메뉴 건너뛰기




Volumn 230, Issue 2, 2016, Pages 407-417

An optimal age-usage maintenance strategy containing a failure penalty for application to railway tracks

Author keywords

age based PM; failure penalty; million gross tons (MGT); Railway track; usage based PM

Indexed keywords

DEFECTS; RAILROAD TRACKS; RAILROADS; TRAFFIC SURVEYS; TRANSPORTATION;

EID: 84954326713     PISSN: 09544097     EISSN: 20413017     Source Type: Journal    
DOI: 10.1177/0954409714543337     Document Type: Article
Times cited : (28)

References (35)
  • 1
    • 84954335779 scopus 로고    scopus 로고
    • Trafikverket. Annual report 2011, (accessed 13 November 2013)
    • Trafikverket. Annual report 2011, http://publikationswebbutik.vv.se/upload/6814/2012-083-swedish-transport-administration-annual-report-2011.pdf (accessed 13 November 2013).
  • 2
    • 84954335780 scopus 로고    scopus 로고
    • Models and powers of rail regulators: The views of the regulated companies
    • Florence, Italy, 15 November
    • Ring H. Aims, models and powers of rail regulators: the views of the regulated companies. Presented at The workshop on rail transport regulation, Florence, Italy, 15 November 2010.
    • (2010) Presented at the Workshop on Rail Transport Regulation
    • Ring, H.1    Aims2
  • 6
    • 17744369893 scopus 로고    scopus 로고
    • Maintenance-related losses at the Swedish Rail
    • Holmgren M,. Maintenance-related losses at the Swedish Rail. J Qual Maint Engng 2005; 11: 5-18.
    • (2005) J Qual Maint Engng , vol.11 , pp. 5-18
    • Holmgren, M.1
  • 7
    • 40849096304 scopus 로고    scopus 로고
    • Quantifying effects of incentives in a rail maintenance performance-based contract
    • Stenbeck T,. Quantifying effects of incentives in a rail maintenance performance-based contract. J Construct Engng Mngmnt 2008; 134: 265-272.
    • (2008) J Construct Engng Mngmnt , vol.134 , pp. 265-272
    • Stenbeck, T.1
  • 8
    • 34247169901 scopus 로고    scopus 로고
    • Evaluation of maintenance schedules on railway traction power systems
    • Ho TK, Chi YL, Ferreira L, et al. Evaluation of maintenance schedules on railway traction power systems. Proc IMechE, Part F: J Rail Rapid Transit 2006; 220 (2): 91-102.
    • (2006) Proc IMechE, Part F: J Rail Rapid Transit , vol.220 , Issue.2 , pp. 91-102
    • Ho, T.K.1    Chi, Y.L.2    Ferreira, L.3
  • 9
    • 84858146905 scopus 로고    scopus 로고
    • Biobjective optimization model for maintenance and renewal decisions related to rail track geometry
    • Andrade AR, Teixeira PF,. Biobjective optimization model for maintenance and renewal decisions related to rail track geometry. Transport Res Record: J Transport Res Board 2011; 2261: 163-170.
    • (2011) Transport Res Record: J Transport Res Board , vol.2261 , pp. 163-170
    • Andrade, A.R.1    Teixeira, P.F.2
  • 10
    • 84857217011 scopus 로고    scopus 로고
    • Integer programming to optimize tamping in railway tracks as preventive maintenance
    • Vale C, Ribeiro IM, Calcada R,. Integer programming to optimize tamping in railway tracks as preventive maintenance. J Transport Engng 2012; 138 (1): 123-131.
    • (2012) J Transport Engng , vol.138 , Issue.1 , pp. 123-131
    • Vale, C.1    Ribeiro, I.M.2    Calcada, R.3
  • 12
    • 84902164482 scopus 로고    scopus 로고
    • Evaluation of track geometry maintenance for heavy haul railroad in Sweden: A case study
    • Arasteh-khouy I, Schunnesson H, Juntti U, et al. Evaluation of track geometry maintenance for heavy haul railroad in Sweden: a case study. Proc IMechE, Part F: J Rail Rapid Transit 2014; 228 (5): 496-503.
    • (2014) Proc IMechE, Part F: J Rail Rapid Transit , vol.228 , Issue.5 , pp. 496-503
    • Arasteh-Khouy, I.1    Schunnesson, H.2    Juntti, U.3
  • 14
    • 84861395653 scopus 로고    scopus 로고
    • Failure modelling and maintenance optimization for a railway line
    • Hokstad P, Langseth H, Lindqvist BH, Vatn J,. Failure modelling and maintenance optimization for a railway line. Int J Perform Engng 2005; 1 (1): 51-64.
    • (2005) Int J Perform Engng , vol.1 , Issue.1 , pp. 51-64
    • Hokstad, P.1    Langseth, H.2    Lindqvist, B.H.3    Vatn, J.4
  • 16
    • 70349557866 scopus 로고    scopus 로고
    • Maintenance optimization for a system with a gamma deterioration process and intervention delay: Application to track maintenance
    • Meier-Hirmer C, Riboulet G, Sourget F, Roussignol M,. Maintenance optimization for a system with a gamma deterioration process and intervention delay: application to track maintenance. Proc IMechE, Part O: J Risk Reliab 2009; 223 (3): 189-198.
    • (2009) Proc IMechE, Part O: J Risk Reliab , vol.223 , Issue.3 , pp. 189-198
    • Meier-Hirmer, C.1    Riboulet, G.2    Sourget, F.3    Roussignol, M.4
  • 17
    • 84861358213 scopus 로고    scopus 로고
    • Optimal metro-rail maintenance strategy using multi-nets modelling
    • Bouillaut L, Francois O, Dubois S,. Optimal metro-rail maintenance strategy using multi-nets modelling. Int J Perform Engng 2012; 8 (1): 77-90.
    • (2012) Int J Perform Engng , vol.8 , Issue.1 , pp. 77-90
    • Bouillaut, L.1    Francois, O.2    Dubois, S.3
  • 18
    • 84883412660 scopus 로고    scopus 로고
    • A track ballast maintenance and inspection model for a rail network
    • Prescott D, Andrews J,. A track ballast maintenance and inspection model for a rail network. Proc IMechE, Part O: J Risk Reliab 2013; 227 (3): 251-266.
    • (2013) Proc IMechE, Part O: J Risk Reliab , vol.227 , Issue.3 , pp. 251-266
    • Prescott, D.1    Andrews, J.2
  • 19
    • 84905453748 scopus 로고    scopus 로고
    • Geometrical degradation of railway turnouts: A case study from Swedish heavy haul railroad
    • DOI: 10.1177/0954409713503320
    • Arasteh-khouy I, Larsson-Kråik PO, Nissen A, et al. Geometrical degradation of railway turnouts: a case study from Swedish heavy haul railroad. Proc IMechE, Part F: J Rail Rapid Transit 2013. DOI: 10.1177/0954409713503320.
    • (2013) Proc IMechE, Part F: J Rail Rapid Transit
    • Arasteh-Khouy, I.1    Larsson-Kråik, P.O.2    Nissen, A.3
  • 25
    • 77953916676 scopus 로고    scopus 로고
    • Application of physical failure models to enable usage and load based maintenance
    • Tinga T,. Application of physical failure models to enable usage and load based maintenance. Reliab Engng Syst Saf 2010; 95 (10): 1061-1075.
    • (2010) Reliab Engng Syst Saf , vol.95 , Issue.10 , pp. 1061-1075
    • Tinga, T.1
  • 27
    • 84954317876 scopus 로고    scopus 로고
    • Optimizing rail grinding strategies on the Malmbanan
    • Schöch W, Frick A,. Optimizing rail grinding strategies on the Malmbanan. Railw Gaz Int 2012; 168 (1): 46-46.
    • (2012) Railw Gaz Int , vol.168 , Issue.1 , pp. 46
    • Schöch, W.1    Frick, A.2
  • 28
    • 84954314810 scopus 로고    scopus 로고
    • Managing rail degradation on the Malmbanan
    • Nordmark T, Larsson-Kraik P-O,. Managing rail degradation on the Malmbanan. Railw Gaz Int 2007; 163 (6): 46-46.
    • (2007) Railw Gaz Int , vol.163 , Issue.6 , pp. 46
    • Nordmark, T.1    Larsson-Kraik, P.-O.2
  • 29
    • 69249084048 scopus 로고    scopus 로고
    • Uncertainty estimation in railway track life-cycle cost: A case study from Swedish National Rail Administration
    • Patra AP, Söderholm P, Kumar U,. Uncertainty estimation in railway track life-cycle cost: a case study from Swedish National Rail Administration. Proc IMechE, Part F: J Rail Rapid Transit 2009; 223 (3): 285-293.
    • (2009) Proc IMechE, Part F: J Rail Rapid Transit , vol.223 , Issue.3 , pp. 285-293
    • Patra, A.P.1    Söderholm, P.2    Kumar, U.3
  • 35
    • 0347808559 scopus 로고    scopus 로고
    • PhD Thesis, Virginia Polytechnic Institute and State University, Blacksburg, VA,USA
    • Kim J. Iterated grid search algorithm on unimodal criteria. PhD Thesis, Virginia Polytechnic Institute and State University, Blacksburg, VA,USA, 1997.
    • (1997) Iterated Grid Search Algorithm on Unimodal Criteria
    • Kim, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.