-
1
-
-
84927805881
-
Reservoir optimization in water resources: a review
-
Ahmad A., El-Shafie A., Razali S.F.M., Mohamad Z.S. Reservoir optimization in water resources: a review. Water Resour. Manage. 2014, 28(11):3391-3405.
-
(2014)
Water Resour. Manage.
, vol.28
, Issue.11
, pp. 3391-3405
-
-
Ahmad, A.1
El-Shafie, A.2
Razali, S.F.M.3
Mohamad, Z.S.4
-
2
-
-
33645841331
-
A probabilistic modeling system for assessing flood risks
-
Apel H., Thieken A.H., Merz B., Blöschl G. A probabilistic modeling system for assessing flood risks. Nat. Hazards 2006, 38(1-2):79-100.
-
(2006)
Nat. Hazards
, vol.38
, Issue.1-2
, pp. 79-100
-
-
Apel, H.1
Thieken, A.H.2
Merz, B.3
Blöschl, G.4
-
3
-
-
84879067302
-
Estimating the flood frequency distribution at seasonal and annual time scales
-
Baratti E., Montanari A., Castellarin A., Salinas J.L., Viglione A., Bezzi A. Estimating the flood frequency distribution at seasonal and annual time scales. Hydrol. Earth Syst. Sci. 2012, 16(12):4651-4660.
-
(2012)
Hydrol. Earth Syst. Sci.
, vol.16
, Issue.12
, pp. 4651-4660
-
-
Baratti, E.1
Montanari, A.2
Castellarin, A.3
Salinas, J.L.4
Viglione, A.5
Bezzi, A.6
-
4
-
-
0035367618
-
Solving nonlinear water management model using a combined genetic algorithm and linear programming approach
-
Cai X., Mckinney D., Lasdon L.S. Solving nonlinear water management model using a combined genetic algorithm and linear programming approach. Adv. Water Resour. 2001, 24(6):667-676.
-
(2001)
Adv. Water Resour.
, vol.24
, Issue.6
, pp. 667-676
-
-
Cai, X.1
Mckinney, D.2
Lasdon, L.S.3
-
5
-
-
22944478981
-
Optimizing the reservoir operating rule curves by genetic algorithms
-
Chang F., Chen L., Chang L. Optimizing the reservoir operating rule curves by genetic algorithms. Hydrol. Process. 2005, 19(11):2277-2289.
-
(2005)
Hydrol. Process.
, vol.19
, Issue.11
, pp. 2277-2289
-
-
Chang, F.1
Chen, L.2
Chang, L.3
-
6
-
-
79953229544
-
A new seasonal design flood method based on bivariate joint distribution of flood magnitude and date of occurrence
-
Chen L., Guo S., Yan B., Liu P., Fang B. A new seasonal design flood method based on bivariate joint distribution of flood magnitude and date of occurrence. Hydrol. Sci. J. 2010, 55(8):1264-1280.
-
(2010)
Hydrol. Sci. J.
, vol.55
, Issue.8
, pp. 1264-1280
-
-
Chen, L.1
Guo, S.2
Yan, B.3
Liu, P.4
Fang, B.5
-
7
-
-
84879385147
-
Expected shortage based pre-release strategy for reservoir flood control
-
Chou F., Wu C. Expected shortage based pre-release strategy for reservoir flood control. J. Hydrol. 2013, 514(497):1-14.
-
(2013)
J. Hydrol.
, vol.514
, Issue.497
, pp. 1-14
-
-
Chou, F.1
Wu, C.2
-
8
-
-
0036530772
-
A fast and elitist multiobjective genetic algorithm: NSGA-II
-
Deb K., Pratap A., Agarwal S., Meyarivan T. A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Trans. Evol. Comput. 2002, 6(2):182-197.
-
(2002)
IEEE Trans. Evol. Comput.
, vol.6
, Issue.2
, pp. 182-197
-
-
Deb, K.1
Pratap, A.2
Agarwal, S.3
Meyarivan, T.4
-
9
-
-
0042312489
-
Joint seasonal/annual flood frequency analysis
-
Durrans S.R., Eiffe M.A., Thomas W.O., Goranflo H.M. Joint seasonal/annual flood frequency analysis. J. Hydrol. Eng. 2003, 8(4):181-189.
-
(2003)
J. Hydrol. Eng.
, vol.8
, Issue.4
, pp. 181-189
-
-
Durrans, S.R.1
Eiffe, M.A.2
Thomas, W.O.3
Goranflo, H.M.4
-
10
-
-
10244229638
-
Reservoir flood forecasting and control system in China
-
Guo S., Zhang H., Chen H., Peng D., Liu P., Pang B. Reservoir flood forecasting and control system in China. Hydrol. Sci. J. 2004, 49(6):959-972.
-
(2004)
Hydrol. Sci. J.
, vol.49
, Issue.6
, pp. 959-972
-
-
Guo, S.1
Zhang, H.2
Chen, H.3
Peng, D.4
Liu, P.5
Pang, B.6
-
11
-
-
84911408081
-
Beyond optimality: multistakeholder robustness tradeoffs for regional water portfolio planning under deep uncertainty
-
Herman J.D., Zeff H.B., Reed P.M., Characklis G.W. Beyond optimality: multistakeholder robustness tradeoffs for regional water portfolio planning under deep uncertainty. Water Resour. Res. 2014, 50(10):7692-7713.
-
(2014)
Water Resour. Res.
, vol.50
, Issue.10
, pp. 7692-7713
-
-
Herman, J.D.1
Zeff, H.B.2
Reed, P.M.3
Characklis, G.W.4
-
12
-
-
84859108005
-
Many-objective de Novo water supply portfolio planning under deep uncertainty
-
Kasprzyk J.R., Reed P.M., Characklis G.W., Kirsch B.R. Many-objective de Novo water supply portfolio planning under deep uncertainty. Environ. Model. Soft. 2012, 34(6):87-104.
-
(2012)
Environ. Model. Soft.
, vol.34
, Issue.6
, pp. 87-104
-
-
Kasprzyk, J.R.1
Reed, P.M.2
Characklis, G.W.3
Kirsch, B.R.4
-
13
-
-
33745068015
-
Multi-reservoir system optimization in the Han River basin using multi-objective genetic algorithms
-
Kim T., Heo J.H., Jeong C.S. Multi-reservoir system optimization in the Han River basin using multi-objective genetic algorithms. Hydrol. Process. 2006, 20(9):2057-2075.
-
(2006)
Hydrol. Process.
, vol.20
, Issue.9
, pp. 2057-2075
-
-
Kim, T.1
Heo, J.H.2
Jeong, C.S.3
-
14
-
-
1542756535
-
Evaluation of the parameterization-simulation-optimization approach for the control of reservoir systems
-
Koutsoyiannis D., Economou A. Evaluation of the parameterization-simulation-optimization approach for the control of reservoir systems. Water Resour. Res. 2003, 39(6):1170. 10.1029/2003WR002148.
-
(2003)
Water Resour. Res.
, vol.39
, Issue.6
, pp. 1170
-
-
Koutsoyiannis, D.1
Economou, A.2
-
15
-
-
1842686887
-
Optimal operation of multi-reservoir systems: state-of-the-art review
-
Labadie J. Optimal operation of multi-reservoir systems: state-of-the-art review. J. Water Resour. Plan. Manage. 2004, 130(2):93-111.
-
(2004)
J. Water Resour. Plan. Manage.
, vol.130
, Issue.2
, pp. 93-111
-
-
Labadie, J.1
-
16
-
-
77956191833
-
Dynamic control of flood limited water level for reservoir operation by considering inflow uncertainty
-
Li X., Guo S., Liu P., Chen G. Dynamic control of flood limited water level for reservoir operation by considering inflow uncertainty. J. Hydrol. 2010, 391:124-132.
-
(2010)
J. Hydrol.
, vol.391
, pp. 124-132
-
-
Li, X.1
Guo, S.2
Liu, P.3
Chen, G.4
-
17
-
-
84881357049
-
Bivariate flood frequency analysis with historical information based on copula
-
Li T., Guo S., Chen L., Guo J. Bivariate flood frequency analysis with historical information based on copula. J. Hydrol. Eng. 2013, 18(8):1018-1030.
-
(2013)
J. Hydrol. Eng.
, vol.18
, Issue.8
, pp. 1018-1030
-
-
Li, T.1
Guo, S.2
Chen, L.3
Guo, J.4
-
18
-
-
84897574205
-
Identifying explicit formulation of operating rules for multi-reservoir systems using genetic programming
-
Li L., Liu P., Rheinheimer D.E., Deng C., Zhou Y. Identifying explicit formulation of operating rules for multi-reservoir systems using genetic programming. Water Resour. Manage. 2014, 28(6):1545-1565.
-
(2014)
Water Resour. Manage.
, vol.28
, Issue.6
, pp. 1545-1565
-
-
Li, L.1
Liu, P.2
Rheinheimer, D.E.3
Deng, C.4
Zhou, Y.5
-
19
-
-
84863115723
-
Deriving reservoir refill operating rules by using the proposed DPNS model
-
Liu P., Guo S., Xiong L., Li W., Zhang H. Deriving reservoir refill operating rules by using the proposed DPNS model. Water Resour. Manage. 2006, 20(3):337-357.
-
(2006)
Water Resour. Manage.
, vol.20
, Issue.3
, pp. 337-357
-
-
Liu, P.1
Guo, S.2
Xiong, L.3
Li, W.4
Zhang, H.5
-
20
-
-
45749144824
-
Optimal design of seasonal flood control water levels for the Three Gorges Reservoir
-
Liu P., Guo S., Li W. Optimal design of seasonal flood control water levels for the Three Gorges Reservoir. IAHS Publication 2008, 319:270-278.
-
(2008)
IAHS Publication
, vol.319
, pp. 270-278
-
-
Liu, P.1
Guo, S.2
Li, W.3
-
21
-
-
78649755000
-
Flood season segmentation based on the probability change-point analysis technique
-
Liu P., Guo S., Xiong L., Chen L. Flood season segmentation based on the probability change-point analysis technique. Hydrol. Sci. J. 2010, 55(4):540-554.
-
(2010)
Hydrol. Sci. J.
, vol.55
, Issue.4
, pp. 540-554
-
-
Liu, P.1
Guo, S.2
Xiong, L.3
Chen, L.4
-
22
-
-
80053458634
-
Derivation of aggregation-based joint operating rule curves for cascade hydropower reservoirs
-
Liu P., Guo S., Xu X., Chen J. Derivation of aggregation-based joint operating rule curves for cascade hydropower reservoirs. Water Resour. Manage. 2011, 25(13):3177-3200.
-
(2011)
Water Resour. Manage.
, vol.25
, Issue.13
, pp. 3177-3200
-
-
Liu, P.1
Guo, S.2
Xu, X.3
Chen, J.4
-
23
-
-
84899835246
-
Parameter uncertainty analysis of reservoir operating rules based on implicit stochastic optimization
-
Liu P., Li L., Chen G., Rheinheimer D.E. Parameter uncertainty analysis of reservoir operating rules based on implicit stochastic optimization. J. Hydrol. 2014, 514:102-113.
-
(2014)
J. Hydrol.
, vol.514
, pp. 102-113
-
-
Liu, P.1
Li, L.2
Chen, G.3
Rheinheimer, D.E.4
-
24
-
-
33845656550
-
-
UNESCO Publishing, Paris, France
-
Loucks D.P., van Beek E. Water Resources Systems Planning and Management: An Introduction to Methods, Models, and Applications 2005, UNESCO Publishing, Paris, France.
-
(2005)
Water Resources Systems Planning and Management: An Introduction to Methods, Models, and Applications
-
-
Loucks, D.P.1
van Beek, E.2
-
27
-
-
33947164707
-
Simulation and optimization modelling approach for operation of the Hoa Binh reservoir, Vietnam
-
Ngo L.L., Madsen H., Rosbjerg D. Simulation and optimization modelling approach for operation of the Hoa Binh reservoir, Vietnam. J. Hydrol. 2007, 336:269-281.
-
(2007)
J. Hydrol.
, vol.336
, pp. 269-281
-
-
Ngo, L.L.1
Madsen, H.2
Rosbjerg, D.3
-
28
-
-
0030618869
-
Operating rules for multi-reservoir systems
-
Oliveira R., Loucks D.P. Operating rules for multi-reservoir systems. Water Resour. Res. 1997, 33(4):839-852.
-
(1997)
Water Resour. Res.
, vol.33
, Issue.4
, pp. 839-852
-
-
Oliveira, R.1
Loucks, D.P.2
-
29
-
-
84925515504
-
Optimal design for flood limit water level of cascade reservoirs
-
Ouyang S., Zhou J., Li C., Liao X., Wang H. Optimal design for flood limit water level of cascade reservoirs. Water Resour. Manage. 2015, 29(2):445-457.
-
(2015)
Water Resour. Manage.
, vol.29
, Issue.2
, pp. 445-457
-
-
Ouyang, S.1
Zhou, J.2
Li, C.3
Liao, X.4
Wang, H.5
-
30
-
-
72149096776
-
Real-time management of a multipurpose water reservoir with a heteroscedastic inflow model
-
Pianosi F., Soncini-Sessa R. Real-time management of a multipurpose water reservoir with a heteroscedastic inflow model. Water Resour. Res. 2009, 45(10):W10430.
-
(2009)
Water Resour. Res.
, vol.45
, Issue.10
, pp. W10430
-
-
Pianosi, F.1
Soncini-Sessa, R.2
-
31
-
-
77952241017
-
Simulation-optimization modeling: a survey and potential application in reservoir systems operation
-
Rani D., Moreira M.M. Simulation-optimization modeling: a survey and potential application in reservoir systems operation. Water Resour. Manage. 2010, 24(6):1107-1138.
-
(2010)
Water Resour. Manage.
, vol.24
, Issue.6
, pp. 1107-1138
-
-
Rani, D.1
Moreira, M.M.2
-
32
-
-
0025700933
-
How to make a decision: the analytic hierarchy process
-
Saaty T.L. How to make a decision: the analytic hierarchy process. Eur. J. Oper. Res. 1990, 48(1):9-26.
-
(1990)
Eur. J. Oper. Res.
, vol.48
, Issue.1
, pp. 9-26
-
-
Saaty, T.L.1
-
33
-
-
19744380590
-
Frequency analysis of nonidentically distributed hydrologic flood data
-
Singh V.P., Wang S.X., Zhang L. Frequency analysis of nonidentically distributed hydrologic flood data. J. Hydrol. 2005, 307:175-195.
-
(2005)
J. Hydrol.
, vol.307
, pp. 175-195
-
-
Singh, V.P.1
Wang, S.X.2
Zhang, L.3
-
36
-
-
84915795116
-
Estimation of the distribution of annual runoff from climatic variables using copulas
-
Xiong L., Yu K., Gottschalk L. Estimation of the distribution of annual runoff from climatic variables using copulas. Water Resour. Res. 2014, 50(9):7134-7152.
-
(2014)
Water Resour. Res.
, vol.50
, Issue.9
, pp. 7134-7152
-
-
Xiong, L.1
Yu, K.2
Gottschalk, L.3
-
37
-
-
0022268780
-
Reservoir management and operations models: a state-of-the-art review
-
Yeh W.W.G. Reservoir management and operations models: a state-of-the-art review. Water Resour. Res. 1985, 21(12):1797-1818.
-
(1985)
Water Resour. Res.
, vol.21
, Issue.12
, pp. 1797-1818
-
-
Yeh, W.W.G.1
-
38
-
-
43449129442
-
Multiple duration limited water level and dynamic limited water level for flood control, with implication on water supply
-
Yun R., Singh V.P. Multiple duration limited water level and dynamic limited water level for flood control, with implication on water supply. J. Hydrol. 2008, 354(1-4):160-170.
-
(2008)
J. Hydrol.
, vol.354
, Issue.1-4
, pp. 160-170
-
-
Yun, R.1
Singh, V.P.2
-
39
-
-
79952189882
-
Effect of streamflow forecast uncertainty on real-time reservoir operation
-
Zhao T., Cai X., Yang D. Effect of streamflow forecast uncertainty on real-time reservoir operation. Adv. Water Resour. 2011, 34(4):495-504.
-
(2011)
Adv. Water Resour.
, vol.34
, Issue.4
, pp. 495-504
-
-
Zhao, T.1
Cai, X.2
Yang, D.3
-
40
-
-
84902553394
-
Risk analysis for flood control operation of seasonal flood-limited water level incorporating inflow forecasting error
-
Zhou Y., Guo S. Risk analysis for flood control operation of seasonal flood-limited water level incorporating inflow forecasting error. Hydrol. Sci. J. 2014, 59(5):1006-1019.
-
(2014)
Hydrol. Sci. J.
, vol.59
, Issue.5
, pp. 1006-1019
-
-
Zhou, Y.1
Guo, S.2
-
41
-
-
84892873549
-
Optimization of water diversion based on reservoir operating rules: analysis of the Biliu River Reservoir, China
-
Zhu X., Zhang C., Yin J., Zhou H., Jiang Y. Optimization of water diversion based on reservoir operating rules: analysis of the Biliu River Reservoir, China. J. Hydrol. Eng. 2014, 19(2):411-421.
-
(2014)
J. Hydrol. Eng.
, vol.19
, Issue.2
, pp. 411-421
-
-
Zhu, X.1
Zhang, C.2
Yin, J.3
Zhou, H.4
Jiang, Y.5
|