메뉴 건너뛰기




Volumn 2000-January, Issue , 2000, Pages 245-249

Value-based dispatching for semiconductor wafer fabrication

Author keywords

Costs; Dispatching; Fabrication; Job shop scheduling; Optimal scheduling; Processor scheduling; Research and development; Routing; Semiconductor device manufacture; Single machine scheduling

Indexed keywords

COMPETITION; COSTS; CUSTOMER SATISFACTION; FABRICATION; JOB SHOP SCHEDULING; MANUFACTURE; OPTIMIZATION; PROFITABILITY; SCHEDULING; SCHEDULING ALGORITHMS; SEMICONDUCTOR DEVICES; SILICON WAFERS;

EID: 84949769092     PISSN: 10788743     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ASMC.2000.902595     Document Type: Conference Paper
Times cited : (6)

References (6)
  • 1
    • 0038709760 scopus 로고
    • The Schedule Sequencing Problem
    • Bowman, E. H., (1959), "The Schedule Sequencing Problem", Oper. Res., vol. 7, pp. 621-624
    • (1959) Oper. Res. , vol.7 , pp. 621-624
    • Bowman, E.H.1
  • 4
    • 0000237789 scopus 로고
    • On The Job Shop Scheduling Problem
    • Manne, A. S. (1960), "On The Job Shop Scheduling Problem", Oper. Res., vol. 8, pp. 219-223.
    • (1960) Oper. Res. , vol.8 , pp. 219-223
    • Manne, A.S.1
  • 5
    • 0003054955 scopus 로고
    • A Survey Of Scheduling Rules
    • Jan-Feb
    • Panwalkar, S. S. and Iskander, W., (1977), "A Survey Of Scheduling Rules", Oper. Res., vol. 25, No. 1, Jan-Feb.
    • (1977) Oper. Res. , vol.25 , Issue.1
    • Panwalkar, S.S.1    Iskander, W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.