale economic dispatch by genetic algorithm
-
Nov.
-
P.-H. Chen and H.-C. Chang, "Large-scale economic dispatch by genetic algorithm," IEEE Trans. Power Syst., vol. 10, no. 4, pp. 1919-1926, Nov. 1995.
-
(1995)
IEEE Trans. Power Syst.
, vol.10
, Issue.4
, pp. 1919-1926
-
-
Chen, P.-H.1
Chang, H.-C.2
-
33
-
-
0037298255
-
Evolutionary programming techniques for economic load dispatch
-
Feb.
-
N. Sinha, R. Chakrabarti, and P. K. Chattopadhyay, "Evolutionary programming techniques for economic load dispatch," IEEE Trans. Evol. Comput., vol. 7, no. 1, pp. 83-94, Feb. 2003.
-
(2003)
IEEE Trans. Evol. Comput.
, vol.7
, Issue.1
, pp. 83-94
-
-
Sinha, N.1
Chakrabarti, R.2
Chattopadhyay, P.K.3
-
34
-
-
4043072671
-
A solution to the stochastic unit commitment problem using chance constrained programming
-
Aug.
-
U. A. Ozturk, M. Mazumdar, and B. A. Norman, "A solution to the stochastic unit commitment problem using chance constrained programming," IEEE Trans. Power Syst., vol. 19, no. 3, pp. 1589-1598, Aug. 2004.
-
(2004)
IEEE Trans. Power Syst.
, vol.19
, Issue.3
, pp. 1589-1598
-
-
Ozturk, U.A.1
Mazumdar, M.2
Norman, B.A.3
-
36
-
-
84880922834
-
A chance-constrained unit commitment with an n-K security criterion and significant wind generation
-
Aug.
-
D. Pozo and J. Contreras, "A chance-constrained unit commitment with an n-K security criterion and significant wind generation," IEEE Trans. Power Syst., vol. 28, no. 3, pp. 2842-2851, Aug. 2013.
-
(2013)
IEEE Trans. Power Syst.
, vol.28
, Issue.3
, pp. 2842-2851
-
-
Pozo, D.1
Contreras, J.2
-
37
-
-
68349139749
-
Modified chanceconstrained optimization applied to the generation expansion problem
-
Aug.
-
M. Mazadi,W. D. Rosehart, O. Malik, and J. Aguado, "Modified chanceconstrained optimization applied to the generation expansion problem," IEEE Trans. Power Syst., vol. 24, no. 3, pp. 1635-1636, Aug. 2009.
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, Issue.3
, pp. 1635-1636
-
-
Mazadi, M.1
Rosehart, W.D.2
Malik, O.3
Aguado, J.4
-
38
-
-
84864279103
-
A chanceconstrained optimization approach for control of transmission voltages
-
Aug.
-
M. Hajian, M. Glavic, W. D. Rosehart, and H. Zareipour, "A chanceconstrained optimization approach for control of transmission voltages," IEEE Trans. Power Syst., vol. 27, no. 3, pp. 1568-1576, Aug. 2012.
-
(2012)
IEEE Trans. Power Syst.
, vol.27
, Issue.3
, pp. 1568-1576
-
-
Hajian, M.1
Glavic, M.2
Rosehart, W.D.3
Zareipour, H.4
-
39
-
-
84902003460
-
Joint chance constrained programming for hydro reservoir management
-
W. Van Ackooij, R. Zorgati, R. Henrion, and A. Möller, "Joint chance constrained programming for hydro reservoir management," Optim. Eng., vol. 15, pp. 509-531, 2014.
-
(2014)
Optim. Eng.
, vol.15
, pp. 509-531
-
-
Van Ackooij, W.1
Zorgati, R.2
Henrion, R.3
Möller, A.4
-
40
-
-
28244442485
-
Robust self-scheduling under price uncertainty using conditional value-at-risk
-
Nov.
-
R. A. Jabr, "Robust self-scheduling under price uncertainty using conditional value-at-risk," IEEE Trans. Power Syst., vol. 20, no. 4, pp. 1852-1858, Nov. 2005.
-
(2005)
IEEE Trans. Power Syst.
, vol.20
, Issue.4
, pp. 1852-1858
-
-
Jabr, R.A.1
-
41
-
-
68549096097
-
Hedge contract characterization and risk constrained electricity procurement
-
Aug.
-
Q. Zhang and X. Wang, "Hedge contract characterization and risk constrained electricity procurement," IEEE Trans. Power Syst., vol. 24, no. 3, pp. 1547-1558, Aug. 2009.
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, Issue.3
, pp. 1547-1558
-
-
Zhang, Q.1
Wang, X.2
-
42
-
-
84860243876
-
Wind power trading under uncertainty in LMP markets
-
May
-
A. Botterud et al., "Wind power trading under uncertainty in LMP markets," IEEE Trans. Power Syst., vol. 27, no. 2, pp. 894-903, May 2012.
-
(2012)
IEEE Trans. Power Syst.
, vol.27
, Issue.2
, pp. 894-903
-
-
Botterud, A.1
-
43
-
-
84860257961
-
A stochastic control approach to manage operational risk in power systems
-
May
-
M. Perninge and L. Soder, "A stochastic control approach to manage operational risk in power systems," IEEE Trans. Power Syst., vol. 27, no. 2, pp. 1021-1031, May 2012.
-
(2012)
IEEE Trans. Power Syst.
, vol.27
, Issue.2
, pp. 1021-1031
-
-
Perninge, M.1
Soder, L.2
-
45
-
-
70349139237
-
Risk analysis of distribution systems using value at risk methodology
-
May 25-29
-
A. Schreiner, G. Balzer, and A. Precht, "Risk analysis of distribution systems using value at risk methodology," in Proc. 10th Int. Conf. Probab. Methods Appl. Power Syst., May 25-29, 2008, pp. 1-8.
-
(2008)
Proc. 10th Int. Conf. Probab. Methods Appl. Power Syst.
, pp. 1-8
-
-
Schreiner, A.1
Balzer, G.2
Precht, A.3
-
46
-
-
84919930769
-
Security games for risk minimization in automatic generation control
-
Jan.
-
Y. W. Law, T. Alpcan, and M. Palaniswami, "Security games for risk minimization in automatic generation control," IEEE Trans. Power Syst., vol. 30, no. 1, pp. 223-232, Jan. 2015.
-
(2015)
IEEE Trans. Power Syst.
, vol.30
, Issue.1
, pp. 223-232
-
-
Law, Y.W.1
Alpcan, T.2
Palaniswami, M.3
-
47
-
-
67349283978
-
An improved OPA model and blackout risk assessment
-
May
-
S. Mei, F. He, X. Zhang, S.Wu, and G.Wang, "An improved OPA model and blackout risk assessment," IEEE Trans. Power Syst., vol. 24, no. 2, pp. 814-823, May 2009.
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, Issue.2
, pp. 814-823
-
-
Mei, S.1
He, F.2
Zhang, X.3
Wu, S.4
Wang, G.5
-
49
-
-
0018544097
-
IEEE reliability test system
-
Nov./Dec.
-
RTS Task Force of the APM Subcommittee, "IEEE reliability test system," IEEE Trans. Power App. Syst., vol. PAS-98, no. 6, pp. 2047-2054, Nov./Dec. 1979.
-
(1979)
IEEE Trans. Power App. Syst.
, vol.PAS-98
, Issue.6
, pp. 2047-2054
-
-
|