메뉴 건너뛰기




Volumn 47, Issue 2, 2015, Pages 187-195

Identification of human-induced initiating events in the low power and shutdown operation using the commission error search and assessment method

Author keywords

Category B action; HRA; Human induced initiating event; Low power and shutdown

Indexed keywords


EID: 84926333048     PISSN: 17385733     EISSN: 2234358X     Source Type: Journal    
DOI: 10.1016/j.net.2014.12.006     Document Type: Article
Times cited : (19)

References (12)
  • 7
    • 84866269057 scopus 로고    scopus 로고
    • A pilot study for errors of commission for a boiling water reactor using the CESA method
    • L. Podofillini, V.N. Dang, O. Nusbaumer, D. Dres, A pilot study for errors of commission for a boiling water reactor using the CESA method, Reliab. Eng. Syst. Saf. 109 (2013) 86-98.
    • (2013) Reliab. Eng. Syst. Saf , vol.109 , pp. 86-98
    • Podofillini, L.1    Dang, V.N.2    Nusbaumer, O.3    Dres, D.4
  • 9
    • 37249005754 scopus 로고    scopus 로고
    • POS Definition and Transition Risk Modeling Guidance
    • C. Rochon, D. Finnicum, POS Definition and Transition Risk Modeling Guidance, ASME 2007 Power Conference, 2007, pp. 211-220.
    • (2007) ASME 2007 Power Conference , pp. 211-220
    • Rochon, C.1    Finnicum, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.