|
Volumn , Issue , 2008, Pages
|
Including thermal unit start-up costs in a long-term hydro-thermal scheduling model
|
Author keywords
Hydro thermal scheduling; Long term scheduling; Optimization; Start up costs
|
Indexed keywords
ALGORITHMS;
BINS;
LINEAR PROGRAMMING;
OPTIMIZATION;
SCHEDULING;
STOCHASTIC MODELS;
STOCHASTIC SYSTEMS;
SUPERCONDUCTING MATERIALS;
COORDINATED OPERATION;
HYDRO-THERMAL SCHEDULING;
HYDROTHERMAL SYSTEM;
LINEAR CONSTRAINTS;
LINEAR OPTIMIZATION;
MINIMUM GENERATIONS;
NORDIC POWER MARKETS;
START-UP COSTS;
COSTS;
|
EID: 84944031205
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (29)
|
References (6)
|