-
1
-
-
0025491424
-
On the utility of historical project statistics for cost and schedule estimation: Results from a simulation-based case study
-
T.K. Abdel-Hamid, "On the utility of historical project statistics for cost and schedule estimation: results from a simulation-based case study", Jnl of Sys. & Soft. 13, (1990): 71-82.
-
(1990)
Jnl of Sys. & Soft
, vol.13
, pp. 71-82
-
-
Abdel-Hamid, T.K.1
-
2
-
-
0027556524
-
Adapting, correcting, and perfecting software estimates: A maintenance metaphor
-
Mar
-
T.K. Abdel-Hamid, "Adapting, correcting, and perfecting software estimates: a maintenance metaphor", Computer (Mar 1993): 20-29.
-
(1993)
Computer
, pp. 20-29
-
-
Abdel-Hamid, T.K.1
-
3
-
-
0032753448
-
Improving risk management: Moving from risk elimination to risk avoidance
-
T.R. Adler, J.G. Leonard and R.K. Nordgren, "Improving risk management: moving from risk elimination to risk avoidance", Info. & Soft. Tech. 41, (1999): 29-34.
-
(1999)
Info. & Soft. Tech.
, vol.41
, pp. 29-34
-
-
Adler, T.R.1
Leonard, J.G.2
Nordgren, R.K.3
-
4
-
-
0008975535
-
Top management toolbox for managing corporate IT
-
N. Ahituv, M. Zviran and C. Glezer, "Top management toolbox for managing corporate IT", Comm. ACM 42(4), (1999): 93-99.
-
(1999)
Comm. ACM
, vol.42
, Issue.4
, pp. 93-99
-
-
Ahituv, N.1
Zviran, M.2
Glezer, C.3
-
5
-
-
3643071910
-
Across disciplines: Risk, design, method, process, and tools
-
Jul/Aug
-
R. Baines, "Across disciplines: risk, design, method, process, and tools", IEEE Software (Jul/Aug 1998): 61-64.
-
(1998)
IEEE Software
, pp. 61-64
-
-
Baines, R.1
-
6
-
-
38249012724
-
Successful experience of using function points to estimate project costs early in the life-cycle
-
R. Betteridge, "Successful experience of using function points to estimate project costs early in the life-cycle", Info. & Soft. Tech. 34(10), (1992): 655-658.
-
(1992)
Info. & Soft. Tech.
, vol.34
, Issue.10
, pp. 655-658
-
-
Betteridge, R.1
-
7
-
-
0001313920
-
Improving speed and productivity of software development: A global survey of software developers
-
J.D. Blackburn, G.D. Scudder and L.N. Van Wassenhove, "Improving speed and productivity of software development: a global survey of software developers", IEEE Trans. Soft. Eng. 22(12), (1996): 875-885.
-
(1996)
IEEE Trans. Soft. Eng.
, vol.22
, Issue.12
, pp. 875-885
-
-
Blackburn, J.D.1
Scudder, G.D.2
Van Wassenhove, L.N.3
-
8
-
-
0030194137
-
Industrial-strength management strategies
-
Jul
-
N. Brown, "Industrial-strength management strategies", IEEE Software (Jul 1996): 94-103.
-
(1996)
IEEE Software
, pp. 94-103
-
-
Brown, N.1
-
9
-
-
0042628343
-
Risk management may not be for everyone
-
May/Jun
-
M.J. Carr, "Risk management may not be for everyone", IEEE Software (May/Jun 1997): 21,24.
-
(1997)
IEEE Software
-
-
Carr, M.J.1
-
10
-
-
9444261789
-
CPM offers certificate in software estimating
-
Nov
-
J. Charles, "CPM offers certificate in software estimating", IEEE Software (Nov 1996): 104-105.
-
(1996)
IEEE Software
, pp. 104-105
-
-
Charles, J.1
-
11
-
-
0030190827
-
A defined process for project postmortem review
-
Jul
-
B. Collier, T. DeMarco and P. Fearey, "A defined process for project postmortem review", IEEE Software (Jul 1996): 65-72.
-
(1996)
IEEE Software
, pp. 65-72
-
-
Collier, B.1
DeMarco, T.2
Fearey, P.3
-
12
-
-
0031145733
-
Implementing risk management on software intensive projects
-
May/Jun
-
E.H. Conrow and P.S. Shishido, "Implementing risk management on software intensive projects", IEEE Software (May/Jun 1997): 83-89.
-
(1997)
IEEE Software
, pp. 83-89
-
-
Conrow, E.H.1
Shishido, P.S.2
-
14
-
-
50749135420
-
Software estimation is not a rational process
-
R.L. Glass, "Software estimation is not a rational process", Jnl of Sys. & Soft. 23, (1993): 1-2.
-
(1993)
Jnl of Sys. & Soft
, vol.23
, pp. 1-2
-
-
Glass, R.L.1
-
15
-
-
84995555715
-
Short-term and long-term remedies for runaway projects
-
R.L. Glass, "Short-term and long-term remedies for runaway projects", Comm. ACM 41(7), (1998): 13-15.
-
(1998)
Comm. ACM
, vol.41
, Issue.7
, pp. 13-15
-
-
Glass, R.L.1
-
16
-
-
0006738384
-
Software cost estimation
-
F.J. Heemstra, "Software cost estimation", Info. & Soft. Tech. 34(10), (1992): 627-639.
-
(1992)
Info. & Soft. Tech.
, vol.34
, Issue.10
, pp. 627-639
-
-
Heemstra, F.J.1
-
17
-
-
0346852782
-
Construction of an FPA-type metric for early lifecycle estimation
-
G. Horgan, S. Khaddaj and P. Forte, "Construction of an FPA-type metric for early lifecycle estimation", Info. & Soft. Tech. 40, (1998): 409-415.
-
(1998)
Info. & Soft. Tech.
, vol.40
, pp. 409-415
-
-
Horgan, G.1
Khaddaj, S.2
Forte, P.3
-
18
-
-
0031352466
-
A subjective effort estimation experiment
-
M. Höst and C. Wohlin, "A subjective effort estimation experiment", Info. & Soft. Tech. 39, (1997): 755-762.
-
(1997)
Info. & Soft. Tech.
, vol.39
, pp. 755-762
-
-
Höst, M.1
Wohlin, C.2
-
19
-
-
0035023813
-
Using public domain metrics to estimate software development effort
-
R. Jeffery, M. Ruhe, and I. Wieczorek, "Using public domain metrics to estimate software development effort", In Proc. 7th Intl Software Metrics Symposium. London, (2001): 16-27.
-
Proc. 7th Intl Software Metrics Symposium. London, (2001)
, pp. 16-27
-
-
Jeffery, R.1
Ruhe, M.2
Wieczorek, I.3
-
20
-
-
0035941443
-
Impact of effort estimates on software project work
-
M. Jørgensen and D.I.K. Sjøberg, "Impact of effort estimates on software project work", Info. & Soft. Tech. 43, (2001): 939-948.
-
(2001)
Info. & Soft. Tech.
, vol.43
, pp. 939-948
-
-
Jørgensen, M.1
Sjøberg, D.I.K.2
-
22
-
-
0024142182
-
A generic technique for developing a software sizing and effort estimation model
-
A. Kulkarni, J.B. Greenspan, D.A. Kriegman, J.J. Logan and T.D. Roth, "A generic technique for developing a software sizing and effort estimation model", In Proc. COMPSAC '88. (1988): 155-161.
-
Proc. COMPSAC '88. (1988)
, pp. 155-161
-
-
Kulkarni, A.1
Greenspan, J.B.2
Kriegman, D.A.3
Logan, J.J.4
Roth, T.D.5
-
23
-
-
0039333782
-
Information system cost estimating: A management perspective
-
June
-
A.L. Lederer, R. Mirani, B.S. Neo, C. Pollard, J. Prasad and K. Ramamurthy, "Information system cost estimating: a management perspective", MIS Quart. (June 1990): 159-176.
-
(1990)
MIS Quart
, pp. 159-176
-
-
Lederer, A.L.1
Mirani, R.2
Neo, B.S.3
Pollard, C.4
Prasad, J.5
Ramamurthy, K.6
-
24
-
-
0027593606
-
A structured methodology for software development effort prediction using the analytic hierarchy process
-
H. Lee, "A structured methodology for software development effort prediction using the analytic hierarchy process", Jnl of Sys. & Soft. 21, (1993): 179-186.
-
(1993)
Jnl of Sys. & Soft
, vol.21
, pp. 179-186
-
-
Lee, H.1
-
26
-
-
0031141366
-
Risk management is project management for adults
-
May/Jun
-
T. Lister, "Risk management is project management for adults", IEEE Software (May/Jun 1997): 20,22.
-
(1997)
IEEE Software
-
-
Lister, T.1
-
27
-
-
85008033400
-
Hallucinations at 37,000 feet
-
May/Jun
-
T. Lister, "Hallucinations at 37,000 feet", IEEE Software (May/Jun 1998): 105-107.
-
(1998)
IEEE Software
, pp. 105-107
-
-
Lister, T.1
-
28
-
-
0037845141
-
Combining techniques to optimize effort predictions in software project management
-
S.G. MacDonell and M.J. Shepperd, "Combining techniques to optimize effort predictions in software project management", Jnl of Sys. & Soft. 66(2): 91-98.
-
Jnl of Sys. & Soft
, vol.66
, Issue.2
, pp. 91-98
-
-
MacDonell, S.G.1
Shepperd, M.J.2
-
29
-
-
85008014355
-
Avoiding classic mistakes
-
Sept
-
S. McConnell, "Avoiding classic mistakes", IEEE Software (Sept 1996): 112, 111.
-
(1996)
IEEE Software
-
-
McConnell, S.1
-
31
-
-
21344469645
-
A contingency framework for the investigation of information systems failure
-
A. Poulymenakou and A. Holmes, "A contingency framework for the investigation of information systems failure", Eur. Jnl Info. Sys. 5, (1996): 34-46.
-
(1996)
Eur. Jnl Info. Sys
, vol.5
, pp. 34-46
-
-
Poulymenakou, A.1
Holmes, A.2
-
34
-
-
21744459875
-
System dynamics in software project management: Towards the development of a formal integrated framework
-
A.G. Rodrigues and T.M. Williams, "System dynamics in software project management: towards the development of a formal integrated framework", Eur. Jnl Info. Sys. 6, (1997): 51-66.
-
(1997)
Eur. Jnl Info. Sys
, vol.6
, pp. 51-66
-
-
Rodrigues, A.G.1
Williams, T.M.2
-
35
-
-
0035889328
-
Managing uncertainty in project portfolio cost estimation
-
I. Stamelos and L. Angelis, "Managing uncertainty in project portfolio cost estimation", Info. & Soft. Tech. 43, (2001): 759-768.
-
(2001)
Info. & Soft. Tech.
, vol.43
, pp. 759-768
-
-
Stamelos, I.1
Angelis, L.2
|