메뉴 건너뛰기




Volumn 63, Issue 4, 2015, Pages 823-839

Production and inventory control for a make-to-stock/calibrate-to-order system with dedicated and shared resources

Author keywords

[No Author keywords available]

Indexed keywords

CALIBRATION; INVENTORY CONTROL; SENSITIVITY ANALYSIS;

EID: 84937876000     PISSN: 0030364X     EISSN: 15265463     Source Type: Journal    
DOI: 10.1287/opre.2015.1387     Document Type: Article
Times cited : (9)

References (23)
  • 1
    • 84861072891 scopus 로고    scopus 로고
    • Stochastic multi-item inventory systems with Markov-modulated demands and production quantity requirements
    • Atali A, Özer Ö (2005) Stochastic multi-item inventory systems with Markov-modulated demands and production quantity requirements. Probab. Engrg. Inform. Sci. 26(2) 263-293.
    • (2005) Probab. Engrg. Inform. Sci. , vol.26 , Issue.2 , pp. 263-293
    • Atali, A.1    Özer, Ö.2
  • 2
    • 0035322377 scopus 로고    scopus 로고
    • Capacitated multi-item inventory systems with random and seasonally fluctuating demands: Implications for postponement strategies
    • Aviv Y, Federgruen A (2001) Capacitated multi-item inventory systems with random and seasonally fluctuating demands: implications for postponement strategies. Management Sci. 47(4):512-531.
    • (2001) Management Sci. , vol.47 , Issue.4 , pp. 512-531
    • Aviv, Y.1    Federgruen, A.2
  • 3
    • 0029204648 scopus 로고
    • Application of perturbation analysis to multiproduct capacitated production-inventory control
    • IEEE, Piscataway, NJ
    • Bashyam S, Fu MC, Kaku BK (1995) Application of perturbation analysis to multiproduct capacitated production-inventory control. Proc. Amer. Control Conf., Vol. 3 (IEEE, Piscataway, NJ), 2170-2174.
    • (1995) Proc. Amer. Control Conf. , vol.3 , pp. 2170-2174
    • Bashyam, S.1    Fu, M.C.2    Kaku, B.K.3
  • 4
    • 14944376633 scopus 로고    scopus 로고
    • Managing flexible capacity in a make-to-order environment
    • Bish EK, Muriel A, Biller S (2005) Managing flexible capacity in a make-to-order environment. Management Sci. 51(2):167-180.
    • (2005) Management Sci. , vol.51 , Issue.2 , pp. 167-180
    • Bish, E.K.1    Muriel, A.2    Biller, S.3
  • 5
    • 11844299024 scopus 로고    scopus 로고
    • Managing inventory and supply performance in assembly systems with random supply capacity and demand
    • Bollapragada R, Rao US, Zhang J (2004) Managing inventory and supply performance in assembly systems with random supply capacity and demand. Management Sci. 50(12):1729-1743.
    • (2004) Management Sci. , vol.50 , Issue.12 , pp. 1729-1743
    • Bollapragada, R.1    Rao, U.S.2    Zhang, J.3
  • 6
    • 0001110481 scopus 로고
    • A periodic review, production planning model with uncertain capacity and uncertain demandoptimality of extended myopic policies
    • Ciarallo FW, Akella R, Morton TE (1994) A periodic review, production planning model with uncertain capacity and uncertain demandoptimality of extended myopic policies. Management Sci. 40(3):320-332.
    • (1994) Management Sci. , vol.40 , Issue.3 , pp. 320-332
    • Ciarallo, F.W.1    Akella, R.2    Morton, T.E.3
  • 7
    • 0000879068 scopus 로고
    • Optimal policies for a multi-echelon inventory problem
    • Clark AJ, Scarf H (1960) Optimal policies for a multi-echelon inventory problem. Management Sci. 6(4):475-490.
    • (1960) Management Sci. , vol.6 , Issue.4 , pp. 475-490
    • Clark, A.J.1    Scarf, H.2
  • 8
    • 0345548368 scopus 로고    scopus 로고
    • The effectiveness of several performance bounds for capacitated production, partial-order-service, assemble-to-order systems
    • Dayanik S, Song JS, Xu SH (2003) The effectiveness of several performance bounds for capacitated production, partial-order-service, assemble-to-order systems. Manufacturing Service Oper. Management 5(3):230-251.
    • (2003) Manufacturing Service Oper. Management , vol.5 , Issue.3 , pp. 230-251
    • Dayanik, S.1    Song, J.S.2    Xu, S.H.3
  • 9
    • 0034262740 scopus 로고    scopus 로고
    • Dynamic scheduling in a make-to-stock system: A partial characterization of optimal policies
    • De Vericourt F, Karaesmen F, Dallery Y (2000) Dynamic scheduling in a make-to-stock system: A partial characterization of optimal policies. Oper. Res. 48(5):811-819.
    • (2000) Oper. Res. , vol.48 , Issue.5 , pp. 811-819
    • De Vericourt, F.1    Karaesmen, F.2    Dallery, Y.3
  • 10
    • 0032115907 scopus 로고    scopus 로고
    • Optimal production and inventory policy for multiple products under resource constraints
    • DeCroix GA, Arreola-Risa A (1998) Optimal production and inventory policy for multiple products under resource constraints. Management Sci. 44(7):950-961.
    • (1998) Management Sci. , vol.44 , Issue.7 , pp. 950-961
    • DeCroix, G.A.1    Arreola-Risa, A.2
  • 11
    • 0031250898 scopus 로고    scopus 로고
    • Production quotas as bounds on interplant JIT contracts
    • Duenyas I, Hopp WJ, Bassok Y (1997) Production quotas as bounds on interplant JIT contracts. Management Sci. 43(10):1372-1386.
    • (1997) Management Sci. , vol.43 , Issue.10 , pp. 1372-1386
    • Duenyas, I.1    Hopp, W.J.2    Bassok, Y.3
  • 12
    • 0000086623 scopus 로고
    • Inventory control of a multiproduct system with a limited production resource
    • Evans RV (1967) Inventory control of a multiproduct system with a limited production resource. Naval Res. Logist. Quart. 14(2):173-184.
    • (1967) Naval Res. Logist. Quart. , vol.14 , Issue.2 , pp. 173-184
    • Evans, R.V.1
  • 13
    • 33847070855 scopus 로고    scopus 로고
    • Inventory and production decisions for an assemble-to-order system with uncertain demand and limited assembly capacity
    • Fu K, Hsu VN, Lee CY (2006) Inventory and production decisions for an assemble-to-order system with uncertain demand and limited assembly capacity. Oper. Res. 54(6):1137-1150.
    • (2006) Oper. Res. , vol.54 , Issue.6 , pp. 1137-1150
    • Fu, K.1    Hsu, V.N.2    Lee, C.Y.3
  • 14
    • 61349087410 scopus 로고    scopus 로고
    • Optimal joint inventory and trans-shipment control under uncertain capacity
    • Hu X, Duenyas I, Kapuscinski R (2008) Optimal joint inventory and trans-shipment control under uncertain capacity. Oper. Res. 56(4):881-897.
    • (2008) Oper. Res. , vol.56 , Issue.4 , pp. 881-897
    • Hu, X.1    Duenyas, I.2    Kapuscinski, R.3
  • 15
    • 73649122815 scopus 로고    scopus 로고
    • A decomposition approach for a class of capacitated serial systems
    • Janakiraman G, Muckstadt JA (2009) A decomposition approach for a class of capacitated serial systems. Oper. Res. 57(6):1384-1393.
    • (2009) Oper. Res. , vol.57 , Issue.6 , pp. 1384-1393
    • Janakiraman, G.1    Muckstadt, J.A.2
  • 17
    • 0021494395 scopus 로고
    • An efficient heuristic for the multi-item newsboy problem with a single constraint
    • Nahmias S, Schmidt CP (1984) An efficient heuristic for the multi-item newsboy problem with a single constraint. Naval Res. Logist. Quart. 31(3):463-474.
    • (1984) Naval Res. Logist. Quart. , vol.31 , Issue.3 , pp. 463-474
    • Nahmias, S.1    Schmidt, C.P.2
  • 18
    • 19644400801 scopus 로고    scopus 로고
    • Optimal policies for a capacitated two-echelon inventory system
    • Parker RP, Kapuscinski R (2004) Optimal policies for a capacitated two-echelon inventory system. Oper. Res. 52(5):739-755.
    • (2004) Oper. Res. , vol.52 , Issue.5 , pp. 739-755
    • Parker, R.P.1    Kapuscinski, R.2
  • 19
    • 38549167551 scopus 로고    scopus 로고
    • Note: A separation principle for a class of assemble-to-order systems with expediting
    • Plambeck EL, Ward AR (2007) Note: A separation principle for a class of assemble-to-order systems with expediting. Oper. Res. 55(3):603-609.
    • (2007) Oper. Res. , vol.55 , Issue.3 , pp. 603-609
    • Plambeck, E.L.1    Ward, A.R.2
  • 20
    • 19744371257 scopus 로고    scopus 로고
    • The optimality of hedging point policies for stochastic two-product flexible manufacturing systems
    • Shaoxiang C (2004) The optimality of hedging point policies for stochastic two-product flexible manufacturing systems. Oper. Res. 52(2):312-322.
    • (2004) Oper. Res. , vol.52 , Issue.2 , pp. 312-322
    • Shaoxiang, C.1
  • 21
    • 77950476024 scopus 로고    scopus 로고
    • Supply chain operations: Assemble-to-order systems
    • De Kok T, Graves S, eds. (North-Holland, Amsterdam)
    • Song JS, Zipkin P (2003) Supply chain operations: Assemble-to-order systems. De Kok T, Graves S, eds. Handbooks in Operations Research and Management Science, Vol. 30 (North-Holland, Amsterdam), 561-596.
    • (2003) Handbooks in Operations Research and Management Science , vol.30 , pp. 561-596
    • Song, J.S.1    Zipkin, P.2
  • 22
    • 0036768955 scopus 로고    scopus 로고
    • Newsvendor networks: Inventory management and capacity investment with discretionary activities
    • Van Mieghem JA, Rudi N (2002) Newsvendor networks: Inventory management and capacity investment with discretionary activities. Manufacturing Service Oper. Management 4(4):313-335.
    • (2002) Manufacturing Service Oper. Management , vol.4 , Issue.4 , pp. 313-335
    • Van Mieghem, J.A.1    Rudi, N.2
  • 23
    • 0000479145 scopus 로고
    • The status of mathematical inventory theory
    • Veinott AF (1966) The status of mathematical inventory theory. Management Sci. 745-777.
    • (1966) Management Sci. , pp. 745-777
    • Veinott, A.F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.