-
1
-
-
0343559103
-
Constraint Based Optimisation and Approximation for Job-Shop Scheduling
-
IJCAI, Montreal, Canada
-
Baptiste, P., Le Pape, C., Nuijten, W.: Constraint Based Optimisation and Approximation for Job-Shop Scheduling. Proceedings of the AAAI-SIGMAN Workshop on Intelligent Manufacturing Systems, IJCAI-95, Montreal, Canada (1995).
-
(1995)
Proceedings of the AAAI-SIGMAN Workshop on Intelligent Manufacturing Systems
, vol.95
-
-
Baptiste, P.1
Le Pape, C.2
Nuijten, W.3
-
3
-
-
84956966338
-
VisOpt – the Solver behind the User Interaction
-
available at URL
-
Barták, R.: VisOpt – the Solver behind the User Interaction. White Paper, InSol Ltd., Israel (1999), available at URL http://www.visopt.com/.
-
(1999)
White Paper, Insol Ltd., Israel
-
-
Barták, R.1
-
6
-
-
0031074857
-
Fast Planning Through Planning Graph Analysis
-
Blum, A. L. and Furst, M. L.: Fast Planning Through Planning Graph Analysis. Artificial Intelligence 90 (1997) 281-300.
-
(1997)
Artificial Intelligence
, vol.90
, pp. 281-300
-
-
Blum, A.L.1
Furst, M.L.2
-
7
-
-
84957025290
-
Resourcebased vs. Task-based Approaches for Scheduling Problems
-
LNCS Series, Springer Verlag
-
Brusoni, V., Console, L., Lamma, E, Mello, P, Milano, M, Terenziani, P.: Resourcebased vs. Task-based Approaches for Scheduling Problems. Proceedings of the 9th ISMIS96, LNCS Series, Springer Verlag (1996).
-
(1996)
Proceedings of the 9Th ISMIS96
-
-
Brusoni, V.1
Console, L.2
Lamma, E.3
Mello, P.4
Milano, M.5
Terenziani, P.6
-
8
-
-
0002785086
-
Improved CLP Scheduling with Task Intervals
-
MIT Press
-
Caseau, Y., Laburthe, F.: Improved CLP Scheduling with Task Intervals. Proceedings of ICLP94, MIT Press, (1994) 369-383.
-
(1994)
Proceedings of ICLP94
, pp. 369-383
-
-
Caseau, Y.1
Laburthe, F.2
-
9
-
-
0038981603
-
Cumulative Scheduling with Task Intervals
-
MIT Press
-
Caseau, Y., Laburthe, F.: Cumulative Scheduling with Task Intervals. Proceedings of JICSLP96, MIT Press (1996) 363-337.
-
(1996)
Proceedings of JICSLP96
-
-
Caseau, Y.1
Laburthe, F.2
-
13
-
-
2842560201
-
STRIPS: A New Approach to the Application of Theorem Proving to Problem Solving
-
Fikes, R. E. and Nilsson, N. J.: STRIPS: A New Approach to the Application of Theorem Proving to Problem Solving. Artificial Intelligence 3-4 (1971) 189-208.
-
(1971)
Artificial Intelligence
, vol.3-4
, pp. 189-208
-
-
Fikes, R.E.1
Nilsson, N.J.2
-
16
-
-
0004065746
-
-
Oxford University Press, Oxford
-
Pool, D., Mackworth, A., Goebel, R.: Computational Intelligence – A Logical Approach, Oxford University Press, Oxford (1998).
-
(1998)
Computational Intelligence – a Logical Approach
-
-
Pool, D.1
Mackworth, A.2
Goebel, R.3
-
17
-
-
1642465271
-
Scaling up Planning by teasing out Resource Scheduling
-
Arizona State University
-
Srivastava, B. and Kambhampati, S.: Scaling up Planning by teasing out Resource Scheduling. Technical Report ASU CSE TR 99-005, Arizona State University (1999).
-
(1999)
Technical Report ASU CSE TR 99-005
-
-
Srivastava, B.1
Kambhampati, S.2
-
19
-
-
0042657705
-
-
Constraint Programming, Mayoh B. and Penjaak J. (Eds.), NATO ASI Series, Springer Verlag
-
Wallace, M.: Applying Constraints for Scheduling. Constraint Programming, Mayoh B. and Penjaak J. (Eds.), NATO ASI Series, Springer Verlag (1994).
-
(1994)
Applying Constraints for Scheduling
-
-
Wallace, M.1
|