-
2
-
-
0012701447
-
Reducing travelling costs and player fatigue in the national basketball association
-
Bean, J.C., Birge, J.R.: Reducing Travelling Costs and Player Fatigue in the National Basketball Association. Interfaces 10/3 (1980) 98-102
-
(1980)
Interfaces
, vol.10
, Issue.3
, pp. 98-102
-
-
Bean, J.C.1
Birge, J.R.2
-
3
-
-
0001059092
-
Arc consistency for general constraint networks: Preliminary results
-
Nagoya, Aichi, Japan: International Joint Conference on Artificial Intelligence, Inc
-
Bessiére, C., Régin, J.C.: Arc Consistency for General Constraint Networks: Preliminary Results. In: Proceedings of the Fifteenth International Joint Conference on Artific ial Intelligence. Nagoya, Aichi, Japan: International Joint Conference on Artificial Intelligence, Inc. (1997) 398-404
-
(1997)
Proceedings of the Fifteenth International Joint Conference on Artific Ial Intelligence
, pp. 398-404
-
-
Bessiére, C.1
Régin, J.C.2
-
4
-
-
0000955244
-
An evolutionary tabu search algorithm and the nhl scheduling problem
-
Costa, D.: An Evolutionary Tabu Search Algorithm and the NHL Scheduling Problem. INFOR 33/3 (1995) 161-178
-
(1995)
INFOR
, vol.33
, Issue.3
, pp. 161-178
-
-
Costa, D.1
-
5
-
-
0003697647
-
-
CPLEX Optimization Tahoe, NV, Inc
-
CPLEX Optimization: Using the CPLEX©Callable Library. Tahoe, NV, Inc. (1995)
-
(1995)
Using the CPLEX©Callable Library
-
-
-
7
-
-
0142221941
-
Allocating games for the nhl using integer programming
-
Ferland J.A., Fleurent, C.: Allocating Games for the NHL Using Integer Programming. Operations Research 41/4 (1993) 649-654
-
(1993)
Operations Research
, vol.41
, Issue.4
, pp. 649-654
-
-
Ferland, J.A.1
Fleurent, C.2
-
8
-
-
0004215426
-
-
Boston MA Kluwer Academic Publishers
-
Glover, F., Laguna, M.: Tabu Search. Boston, MA: Kluwer Academic Publishers (1997)
-
(1997)
Tabu Search
-
-
Glover, F.1
Laguna, M.2
-
10
-
-
0034997736
-
Scheduling a major college basketball conference-revisited
-
To appear
-
Henz, M.: Scheduling a Major College Basketball Conference-Revisited. To appear in: Operations Research 49/1 (2001)
-
(2001)
Operations Research
, vol.49
, Issue.1
-
-
Henz, M.1
-
12
-
-
0031648234
-
Scheduling a major college basketball conference
-
Nemhauser, G.L., Trick, M.A.: Scheduling a Major College Basketball Conference. Operations Research 46/1 (1998) 1-8
-
(1998)
Operations Research
, vol.46
, Issue.1
, pp. 1-8
-
-
Nemhauser, G.L.1
Trick, M.A.2
-
13
-
-
0028567611
-
A filtering algorithm for constraints of difference in csps
-
Seattle, Washington: AAAI Press
-
Régin, J.C.: A Filtering Algorithm for Constraints of Difference in CSPs. In: Proceedings of the Twelfth National Conference on Artificial Intelligence, Vol. 1. Seattle, Washington: AAAI Press (1994) 362-367
-
(1994)
Proceedings of the Twelfth National Conference on Artificial Intelligence
, vol.1
, pp. 362-367
-
-
Régin, J.C.1
-
17
-
-
0032659479
-
Scheduling sport tournaments using constraint logic programming
-
Schaerf A. Scheduling Sport Tournaments Using Constraint Logic Programming Constraints 4/1 1999) 43-65
-
(1999)
Constraints
, vol.4
, Issue.1
, pp. 43-65
-
-
Schaerf, A.1
-
18
-
-
0345350770
-
Constructing timetables for sport competitions
-
Schreuder, J.A.M.: Constructing Timetables for Sport Competitions. Mathematical Programming Study 13 (1980) 58-67
-
(1980)
Mathematical Programming Study
, vol.13
, pp. 58-67
-
-
Schreuder, J.A.M.1
-
19
-
-
0028397467
-
Scheduling the australian state cricket season using simulated annealing
-
Terril, B.J., Willis, R.J.: Scheduling the Australian State Cricket Season Using Simulated Annealing. Journal of the Operational Research Society 45 /3 (1994) 276-280
-
(1994)
Journal of the Operational Research Society
, vol.45
, Issue.3
, pp. 276-280
-
-
Terril, B.J.1
Willis, R.J.2
-
21
-
-
85013523237
-
Geography, games and graphs
-
Werra (de), D.: Geography, Games and Graphs. Discrete Applied Mathematics 2 (1980) 327-337
-
(1980)
Discrete Applied Mathematics
, vol.2
, pp. 327-337
-
-
De, W.D.1
-
23
-
-
0028463957
-
Timetabling county cricket fixtures using a form of tabu search
-
Wright, M.: Timetabling County Cricket Fixtures Using a Form of Tabu Search. Journal of the Operational Research Society 45/ 7 (1994) 758-770
-
(1994)
Journal of the Operational Research Society
, vol.45
, Issue.7
, pp. 758-770
-
-
Wright, M.1
|