-
1
-
-
62549100854
-
Overview of planning and scheduling for enterprise-wide optimization of process industries
-
Grossmann I., Erdirik-Dogan M., Karuppiah R. Overview of planning and scheduling for enterprise-wide optimization of process industries. Automatisierungstechnik 2008, 56(2):64-79.
-
(2008)
Automatisierungstechnik
, vol.56
, Issue.2
, pp. 64-79
-
-
Grossmann, I.1
Erdirik-Dogan, M.2
Karuppiah, R.3
-
2
-
-
0442264226
-
Planning and scheduling in the process industry
-
Kallrath J. Planning and scheduling in the process industry. ORSpectrum 2002, 24(3):219-250.
-
(2002)
ORSpectrum
, vol.24
, Issue.3
, pp. 219-250
-
-
Kallrath, J.1
-
3
-
-
28244497735
-
Solving planning and design problems in the process industry using mixed integer and global optimization
-
Kallrath J. Solving planning and design problems in the process industry using mixed integer and global optimization. Ann. Oper. Res. 2005, 140(1):339-373.
-
(2005)
Ann. Oper. Res.
, vol.140
, Issue.1
, pp. 339-373
-
-
Kallrath, J.1
-
4
-
-
68049131455
-
Flexible design-planning of supply chain networks
-
Laínez J.M., Kopanos G., Espuña A., Puigjaner L. Flexible design-planning of supply chain networks. AIChE J. 2009, 55(7):1736-1753.
-
(2009)
AIChE J.
, vol.55
, Issue.7
, pp. 1736-1753
-
-
Laínez, J.M.1
Kopanos, G.2
Espuña, A.3
Puigjaner, L.4
-
5
-
-
84879910068
-
Considering environmental assessment in an ontological framework for enterprise sustainability
-
Muñoz E., Capon-García E., Laínez J.M., Espuña A., Puigjaner L. Considering environmental assessment in an ontological framework for enterprise sustainability. J.Clean. Prod. 2013, 47:149-164.
-
(2013)
J.Clean. Prod.
, vol.47
, pp. 149-164
-
-
Muñoz, E.1
Capon-García, E.2
Laínez, J.M.3
Espuña, A.4
Puigjaner, L.5
-
6
-
-
84881552772
-
Integration of enterprise levels based on an ontological framework
-
Muñoz E., Capon-García E., Laínez J.M., Espuña A., Puigjaner L. Integration of enterprise levels based on an ontological framework. Chem. Eng. Res. Des. 2013, 91(8):1542-1556.
-
(2013)
Chem. Eng. Res. Des.
, vol.91
, Issue.8
, pp. 1542-1556
-
-
Muñoz, E.1
Capon-García, E.2
Laínez, J.M.3
Espuña, A.4
Puigjaner, L.5
-
7
-
-
0037082299
-
Planning, scheduling and control systems:why cannot they work together
-
Shobrys D.E., White D.C. Planning, scheduling and control systems:why cannot they work together. Comput. Chem. Eng. 2002, 26(2):149-160.
-
(2002)
Comput. Chem. Eng.
, vol.26
, Issue.2
, pp. 149-160
-
-
Shobrys, D.E.1
White, D.C.2
-
8
-
-
80051667632
-
Process systems engineering: Fromsolvay to modern bio-and nanotechnology. a history of development, successesand prospects for the future
-
Stephanopoulos G., Reklaitis G.V. Process systems engineering: Fromsolvay to modern bio-and nanotechnology. a history of development, successesand prospects for the future. Chem. Eng. Sci. 2011, 66(19):4272-4306.
-
(2011)
Chem. Eng. Sci.
, vol.66
, Issue.19
, pp. 4272-4306
-
-
Stephanopoulos, G.1
Reklaitis, G.V.2
-
9
-
-
4143112202
-
Cyclic short-term scheduling of multiproduct batch plants using continuous-time representation
-
Wu D., Ierapetritou M. Cyclic short-term scheduling of multiproduct batch plants using continuous-time representation. Comput. Chem. Eng. 2004, 28(11):2271-2286.
-
(2004)
Comput. Chem. Eng.
, vol.28
, Issue.11
, pp. 2271-2286
-
-
Wu, D.1
Ierapetritou, M.2
|