메뉴 건너뛰기




Volumn 15, Issue 1, 2002, Pages 295-300

The study and application of Gold Mine Integrated Automation System

Author keywords

CIPS; Grinding circuit; Intelligent control; Manufacturing execution system

Indexed keywords

AUTOMATION; ECONOMIC GEOLOGY; GOLD MINES; GRINDING (MACHINING); INTELLIGENT CONTROL; PLANNING;

EID: 84945573028     PISSN: 14746670     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.3182/20020721-6-es-1901.00051     Document Type: Conference Paper
Times cited : (1)

References (11)
  • 1
    • 6344221002 scopus 로고
    • The integrated production planning and scheduling system in kashima steel works
    • Belgium
    • Araif, O. (1995), The Integrated Production Planning and Scheduling System in Kashima Steel Works, Proceeding of IBM International Steel & Metals Conference, Belgium, P433-438.
    • (1995) Proceeding of IBM International Steel & Metals Conference , pp. 433-438
    • Araif, O.1
  • 2
    • 0032093568 scopus 로고    scopus 로고
    • Scheduling of a multi-product batch process in the chemical industry
    • Blomer, F. And H-O. Gunther (1998), Scheduling of a multi-product batch process in the chemical industry, Computer in Industry l. 36. No.3. P245-259
    • (1998) Computer in Industry , vol.36 , Issue.3 , pp. 245-259
    • Blomer, F.1    Gunther, H.-O.2
  • 4
    • 84946323222 scopus 로고
    • Purdue university, A reference model of computer integrated manufacturing from the viewpoint of industrial automation
    • CIM Reference model committee (1989), Purdue University, A reference model of computer integrated manufacturing from the viewpoint of industrial automation, Computer integrated manufacturing l. 2. No.2. P114-127
    • (1989) Computer Integrated Manufacturing , vol.2 , Issue.2 , pp. 114-127
  • 5
    • 0043109116 scopus 로고
    • CIM: Competitive edge in manufacturing
    • Gutschke and K. Mertins (1985), CIM: competitive edge in manufacturing, Robot. Computer. Integr. Manuf. l. 2, No.1, P25-32
    • (1985) Robot. Computer. Integr. Manuf. , vol.2 , Issue.1 , pp. 25-32
    • Gutschke1    Mertins, K.2
  • 7
    • 0030084179 scopus 로고    scopus 로고
    • Computer modeling of mineral processing equipment using fuzzy mathematics
    • KARR, C.L. and B. WECK (1996), Computer modeling of mineral processing equipment using fuzzy mathematics, Minerals Engineering, l. 9, No.2, P183-194
    • (1996) Minerals Engineering , vol.9 , Issue.2 , pp. 183-194
    • Karr, C.L.1    Weck, B.2
  • 8
    • 0742314579 scopus 로고
    • Calibrating computer models of mineral processing equipment using genetic algorithms
    • KARR, C.L. and D. YEAGER (1995), Calibrating computer models of mineral processing equipment using genetic algorithms, Minerals Engineering, l. 8, No.9, P989-998
    • (1995) Minerals Engineering , vol.8 , Issue.9 , pp. 989-998
    • Karr, C.L.1    Yeager, D.2
  • 9
    • 0012606520 scopus 로고
    • Consider computer integrated manufacturing for continuous process plants
    • Nair, P. K. (1992), Consider Computer Integrated Manufacturing for Continuous Process Plants, Chem Engineering Process, 88(11), P71-81
    • (1992) Chem Engineering Process , vol.88 , Issue.11 , pp. 71-81
    • Nair, P.K.1
  • 11
    • 0026759242 scopus 로고
    • Control of grinding circuits using phenomenological models
    • Niemi, A.J., R. Ylinen and V. Rasanen (1992), Control of grinding circuits using phenomenological models, Power Technology, 69 P47-52
    • (1992) Power Technology , vol.69 , pp. 47-52
    • Niemi, A.J.1    Ylinen, R.2    Rasanen, V.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.