메뉴 건너뛰기




Volumn 2, Issue 2, 1991, Pages 135-141

Cell formation in the presence of alternate process plans in flexible manufacturing systems

Author keywords

[No Author keywords available]

Indexed keywords


EID: 84952072583     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537289108919340     Document Type: Article
Times cited : (19)

References (21)
  • 2
    • 0023347871 scopus 로고
    • A within cell utilization based heuristic for designing cellular manufacturing systems
    • Ballakur, A., and STEUDEL, H. J., 1987, A within cell utilization based heuristic for designing cellular manufacturing systems, International Journal of Production Research, 25, 5, 639-665.
    • (1987) International Journal of Production Research , vol.25 , Issue.5 , pp. 639-665
    • Ballakur, A.1    Steudel, H.J.2
  • 3
    • 0001413064 scopus 로고
    • Production flow analysis
    • Burbridge, J. L., 1963, Production flow analysis, Production Engineer, 42, 12, 742-752.
    • (1963) Production Engineer , vol.42 , Issue.12 , pp. 742-752
    • Burbridge, J.L.1
  • 4
    • 0020388157 scopus 로고
    • Direct clustering algorithm for group formation in cellular manufacture
    • Chan, H. M., and Milner, D. A., 1982, Direct clustering algorithm for group formation in cellular manufacture, Journal of Manufacturing Systems, 1, 1, 64-76.
    • (1982) Journal of Manufacturing Systems , vol.1 , Issue.1 , pp. 64-76
    • Chan, H.M.1    Milner, D.A.2
  • 6
    • 0024048527 scopus 로고
    • A framework for the design of cellular manufacturing systems
    • Choobineh, F., 1988, A framework for the design of cellular manufacturing systems, International Journal of Production Research, 26, 7, 1161 -1172.
    • (1988) International Journal of Production Research , vol.26 , Issue.7 , pp. 1161-1172
    • Choobineh, F.1
  • 9
    • 0009457822 scopus 로고
    • Analysis of engineering production systems as a base for production oriented reconstruction
    • De Beer, C., Van, Gerwen, R., and De Witte, J., 1976, Analysis of engineering production systems as a base for production oriented reconstruction, Annals of CIRP, 25.
    • (1976) Annals of CIRP , pp. 25
    • De Beer, C.1    Van Gerwen, R.2    De Witte, J.3
  • 10
    • 0001383406 scopus 로고
    • Converting the 0-1 polynomial programming problems to a 0-1 linear program
    • Glover, F., and WOOLSEY, E., 1973, Converting the 0-1 polynomial programming problems to a 0-1 linear program, Operations Research, 21, 1, 156-161.
    • (1973) Operations Research , vol.21 , Issue.1 , pp. 156-161
    • Glover, F.1    Woolsey, E.2
  • 11
    • 0024903365 scopus 로고
    • The cell formation problem in cellular manufacturing systems-A sequential modelling approach
    • Gunasingh, K. R., and LASHKARJ, R. S., 1989, The cell formation problem in cellular manufacturing systems-A sequential modelling approach, Computers and Industrial Engineering, 16, 4, 469-476.
    • (1989) Computers and Industrial Engineering , vol.16 , Issue.4 , pp. 469-476
    • Gunasingh, K.R.1    Lashkarj, R.S.2
  • 13
    • 0018991743 scopus 로고
    • Machine-component grouping in production Dow analysis-An approach using a rank order clustering algorithm
    • King, J. R., 1980, Machine-component grouping in production Dow analysis-An approach using a rank order clustering algorithm, International Journal of Production Research, 18, 2, 213-232.
    • (1980) International Journal of Production Research , vol.18 , Issue.2 , pp. 213-232
    • King, J.R.1
  • 14
    • 84952494480 scopus 로고
    • Machine-component group formation in GT: Review and extension
    • King, J. R., and NaKORNCHAI, V., 1982, Machine-component group formation in GT: review and extension, International Journal of Production Research, 20, 2, 117-133.
    • (1982) International Journal of Production Research , vol.20 , Issue.2 , pp. 117-133
    • King, J.R.1    Nakornchai, V.2
  • 15
    • 0000098622 scopus 로고    scopus 로고
    • Grouping problem in scheduling FMSs
    • Kusiak, A., Vanneli, A., and KUMAR, K. R., 3985, Grouping problem in scheduling FMSs, Robotica, 3, 279-300.
    • Robotica , vol.3 , pp. 279-300
    • Kusiak, A.1    Vanneli, A.2    Kumar, K.R.3
  • 18
    • 84953164255 scopus 로고
    • Application of similarity coefficient method in. GT
    • Seiffodini, H., and WOLFE, P. M., 1986, Application of similarity coefficient method in. GT, IIE Transactions, 18, 3, 271-277.
    • (1986) IIE Transactions , vol.18 , Issue.3 , pp. 271-277
    • Seiffodini, H.1    Wolfe, P.M.2
  • 19
    • 0020718128 scopus 로고
    • Formulation and solution of non-linear integer production planning problems for flexible manufacturing systems
    • Stecke, K.E., 1983, Formulation and solution of non-linear integer production planning problems for flexible manufacturing systems, Management Science, 29, 3, 273-288.
    • (1983) Management Science , vol.29 , Issue.3 , pp. 273-288
    • Stecke, K.E.1
  • 21
    • 0000095365 scopus 로고
    • Procedures for part family/machine group identification problems in cellular manufacturing
    • Wemmerlov, U., and HYER, N. L., 1986, Procedures for part family/machine group identification problems in cellular manufacturing, Journal of Operations Management, 6, 2, 125- 147.
    • (1986) Journal of Operations Management , vol.6 , Issue.2 , pp. 125-147
    • Wemmerlov, U.1    Hyer, N.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.