-
1
-
-
75149127614
-
An integrated safety management with construction management using 4D CAD model
-
Benjaoran, V., and, Bhokha, S. (2010). " An integrated safety management with construction management using 4D CAD model." Saf. Sci., 48 (3), 395-403. SSCIEO 0925-7535 10.1016/j.ssci.2009.09.009
-
(2010)
Saf. Sci.
, vol.48
, Issue.3
, pp. 395-403
-
-
Benjaoran, V.1
Bhokha, S.2
-
2
-
-
0002349614
-
Algorithm for computer control of a digital plotter
-
Bresenham, J. E. (1965). " Algorithm for computer control of a digital plotter." IBM Syst. J., 4 (1), 25-30. IBMSA7 0018-8670 10.1147/sj.41.0025
-
(1965)
IBM Syst. J.
, vol.4
, Issue.1
, pp. 25-30
-
-
Bresenham, J.E.1
-
3
-
-
84857371050
-
A fast path planning method for single and dual crane erections
-
Chang, Y.-C., Hung, W.-H., and, Kang, S.-C. (2012). " A fast path planning method for single and dual crane erections." Autom. Constr., 22 (0), 468-480. AUCOES 0926-5805 10.1016/j.autcon.2011.11.006
-
(2012)
Autom. Constr.
, vol.22
, pp. 468-480
-
-
Chang, Y.-C.1
Hung, W.-H.2
Kang, S.-C.3
-
4
-
-
0037400797
-
Implementation of visualization as planning and scheduling tool in construction
-
Chau, K. W., Anson, M., and, Zhang, J. P. (2003). " Implementation of visualization as planning and scheduling tool in construction." Build. Environ., 38 (5), 713-719. BUSCBC 0360-1323 10.1016/S0360-1323(02)00239-1
-
(2003)
Build. Environ.
, vol.38
, Issue.5
, pp. 713-719
-
-
Chau, K.W.1
Anson, M.2
Zhang, J.P.3
-
5
-
-
14544269170
-
4D dynamic construction management and visualization software: 1. Development
-
Chau, K. W., Anson, M., and, Zhang, J. P. (2005). " 4D dynamic construction management and visualization software: 1. Development." Autom. Constr., 14 (4), 512-524. AUCOES 0926-5805 10.1016/j.autcon.2004.11.002
-
(2005)
Autom. Constr.
, vol.14
, Issue.4
, pp. 512-524
-
-
Chau, K.W.1
Anson, M.2
Zhang, J.P.3
-
6
-
-
84859557026
-
Automated trajectory and path planning analysis based on ultra wideband data
-
Cheng, T., Mantripragada, U., Teizer, J., and, Vela, P. (2012). " Automated trajectory and path planning analysis based on ultra wideband data." J. Comput. Civ. Eng., 10.1061/(ASCE)CP.1943-5487.0000115, 151-160. JCCEE5 0887-3801
-
(2012)
J. Comput. Civ. Eng.
, pp. 151-160
-
-
Cheng, T.1
Mantripragada, U.2
Teizer, J.3
Vela, P.4
-
7
-
-
33644893440
-
-
MIT Press, Cambridge, MA
-
Choset, H., et al. (2005). Principles of robot motion: Theory, algorithms, and implementations (intelligent robotics and autonomous agents), MIT Press, Cambridge, MA.
-
(2005)
Principles of Robot Motion: Theory, Algorithms, and Implementations (Intelligent Robotics and Autonomous Agents)
-
-
Choset, H.1
-
8
-
-
0037332758
-
Visualisation of a stockyard layout simulator "simStock": A case study in precast concrete products industry
-
Dawood, N., and, Marasini, R. (2003). " Visualisation of a stockyard layout simulator "SimStock": A case study in precast concrete products industry." Autom. Constr., 12 (2), 113-122. AUCOES 0926-5805 10.1016/S0926-5805(02)00044-4
-
(2003)
Autom. Constr.
, vol.12
, Issue.2
, pp. 113-122
-
-
Dawood, N.1
Marasini, R.2
-
9
-
-
0000977157
-
On curves of minimal length with a constraint on average curvature, and with prescribed initial and terminal positions and tangents
-
Dubins, L. E. (1957). " On curves of minimal length with a constraint on average curvature, and with prescribed initial and terminal positions and tangents." Am. J. Math., 79 (3), 497-516. AJMAAN 0002-9327 10.2307/2372560
-
(1957)
Am. J. Math.
, vol.79
, Issue.3
, pp. 497-516
-
-
Dubins, L.E.1
-
10
-
-
60449095441
-
Dynamic site layout planning using approximate dynamic programming
-
El-Rayes, K., and, Said, H. (2009). " Dynamic site layout planning using approximate dynamic programming." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(2009)23:2(119), 119-127. JCCEE5 0887-3801
-
(2009)
J. Comput. Civ. Eng.
, pp. 119-127
-
-
El-Rayes, K.1
Said, H.2
-
11
-
-
13944281386
-
Dynamic layout of construction temporary facilities considering safety
-
Elbeltagi, E., Hegazy, T., and, Eldosouky, A. (2004). " Dynamic layout of construction temporary facilities considering safety." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2004)130:4(534), 534-541. JCEMD4 0733-9364
-
(2004)
J. Constr. Eng. Manage.
, pp. 534-541
-
-
Elbeltagi, E.1
Hegazy, T.2
Eldosouky, A.3
-
12
-
-
84945120670
-
-
Institute of Labor, Occupational Safety and Health (ILOSH). Ministry of Labor, Taiwan (May 7, 2014)
-
Institute of Labor, Occupational Safety and Health (ILOSH). (2012). " Construction industry accidents knowledge platform." Ministry of Labor, Taiwan (http://www.ilosh.gov.tw:81/CIAKP/Statistics2.aspx) (May 7, 2014).
-
(2012)
Construction Industry Accidents Knowledge Platform
-
-
-
13
-
-
33744547057
-
Planning and visualization for automated robotic crane erection processes in construction
-
Kang, S., and, Miranda, E. (2006). " Planning and visualization for automated robotic crane erection processes in construction." Autom. Constr., 15 (4), 398-414. AUCOES 0926-5805 10.1016/j.autcon.2005.06.008
-
(2006)
Autom. Constr.
, vol.15
, Issue.4
, pp. 398-414
-
-
Kang, S.1
Miranda, E.2
-
14
-
-
45749134660
-
Computational methods for coordinating multiple construction cranes
-
Kang, S. C., and, Miranda, E. (2008). " Computational methods for coordinating multiple construction cranes." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(2008)22:4(252), 252-263. JCCEE5 0887-3801
-
(2008)
J. Comput. Civ. Eng.
, pp. 252-263
-
-
Kang, S.C.1
Miranda, E.2
-
15
-
-
16444365571
-
Construction robot path-planning for earthwork operations
-
Kim, S., Russell, J., and, Koo, K. (2003). " Construction robot path-planning for earthwork operations." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(2003)17:2(97), 97-104. JCCEE5 0887-3801
-
(2003)
J. Comput. Civ. Eng.
, pp. 97-104
-
-
Kim, S.1
Russell, J.2
Koo, K.3
-
16
-
-
0033726628
-
RRT-connect: An efficient approach to single-query path planning
-
IEEE, Piscataway, NJ
-
Kuffner, J., and, Lavalle, S. (2000). " RRT-connect: An efficient approach to single-query path planning." Proc., IEEE Int. Conf. on Robotics and Automation (ICRA), IEEE, Piscataway, NJ, 995-1001.
-
(2000)
Proc. IEEE Int. Conf. on Robotics and Automation (ICRA)
, pp. 995-1001
-
-
Kuffner, J.1
Lavalle, S.2
-
17
-
-
70349334592
-
Conjoining MMAS to GA to solve construction site layout planning problem
-
Lam, K. C., Ning, X., and, Lam, M. C. K. (2009). " Conjoining MMAS to GA to solve construction site layout planning problem." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2009)135:10(1049), 1049-1057. JCEMD4 0733-9364
-
(2009)
J. Constr. Eng. Manage.
, pp. 1049-1057
-
-
Lam, K.C.1
Ning, X.2
Lam, M.C.K.3
-
18
-
-
77952010176
-
-
Cambridge University Press, Cambridge, England
-
LaValle, S. M. (2006). Planning algorithms, Cambridge University Press, Cambridge, England.
-
(2006)
Planning Algorithms
-
-
LaValle, S.M.1
-
19
-
-
0032643392
-
Randomized kinodynamic planning
-
IEEE, Piscataway, NJ
-
LaValle, S. M., and, Kuffner, J. J., Jr. (1999). " Randomized kinodynamic planning." Proc., IEEE Int. Conf. on Robotics and Automation, IEEE, Piscataway, NJ, 473-479.
-
(1999)
Proc. IEEE Int. Conf. on Robotics and Automation
, pp. 473-479
-
-
LaValle, S.M.1
Kuffner, J.J.2
-
20
-
-
2042528491
-
Spatial model for path planning of multiple mobile construction robots
-
Lee, S., and, Adams, T. M. (2004). " Spatial model for path planning of multiple mobile construction robots." Comput. Aided Civ. Infrastruct. Eng., 19 (4), 231-245. 1093-9687 10.1111/mice.2004.19.issue-4
-
(2004)
Comput. Aided Civ. Infrastruct. Eng.
, vol.19
, Issue.4
, pp. 231-245
-
-
Lee, S.1
Adams, T.M.2
-
21
-
-
67949100453
-
Optimizing construction planning schedules by virtual prototyping enabled resource analysis
-
Li, H., Chan, N., Huang, T., Guo, H. L., Lu, W. S., and, Skitmore, M. (2009). " Optimizing construction planning schedules by virtual prototyping enabled resource analysis." Autom. Constr., 18 (7), 912-918. AUCOES 0926-5805 10.1016/j.autcon.2009.04.002
-
(2009)
Autom. Constr.
, vol.18
, Issue.7
, pp. 912-918
-
-
Li, H.1
Chan, N.2
Huang, T.3
Guo, H.L.4
Lu, W.S.5
Skitmore, M.6
-
22
-
-
84940435723
-
Accessibility evaluation system for site layout planning - A tractor trailer example
-
Lin, J. J.-C., Yang, C.-E., Hung, W.-H., and, Kang, S.-C. (2013). " Accessibility evaluation system for site layout planning-A tractor trailer example." Visual. Eng., 1 (1), 12.
-
(2013)
Visual. Eng.
, vol.1
, Issue.1
, pp. 12
-
-
Lin, J.J.-C.1
Yang, C.-E.2
Hung, W.-H.3
Kang, S.-C.4
-
23
-
-
13244275240
-
Application of 4D for dynamic site layout and management of construction projects
-
Ma, Z., and, Shen, Q. (2005). " Application of 4D for dynamic site layout and management of construction projects." Autom. Constr., 14 (3), 369-381. AUCOES 0926-5805 10.1016/j.autcon.2004.08.011
-
(2005)
Autom. Constr.
, vol.14
, Issue.3
, pp. 369-381
-
-
Ma, Z.1
Shen, Q.2
-
24
-
-
0142186028
-
Proposed genetic algorithms for construction site layout
-
Mawdesley, M. J., and, Al-Jibouri, S. H. (2003). " Proposed genetic algorithms for construction site layout." Eng. Appl. Artif. Intell., 16 (5-6), 501-509. EAAIE6 0952-1976 10.1016/j.engappai.2003.09.002
-
(2003)
Eng. Appl. Artif. Intell.
, vol.16
, Issue.56
, pp. 501-509
-
-
Mawdesley, M.J.1
Al-Jibouri, S.H.2
-
26
-
-
70449526183
-
Dynamic construction site layout planning using max-min ant system
-
Ning, X., Lam, K. C., and, Lam, M. C. K. (2010). " Dynamic construction site layout planning using max-min ant system." Autom. Constr., 19 (1), 55-65. AUCOES 0926-5805 10.1016/j.autcon.2009.09.002
-
(2010)
Autom. Constr.
, vol.19
, Issue.1
, pp. 55-65
-
-
Ning, X.1
Lam, K.C.2
Lam, M.C.K.3
-
28
-
-
0036838279
-
Automated path planning for mobile crane lifts
-
Reddy, H. R., and, Varghese, K. (2002). " Automated path planning for mobile crane lifts." Comput. Aided Civ. Infrastruct. Eng., 17 (6), 439-448. 1093-9687 10.1111/mice.2002.17.issue-6
-
(2002)
Comput. Aided Civ. Infrastruct. Eng.
, vol.17
, Issue.6
, pp. 439-448
-
-
Reddy, H.R.1
Varghese, K.2
-
29
-
-
0027758507
-
Flatness, motion planning and trailer systems
-
IEEE, Piscataway, NJ
-
Rouchon, P., Fliess, M., Levine, J., and, Martin, P. (1993). " Flatness, motion planning and trailer systems." Proc., IEEE Conf. on Decision and Control, IEEE, Piscataway, NJ, 2700-2705.
-
(1993)
Proc. IEEE Conf. on Decision and Control
, pp. 2700-2705
-
-
Rouchon, P.1
Fliess, M.2
Levine, J.3
Martin, P.4
-
30
-
-
30844450580
-
Computer-aided site layout planning
-
Sadeghpour, F., Moselhi, O., and, Alkass, S. T. (2006). " Computer-aided site layout planning." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2006)132:2(143), 143-151. JCEMD4 0733-9364
-
(2006)
J. Constr. Eng. Manage.
, pp. 143-151
-
-
Sadeghpour, F.1
Moselhi, O.2
Alkass, S.T.3
-
31
-
-
0036056235
-
Using a PRM planner to compare centralized and decoupled planning for multi-robot systems
-
IEEE, Piscataway, NJ
-
Sanchez, G., and, Latombe, J. C. (2002). " Using a PRM planner to compare centralized and decoupled planning for multi-robot systems." Proc., IEEE Int. Conf. on Robotics and Automation, IEEE, Piscataway, NJ, 2112-2119.
-
(2002)
Proc. IEEE Int. Conf. on Robotics and Automation
, pp. 2112-2119
-
-
Sanchez, G.1
Latombe, J.C.2
-
32
-
-
4344717496
-
A fuzzy based multi-objective path planning of construction sites
-
Soltani, A. R., and, Fernando, T. (2004). " A fuzzy based multi-objective path planning of construction sites." Autom. Constr., 13 (6), 717-734. AUCOES 0926-5805 10.1016/j.autcon.2004.04.012
-
(2004)
Autom. Constr.
, vol.13
, Issue.6
, pp. 717-734
-
-
Soltani, A.R.1
Fernando, T.2
-
33
-
-
0041427756
-
Path planning in construction sites: Performance evaluation of the Dijkstra, A∗, and GA search algorithms
-
Soltani, A. R., Tawfik, H., Goulermas, J. Y., and, Fernando, T. (2002). " Path planning in construction sites: performance evaluation of the Dijkstra, A∗, and GA search algorithms." Adv. Eng. Inf., 16 (4), 291-303. 1474-0346 10.1016/S1474-0346(03)00018-1
-
(2002)
Adv. Eng. Inf.
, vol.16
, Issue.4
, pp. 291-303
-
-
Soltani, A.R.1
Tawfik, H.2
Goulermas, J.Y.3
Fernando, T.4
-
34
-
-
35348874797
-
Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources
-
Teizer, J., Caldas, C., and, Haas, C. (2007). " Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2007)133:11(880), 880-888. JCEMD4 0733-9364
-
(2007)
J. Constr. Eng. Manage.
, pp. 880-888
-
-
Teizer, J.1
Caldas, C.2
Haas, C.3
-
35
-
-
0037332769
-
A virtual construction environment for preconstruction planning
-
Waly, A., and, Thabet, W. (2003). " A virtual construction environment for preconstruction planning." Autom. Constr., 12 (2), 139-154. AUCOES 0926-5805 10.1016/S0926-5805(02)00047-X
-
(2003)
Autom. Constr.
, vol.12
, Issue.2
, pp. 139-154
-
-
Waly, A.1
Thabet, W.2
-
36
-
-
77956845478
-
Comparison of using mixed-integer programming and genetic algorithms for construction site facility layout planning
-
Wong, C. K., Fung, I. W. H., and, Tam, C. M. (2010). " Comparison of using mixed-integer programming and genetic algorithms for construction site facility layout planning." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000214, 1116-1128. JCEMD4 0733-9364
-
(2010)
J. Constr. Eng. Manage.
, pp. 1116-1128
-
-
Wong, C.K.1
Fung, I.W.H.2
Tam, C.M.3
-
37
-
-
84862831470
-
Improving lifting motion planning and re-planning of cranes with consideration for safety and efficiency
-
Zhang, C., and, Hammad, A. (2012). " Improving lifting motion planning and re-planning of cranes with consideration for safety and efficiency." Adv. Eng. Inf., 26 (2), 396-410. 1474-0346 10.1016/j.aei.2012.01.003
-
(2012)
Adv. Eng. Inf.
, vol.26
, Issue.2
, pp. 396-410
-
-
Zhang, C.1
Hammad, A.2
-
38
-
-
70350157044
-
Collaborative multi-agent systems for construction equipment based on real-time field data capturing
-
Zhang, C., Hammad, A., and, Bahnassi, H. (2009). " Collaborative multi-agent systems for construction equipment based on real-time field data capturing." J. Inf. Technol. Constr. (ITcon), 14, 204-228. 1874-4753
-
(2009)
J. Inf. Technol. Constr. (ITcon)
, vol.14
, pp. 204-228
-
-
Zhang, C.1
Hammad, A.2
Bahnassi, H.3
-
39
-
-
79551684087
-
BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies
-
Zhang, J. P., and, Hu, Z. Z. (2011). " BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies." Autom. Constr., 20 (2), 155-166. AUCOES 0926-5805 10.1016/j.autcon.2010.09.013
-
(2011)
Autom. Constr.
, vol.20
, Issue.2
, pp. 155-166
-
-
Zhang, J.P.1
Hu, Z.Z.2
-
40
-
-
2342444431
-
Genetic algorithm for solving site layout problem with unequal-size and constrained facilities
-
Zouein, P. P., Harmanani, H., and, Hajar, A. (2002). " Genetic algorithm for solving site layout problem with unequal-size and constrained facilities." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(2002)16:2(143), 143-151. JCCEE5 0887-3801
-
(2002)
J. Comput. Civ. Eng.
, pp. 143-151
-
-
Zouein, P.P.1
Harmanani, H.2
Hajar, A.3
|