-
1
-
-
0031621768
-
A survey of factory control algorithms that can be implemented in a multi-agent heterarchy: Dispatching, scheduling, and pull
-
Baker, A. D.: A Survey of Factory Control Algorithms That Can Be Implemented in a Multi-Agent Heterarchy: Dispatching, Scheduling, and Pull. Journal of Manufacturing Systems, Vol. 17, No. 4, 297-320, (1998).
-
(1998)
Journal of Manufacturing Systems
, vol.17
, Issue.4
, pp. 297-320
-
-
Baker, A.D.1
-
2
-
-
0022060981
-
Scheduling the general job-shop
-
May, 31
-
Baker, J. R., and McMahon, G. B.: Scheduling the General Job-Shop, Management Science, May, 31(5), 594-498 (1985).
-
(1985)
Management Science
, Issue.5
, pp. 498-594
-
-
Baker, J.R.1
McMahon, G.B.2
-
4
-
-
0027662516
-
Cellular control of manufacturing systems
-
Della Croce, F., Menga, G., Tadei, R., Cavalotto, M., and Petri, L.: Cellular Control of Manufacturing Systems, Eurapean Journal of Operational Research, Vol. 69, 489-509 (1993).
-
(1993)
Eurapean Journal of Operational Research
, vol.69
, pp. 489-509
-
-
Della Croce, F.1
Menga, G.2
Tadei, R.3
Cavalotto, M.4
Petri, L.5
-
5
-
-
0009360702
-
Hierarchical and non-hierarchical manufacturing cell control with dynamic part-oriented scheduling
-
Minneapolis
-
Duffie, N. A., Piper, R. S., Humphrey, B. J., Hartwick, J. P.: Hierarchical and Non-Hierarchical Manufacturing Cell Control with Dynamic Part-Oriented Scheduling. Proc. ofthe 14th North American Mfg. ResearchConf., Minneapolis, 504-507 (1986).
-
(1986)
Proc. Of the 14th North American Mfg. ResearchConf
, pp. 504-507
-
-
Duffie, N.A.1
Piper, R.S.2
Humphrey, B.J.3
Hartwick, J.P.4
-
6
-
-
0025840039
-
A genetic algorithm for job shop
-
Sacramento, CA, Apr. 9-11
-
Falkenauer E., Bouffouix S.: A Genetic Algorithm for Job Shop. IEEE Int'l Conf. on Robotics and Automation, Sacramento, CA, Apr. 9-11, 824-829 (1991).
-
(1991)
IEEE Int'l Conf. on Robotics and Automation
, pp. 824-829
-
-
Falkenauer, E.1
Bouffouix, S.2
-
7
-
-
0000759103
-
Intelligence and cooperation in heterarchic manufacturing systems
-
Hatvany, J.: Intelligence and Cooperation in Heterarchic Manufacturing Systems. Robotics & Computer-Integrated Manufacturing, Vol. 2, No. 2, 101-104 (1985).
-
(1985)
Robotics & Computer-Integrated Manufacturing
, vol.2
, Issue.2
, pp. 101-104
-
-
Hatvany, J.1
-
8
-
-
0003353181
-
Neural networks
-
2nd Edition, Prentice Hall
-
Haykin, S.: Neural Networks, A Comprehensive Foundation. 2nd Edition, Prentice Hall (1999).
-
(1999)
A Comprehensive Foundation
-
-
Haykin, S.1
-
9
-
-
0032070930
-
Job-shop scheduling using neural networks
-
Jain, A. S., Meeran, S.: Job-Shop Scheduling Using Neural Networks. International Journal ofProduction Research, 36(5), 1249-1272 (1998).
-
(1998)
International Journal Of Production Research
, vol.36
, Issue.5
, pp. 1249-1272
-
-
Jain, A.S.1
Meeran, S.2
-
10
-
-
0001047763
-
Optimisation by simulation annealing: An experimental evaluation. Part II. (Graph coloring and number partitioning)
-
Johnson, D. S., Aragon, C. R., McGeoch, L. A., and Schevon, C.: Optimisation by Simulation Annealing: An Experimental Evaluation. Part II. (Graph Coloring and Number Partitioning), Operations Research, Vol. 39, 378-406 (1991).
-
(1991)
Operations Research
, vol.39
, pp. 378-406
-
-
Johnson, D.S.1
Aragon, C.R.2
McGeoch, L.A.3
Schevon, C.4
-
11
-
-
0007472467
-
Approaches to increase the performance of agent-based production systems
-
Lecture Notes in AI 2070, IEA/AIE-01, 14th International Conference on Industrial & Engineering Applications of Artificial Intelligence & Expert Systems, June 4 -7, 2001, Budapest, Hungary, Springer
-
Kadar, B., Monostori, L.: Approaches to Increase the Performance of Agent-Based Pro-duction Systems. Engineering of Intelligent Systems, Lecture Notes in AI 2070, IEA/AIE-01, 14th International Conference on Industrial & Engineering Applications of Artificial Intelligence & Expert Systems, June 4 -7, 2001, Budapest, Hungary, Springer, 612-621 (2001).
-
(2001)
Engineering of Intelligent Systems
, pp. 612-621
-
-
Kadar, B.1
Monostori, L.2
-
12
-
-
26444479778
-
Optimisation by simulated annealing
-
Kirkpatrick, S., Gelatt, C. D., Vecchi, M. P.: Optimisation by Simulated Annealing. Science, Number 4598, 671-681 (1983).
-
(1983)
Science
, Issue.4598
, pp. 671-681
-
-
Kirkpatrick, S.1
Gelatt, C.D.2
Vecchi, M.P.3
-
13
-
-
0017679093
-
Job-shop scheduling by implicit enumeration
-
December
-
Lageweg, B. J., Lenstra, J. K., and Rinnooy Kan, A. H. G.: Job-Shop Scheduling by Implicit Enumeration, Management Science, December, 24(4), 441-450 (1977).
-
(1977)
Management Science
, vol.24
, Issue.4
, pp. 441-450
-
-
Lageweg, B.J.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
-
14
-
-
0345901561
-
Sequencing and scheduling: Algorithms and complexity
-
Logistics of Production and Inventory, S. C. Graves et al. editors, Elsevier
-
Lawler, E. L., Lenstra, J. K., Rinnooy Kan, A. H. G., and Shmoys, D. B.: Sequencing and Scheduling: Algorithms and Complexity. In: Handbooks in Operations Research and Management Science, Vol. 4: Logistics of Production and Inventory, S. C. Graves et al., editors, Elsevier, 445-522 (1993).
-
(1993)
Handbooks in Operations Research and Management Science
, vol.4
, pp. 445-522
-
-
Lawler, E.L.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
Shmoys, D.B.4
-
15
-
-
0000237789
-
On job-shop scheduling problem
-
Manne, A. S.: On Job-Shop Scheduling Problem, Operations Research, Vol. 8. 219-223 (1960).
-
(1960)
Operations Research
, vol.8
, pp. 219-223
-
-
Manne, A.S.1
-
16
-
-
0030407923
-
Machine learning approaches to manufacturing
-
Monostori, L., Markus, A., Van Brussel, H., Westkamper, E.: Machine Learning Approaches to Manufacturing, CIRP Annals, Vol. 45, No. 2, 675-712 (1996).
-
(1996)
CIRP Annals
, vol.45
, Issue.2
, pp. 675-712
-
-
Monostori, L.1
Markus, A.2
Van Brussel, H.3
Westkamper, E.4
-
18
-
-
0035662013
-
Emergent synthesis methodologies for manufacturing
-
Ueda, K.; Markus, A.; Monostori, L.; Kals, H.J.J.; Arai, T.: Emergent synthesis methodologies for manufacturing, Annals ofthe CIRP, Vol. 50, No. 2, 535-551, (2001).
-
(2001)
Annals Ofthe CIRP
, vol.50
, Issue.2
, pp. 535-551
-
-
Ueda, K.1
Markus, A.2
Monostori, L.3
Kals, H.J.J.4
Arai, T.5
-
19
-
-
23044525610
-
Multi-agent coordination and control using Stigmergy applied to manufacturing control
-
Prague
-
Valckenaers, P., Van Brussel, H., Kollingbaum, M., and Bochmann, O.: Multi-Agent Coordination and Control Using Stigmergy Applied to Manufacturing Control. European Agent Systems Summer School, Prague, 317-334 (2001).
-
(2001)
European Agent Systems Summer School
, pp. 317-334
-
-
Valckenaers, P.1
Van Brussel, H.2
Kollingbaum, M.3
Bochmann, O.4
-
20
-
-
0020800182
-
Co-operative systems -an evolutionary perspective
-
Vamos, T.: Co-operative Systems -An Evolutionary Perspective. IEEE Continuous Systems Magazine, Vol. 3, No. 2, 9-14 (1983).
-
(1983)
IEEE Continuous Systems Magazine
, vol.3
, Issue.2
, pp. 9-14
-
-
Vamos, T.1
-
21
-
-
0032202527
-
Reference architecture for holonic manufacturing systems: PROSA
-
Van Brussel, H., Jo, Wyns., Valckenaers, P., Bongaerts, L., Peeters, P.: Reference Architecture for Holonic Manufacturing Systems: PROSA. Computers in Industry, Vol. 37, 255-274 (1998).
-
(1998)
Computers in Industry
, vol.37
, pp. 255-274
-
-
Van Brussel, H.1
Jo, W.2
Valckenaers, P.3
Bongaerts, L.4
Peeters, P.5
-
22
-
-
0031100831
-
Short shop schedules
-
March-April
-
Williamson, D. P., Hall, L. A., Hoogeveen, J. A., Hurkens, C. A. J., Lenstra, J. K., Sev-astjanov, S. V., and Shmoys, D. B.: Short Shop Schedules. Operations Research, 45(2): 288-294, March-April (1997).
-
(1997)
Operations Research
, vol.45
, Issue.2
, pp. 288-294
-
-
Williamson, D.P.1
Hall, L.A.2
Hoogeveen, J.A.3
Hurkens, C.A.J.4
Lenstra, J.K.5
Sev-Astjanov, S.V.6
Shmoys, D.B.7
|