Efficient heuristic algorithm for scheduling two-stage hybrid flowshop with sequence-dependent setup times

Author keywords

[No Author keywords available]

Indexed keywords

HEURISTIC ALGORITHMS; OPTIMIZATION; SCHEDULING; SCHEDULING ALGORITHMS;

EID: 84939165521     PISSN: 1024123X     EISSN: 15635147     Source Type: Journal    
DOI: 10.1155/2015/420308     Document Type: Article
Times cited : (12)

References (18)
  • 2
    • 84855493366 scopus 로고    scopus 로고
    • Asimulated annealing algorithmapproach to hybrid flowshop scheduling with sequence-dependent setup times
    • H. S. Mirsanei, M. Zandieh, M. J. Moayed, and M. R. Khabbazi, "Asimulated annealing algorithmapproach to hybrid flowshop scheduling with sequence-dependent setup times, " Journal of Intelligent Manufacturing, vol. 22, no. 6, pp. 965-978, 2011.
    • (2011) Journal of Intelligent Manufacturing , vol.22 , Issue.6 , pp. 965-978
    • Mirsanei, H.S.1    Zandieh, M.2    Moayed, M.J.3    Khabbazi, M.R.4
  • 3
    • 0141509086 scopus 로고    scopus 로고
    • A case study in a two-stage hybrid flow shop with setup time and dedicated machines
    • H.-T. Lin and C.-J. Liao, "A case study in a two-stage hybrid flow shop with setup time and dedicated machines, " International Journal of Production Economics, vol. 86, no. 2, pp. 133-143, 2003.
    • (2003) International Journal of Production Economics , vol.86 , Issue.2 , pp. 133-143
    • Lin, H.-T.1    Liao, C.-J.2
  • 4
    • 84874655297 scopus 로고    scopus 로고
    • Heuristics for scheduling a two-stage hybrid flow shop with parallel batching machines: Application at a hospital sterilisation plant
    • A. Rossi, A. Puppato, and M. Lanzetta, "Heuristics for scheduling a two-stage hybrid flow shop with parallel batching machines: application at a hospital sterilisation plant, " International Journal of Production Research, vol. 51, no. 8, pp. 2363-2376, 2013.
    • (2013) International Journal of Production Research , vol.51 , Issue.8 , pp. 2363-2376
    • Rossi, A.1    Puppato, A.2    Lanzetta, M.3
  • 5
    • 0023995996 scopus 로고
    • Two-stage, hybrid flowshop scheduling problem
    • J. N. D. Gupta, "Two-stage, hybrid flowshop scheduling problem, " Journal of the Operational Research Society, vol. 39, no. 4, pp. 359-364, 1988.
    • (1988) Journal of the Operational Research Society , vol.39 , Issue.4 , pp. 359-364
    • Gupta, J.N.D.1
  • 6
    • 2942674864 scopus 로고    scopus 로고
    • Scheduling flexible flow lines with sequence-dependent setup times
    • M. E. Kurz and R. G. Askin, "Scheduling flexible flow lines with sequence-dependent setup times, " European Journal of Operational Research, vol. 159, no. 1, pp. 66-82, 2004.
    • (2004) European Journal of Operational Research , vol.159 , Issue.1 , pp. 66-82
    • Kurz, M.E.1    Askin, R.G.2
  • 7
    • 33748321077 scopus 로고    scopus 로고
    • An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times
    • M. Zandieh, S. M. Fatemi Ghomi, and S. M. Moattar Husseini, "An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times, " Applied Mathematics and Computation, vol. 180, no. 1, pp. 111-127, 2006.
    • (2006) Applied Mathematics and Computation , vol.180 , Issue.1 , pp. 111-127
    • Zandieh, M.1    Fatemi Ghomi, S.M.2    Moattar Husseini, S.M.3
  • 8
    • 63449107983 scopus 로고    scopus 로고
    • Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness
    • B. Naderi, M. Zandieh, and V. Roshanaei, "Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness, " International Journal of AdvancedManufacturing Technology, vol. 41, no. 11-12, pp. 1186-1198, 2009.
    • (2009) International Journal of AdvancedManufacturing Technology , vol.41 , Issue.11-12 , pp. 1186-1198
    • Naderi, B.1    Zandieh, M.2    Roshanaei, V.3
  • 9
    • 31944447841 scopus 로고    scopus 로고
    • Path planning of automated optical inspection machines for PCB assembly systems
    • T.-H. Park, H.-J. Kim, and N. Kim, "Path planning of automated optical inspection machines for PCB assembly systems, " International Journal of Control, Automation and Systems, vol. 4, no. 1, pp. 96-104, 2006.
    • (2006) International Journal of Control, Automation and Systems , vol.4 , Issue.1 , pp. 96-104
    • Park, T.-H.1    Kim, H.-J.2    Kim, N.3
  • 10
    • 33748492325 scopus 로고    scopus 로고
    • Scheduling and lot sizing with sequence-dependent setup: A literature review
    • X. Zhu and W. E. Wilhelm, "Scheduling and lot sizing with sequence-dependent setup: a literature review, " IIE Transactions, vol. 38, no. 11, pp. 987-1007, 2006.
    • (2006) IIE Transactions , vol.38 , Issue.11 , pp. 987-1007
    • Zhu, X.1    Wilhelm, W.E.2
  • 12
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
    • M. Nawaz, E. E. Enscore Jr. , and I. Ham, "A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem, " Omega, vol. 11, no. 1, pp. 91-95, 1983.
    • (1983) Omega , vol.11 , Issue.1 , pp. 91-95
    • Nawaz, M.1    Enscore, E.E.2    Ham, I.3
  • 13
    • 85079333661 scopus 로고    scopus 로고
    • Heuristic algorithms for the path planning problem in three-dimensional automated optical inspection (AOI) machines
    • G.-C. Lee, S. Choi, D. Hong, and S.-H. Choi, "Heuristic algorithms for the path planning problem in three-dimensional automated optical inspection (AOI) machines, " International Journal of Control and Automation, vol. 6, no. 4, pp. 321-328, 2013.
    • (2013) International Journal of Control and Automation , vol.6 , Issue.4 , pp. 321-328
    • Lee, G.-C.1    Choi, S.2    Hong, D.3    Choi, S.-H.4
  • 14
    • 0003075019 scopus 로고
    • Optimal two-and three-stage production schedules with setup times included
    • S. M. Johnson, "Optimal two-and three-stage production schedules with setup times included, " Naval Research Logistics Quarterly, vol. 1, no. 1, pp. 61-68, 1954.
    • (1954) Naval Research Logistics Quarterly , vol.1 , Issue.1 , pp. 61-68
    • Johnson, S.M.1
  • 15
    • 51649107577 scopus 로고    scopus 로고
    • Johnsons rule, composite jobs and the relocation problem
    • T. C. E. Cheng and B. M. T. Lin, "Johnsons rule, composite jobs and the relocation problem, " European Journal of Operational Research, vol. 192, no. 3, pp. 1008-1013, 2009.
    • (2009) European Journal of Operational Research , vol.192 , Issue.3 , pp. 1008-1013
    • Cheng, T.C.E.1    Lin, B.M.T.2
  • 16
    • 49649122428 scopus 로고    scopus 로고
    • An improved iterated greedy algorithm for the no-wait flow shop scheduling problem with makespan criterion
    • Q.-K. Pan, L. Wang, and B.-H. Zhao, "An improved iterated greedy algorithm for the no-wait flow shop scheduling problem with makespan criterion, " International Journal of Advanced Manufacturing Technology, vol. 38, no. 7-8, pp. 778-786, 2008.
    • (2008) International Journal of Advanced Manufacturing Technology , vol.38 , Issue.7-8 , pp. 778-786
    • Pan, Q.-K.1    Wang, L.2    Zhao, B.-H.3
  • 17
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • S. Kirkpatrick, J. Gelatt, and M. P. Vecchi, "Optimization by simulated annealing, " Science, vol. 220, no. 4598, pp. 671-680, 1983.
    • (1983) Science , vol.220 , Issue.4598 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt, J.2    Vecchi, M.P.3
  • 18
    • 0024770085 scopus 로고
    • Optimization by simulated annealing: An experimental evaluation; Part I, graph partitioning
    • D. S. Johnson, C. R. Aragon, L. A. McGeoch, and C. Schevon, "Optimization by simulated annealing: an experimental evaluation; Part I, graph partitioning, " Operations Research, vol. 37, no. 6, pp. 865-892, 1989.
    • (1989) Operations Research , vol.37 , Issue.6 , pp. 865-892
    • Johnson, D.S.1    Aragon, C.R.2    McGeoch, L.A.3    Schevon, C.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.