메뉴 건너뛰기




Volumn 89, Issue , 2006, Pages 149-176

A practical view of the complexity in developing master production schedules: Fundamentals, examples, and implementation

Author keywords

And implementation; Complexity; Information systems; Master production planning; Optimization

Indexed keywords


EID: 84955297613     PISSN: 08848289     EISSN: None     Source Type: Book Series    
DOI: None     Document Type: Chapter
Times cited : (4)

References (23)
  • 1
    • 0021501607 scopus 로고
    • The N-City Traveling Salesman Problem: Statistical Mechanics and the Metropolis Algorithm.
    • Bonomi, E.; & Lutton, J. "The N-City Traveling Salesman Problem: Statistical Mechanics and the Metropolis Algorithm." SI AM Review, 26, 551-568, 1984.
    • (1984) SI AM Review , vol.26 , pp. 551-568
    • Bonomi, E.1    Lutton, J.2
  • 2
    • 84955260840 scopus 로고    scopus 로고
    • Um Sistema para Programação da Produção de Maquinas de Composição SMT
    • Brochonski, P. C. "Um Sistema para Programação da Produção de Maquinas de Composição SMT", Curitiba. 1999.
    • (1999) Curitiba
    • Brochonski, P.C.1
  • 4
    • 0025699777 scopus 로고
    • An Improved Annealing Scheme for the Quadratic Assignment Problem.
    • Connolly, D. T., "An Improved Annealing Scheme for the Quadratic Assignment Problem.” European Journal of Operation Research, 46, 93-100, 1990.
    • (1990) European Journal of Operation Research , vol.46 , pp. 93-100
    • Connolly, D.T.1
  • 9
    • 80052725713 scopus 로고
    • Master production scheduling: A concurrent planning approach.
    • Higgins, P.; & Browne, J. “Master production scheduling: a concurrent planning approach.” Production Planning & Control. Vol.3, No.1, 2-18. 1992.
    • (1992) Production Planning & Control , vol.3 , Issue.1 , pp. 2-18
    • Higgins, P.1    Browne, J.2
  • 10
    • 26444479778 scopus 로고
    • Optimization by Simulated Annealing.
    • Kirkpatrick, S., Gelatt, C. D. Jr.; & Vecchi, M. P. "Optimization by Simulated Annealing." Science, Vol.220, No.4598, 671-680, 1983.
    • (1983) Science , vol.220 , Issue.4598 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt, C.D.2    Vecchi, M.P.3
  • 11
    • 24644521968 scopus 로고
    • Order Promising and the Master Production Schedule
    • McClelland, M. K., “Order Promising and the Master Production Schedule.” Decision Science, 19,4. Fall 1988.
    • (1988) Decision Science , vol.19 , Issue.4
    • McClelland, M.K.1
  • 16
    • 0034631284 scopus 로고    scopus 로고
    • Simulated Annealing for Parallel Machine Scheduling with Earliness-Tardiness penalties and Sequence- Dependent Setup Times.
    • Radhakrishnan, S. & Ventura, J. A. “Simulated Annealing for Parallel Machine Scheduling with Earliness-Tardiness penalties and Sequence- Dependent Setup Times. " International Journal of Production Research”, vol.38, n° 10, 2233-2252, 2000.
    • (2000) International Journal of Production Research” , vol.38 , Issue.10 , pp. 2233-2252
    • Radhakrishnan, S.1    Ventura, J.A.2
  • 23
    • 0037097730 scopus 로고    scopus 로고
    • Comparative Study of Simulated Annealing, Genetic Algorithms and Tabu Search of Solving Binary and Comprehensive Machine-Grouping Problems.
    • Zolfaghari, S.; & Liang, M. “Comparative Study of Simulated Annealing, Genetic Algorithms and Tabu Search of Solving Binary and Comprehensive Machine-Grouping Problems.” International Journal of Production Research, vol.40, n° 9, 2141-2158, 2002.
    • (2002) International Journal of Production Research , vol.40 , Issue.9 , pp. 2141-2158
    • Zolfaghari, S.1    Liang, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.