메뉴 건너뛰기




Volumn 2015-October, Issue , 2015, Pages

What-if game simulation in agent-based strategic production planners

Author keywords

Multi agent Systems; Strategic production planning; What if game simulation

Indexed keywords

DECISION MAKING; FACTORY AUTOMATION; INTELLIGENT AGENTS; PLANNING; PRODUCTION CONTROL; STRATEGIC PLANNING;

EID: 84952927704     PISSN: 19460740     EISSN: 19460759     Source Type: Conference Proceeding    
DOI: 10.1109/ETFA.2015.7301438     Document Type: Conference Paper
Times cited : (5)

References (18)
  • 6
    • 70149094122 scopus 로고    scopus 로고
    • Agent-based distributed manufacturing control: A state-of the-art survey
    • P. Leitão, "Agent-based Distributed Manufacturing Control: A State-ofthe-art Survey", Engineering Ap-plications of Artificial Intelligence, vol. 22, n. 7, pp. 979-991, 2009.
    • (2009) Engineering Ap-plications of Artificial Intelligence , vol.22 , Issue.7 , pp. 979-991
    • Leitão, P.1
  • 9
    • 2442667823 scopus 로고    scopus 로고
    • Multi-agent systems in production planning and control: An overview
    • M. Caridi, S. Cavalieri. "Multi-agent Systems in Production Planning and Control: an Overview", Production Planning & Control, vol. 15, n. 2, pp. 106-118, 2004.
    • (2004) Production Planning & Control , vol.15 , Issue.2 , pp. 106-118
    • Caridi, M.1    Cavalieri, S.2
  • 10
    • 84893601698 scopus 로고    scopus 로고
    • Design of a multiagent system for solving search problems
    • L. Florin, "Design of a Multiagent System for Solving Search Problems", Journal of Engineering Studies and Research, vol. 16, n. 3, pp. 51-64, 2010.
    • (2010) Journal of Engineering Studies and Research , vol.16 , Issue.3 , pp. 51-64
    • Florin, L.1
  • 11
    • 2442667823 scopus 로고    scopus 로고
    • Multi-agent systems in production planning and control: An overview
    • M. Caridi, S. Cavalieri, "Multi-agent systems in production planning and control: an overview", Production Planning & Control, vol. 15, n. 2, pp. 106-118, 2004.
    • (2004) Production Planning & Control , vol.15 , Issue.2 , pp. 106-118
    • Caridi, M.1    Cavalieri, S.2
  • 12
    • 84863243978 scopus 로고    scopus 로고
    • A new construction of job-shop scheduling system integrating ILOG and MAS
    • L. Qin, Q. Li, "A New Construction of Job-Shop Scheduling System Integrating ILOG and MAS", Journal of Software, vol. 7, n. 2, pp. 269-276, 2012.
    • (2012) Journal of Software , vol.7 , Issue.2 , pp. 269-276
    • Qin, L.1    Li, Q.2
  • 15
    • 84952886824 scopus 로고    scopus 로고
    • Deliverable 3.3.2, 30th September
    • ARUM (Adaptive Production Management), "ARUM Ontology version-1", Deliverable 3.3.2, 30th September 2013.
    • (2013) ARUM Ontology version-1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.