메뉴 건너뛰기




Volumn 21, Issue 2, 2015, Pages 137-149

Validation of vertical ground heat exchanger design methodologies

Author keywords

[No Author keywords available]

Indexed keywords


EID: 84925451630     PISSN: 23744731     EISSN: 2374474X     Source Type: Journal    
DOI: 10.1080/10789669.2014.974478     Document Type: Article
Times cited : (52)

References (31)
  • 1
    • 84863422022 scopus 로고    scopus 로고
    • ASHRAE, Chapter 34, “Geothermal Energy.” Atlanta: ASHRAE
    • ASHRAE. 2011 ASHRAE Handbook—HVAC Applications. Chapter 34, “Geothermal Energy.” Atlanta: ASHRAE.
    • (2011) ASHRAE Handbook—HVAC Applications
  • 3
    • 77958482787 scopus 로고    scopus 로고
    • Long-term ground temperature changes in geo-exchange systems
    • Bernier, M.A., A. Chahla, and P. Pinel. 2008 Long-term ground temperature changes in geo-exchange systems. ASHRAE Transactions 114(2):342–50
    • (2008) ASHRAE Transactions , vol.114 , Issue.2 , pp. 342-350
    • Bernier, M.A.1    Chahla, A.2    Pinel, P.3
  • 4
    • 84870588520 scopus 로고    scopus 로고
    • Design of borehole heat exchanger for ground-source heat pumps: A literature review, methodology comparison and analysis on the penalty temperature
    • Capozza, A., M. De Carli, and A. Zarrella. 2012 Design of borehole heat exchanger for ground-source heat pumps: A literature review, methodology comparison and analysis on the penalty temperature. Energy and Buildings 55:369–79
    • (2012) Energy and Buildings , vol.55 , pp. 369-379
    • Capozza, A.1    De Carli, M.2    Zarrella, A.3
  • 5
    • 84861622508 scopus 로고    scopus 로고
    • Multipolemethod to calculate borehole thermal resistances in a borehole heat exchanger
    • Claesson, J., and G. Hellström. 2011 Multipolemethod to calculate borehole thermal resistances in a borehole heat exchanger. HVAC&R Research 17(6):895–911
    • (2011) Hvac&Amp;R Research , vol.17 , Issue.6 , pp. 895-911
    • Claesson, J.1    Hellström, G.2
  • 7
    • 84893394475 scopus 로고    scopus 로고
    • Preliminary investigation of the effect of horizontal piping on the performance of a vertical ground heat exchanger system
    • Cullin, J.R., E. Lee, amd J.D. Spitler. 2013 Preliminary investigation of the effect of horizontal piping on the performance of a vertical ground heat exchanger system. ASHRAE Transactions 119(2):302–11
    • (2013) ASHRAE Transactions , vol.119 , Issue.2 , pp. 302-311
    • Cullin, J.R.1    Lee, E.2    Spitler, A.J.3
  • 8
    • 84925400175 scopus 로고    scopus 로고
    • Experimental validation of ground heat exchanger design methodologies using real monitored data
    • Cullin, J.R., C. Montagud, F. Ruiz-Calvo, and J.D. Spitler. 2014 Experimental validation of ground heat exchanger design methodologies using real monitored data. ASHRAE Transactions 120(2):pages pending.
    • (2014) ASHRAE Transactions , vol.120 , Issue.2
    • Cullin, J.R.1    Montagud, C.2    Ruiz-Calvo, F.3    Spitler, J.D.4
  • 9
    • 79955998410 scopus 로고    scopus 로고
    • A computationally efficient hybrid time step methodology for simulation of ground heat exchangers
    • Cullin, J.R., and J.D. Spitler. 2011 A computationally efficient hybrid time step methodology for simulation of ground heat exchangers. Geothermics 40(2):144–56
    • (2011) Geothermics , vol.40 , Issue.2 , pp. 144-156
    • Cullin, J.R.1    Spitler, J.D.2
  • 10
    • 0003887997 scopus 로고
    • Thermal analysis of heat extraction boreholes
    • Lund University, Sweden
    • Eskilson, P. 1987 Thermal analysis of heat extraction boreholes. Doctoral Thesis, Lund University, Sweden.
    • (1987) Doctoral Thesis
    • Eskilson, P.1
  • 11
    • 33746469117 scopus 로고    scopus 로고
    • Implementation and validation of ground-source heat pump system models in an integrated building and system simulation environment
    • Fisher, D.E., A. Murugappan, S.K. Padhmanabhan, and S.J. Rees. 2006 Implementation and validation of ground-source heat pump system models in an integrated building and system simulation environment. HVAC&R Research 12(3a):693–710
    • (2006) Hvac&Amp;R Research , vol.12 , Issue.3 , pp. 693-710
    • Fisher, D.E.1    Murugappan, A.2    Padhmanabhan, S.K.3    Rees, S.J.4
  • 12
    • 79953730749 scopus 로고    scopus 로고
    • The temperature penalty approach to the design of borehole heat exchanger for heat pump applications
    • Fossa, M. 2011 The temperature penalty approach to the design of borehole heat exchanger for heat pump applications. Energy and Buildings 43(6):1473–9
    • (2011) Energy and Buildings , vol.43 , Issue.6 , pp. 1473-1479
    • Fossa, M.1
  • 14
    • 33746404341 scopus 로고    scopus 로고
    • Design of an experimental facility for hybrid ground source heat pump systems. MS Thesis
    • Stillwater, OK
    • Hern, S. 2004 Design of an experimental facility for hybrid ground source heat pump systems. MS Thesis, Oklahoma State University, Stillwater, OK.
    • (2004) Oklahoma State University
    • Hern, S.1
  • 15
    • 0029489615 scopus 로고
    • A design method for commercial ground-coupled heat pumps
    • Kavanaugh, S.P. 1995 A design method for commercial ground-coupled heat pumps. ASHRAE Transactions 101(2):1088–94
    • (1995) ASHRAE Transactions , vol.101 , Issue.2 , pp. 1088-1094
    • Kavanaugh, S.P.1
  • 16
    • 0002640729 scopus 로고    scopus 로고
    • Ground-source heat pumps: Design of geothermal systems for commercial and industrial buildings
    • Kavanaugh, S.P., and K. Rafferty. 1997 Ground-source heat pumps: Design of geothermal systems for commercial and industrial buildings. Chapters 3–4, pp. 22–51
    • (1997) Chapters , vol.34 , pp. 22-51
    • Kavanaugh, S.P.1    Rafferty, K.2
  • 17
    • 84940413652 scopus 로고    scopus 로고
    • Atlanta: ASHRAE.
    • Atlanta: ASHRAE.
  • 18
    • 84862182819 scopus 로고    scopus 로고
    • Effect of borehole array geometry and thermal interferences on ground source heat pump system
    • Kurevija, T., D. Vulin, and V. Krapec. 2012 Effect of borehole array geometry and thermal interferences on ground source heat pump system. Energy Conversion and Management 60:134–42
    • (2012) Energy Conversion and Management , vol.60 , pp. 134-142
    • Kurevija, T.1    Vulin, D.2    Krapec, V.3
  • 19
    • 77949295990 scopus 로고    scopus 로고
    • Enhancements of an integrated simulation tool for ground-source heat pump system design and energy analysis
    • Pomona NJ
    • Liu, X., and G. Hellström. 2006 Enhancements of an integrated simulation tool for ground-source heat pump system design and energy analysis. Proceedings of Ecostock 2006, Pomona NJ.
    • (2006) Proceedings of Ecostock 2006
    • Liu, X.1    Hellström, G.2
  • 20
    • 80755163483 scopus 로고    scopus 로고
    • Analysis of the energy performance of a ground source heat pump system after five years of operation
    • Montagud, C., J.M. Corberán, Á. Montero, and J.F. Urchueguía. 2011 Analysis of the energy performance of a ground source heat pump system after five years of operation. Energy and Buildings 43:3618–26
    • (2011) Energy and Buildings , vol.43 , pp. 3618-3626
    • Montagud, C.1    Corberán, J.M.2    Montero, Á.3    Urchueguía, J.F.4
  • 21
    • 84940380297 scopus 로고    scopus 로고
    • Monitoring and performance analysis of large non-domestic ground source heat pump installation
    • Leicester, UK, September
    • Naicker, S.S., and S.J. Rees. 2011 Monitoring and performance analysis of large non-domestic ground source heat pump installation. Proceedings of 2011 CIBSE Technical Symposium, Leicester, UK, September 6–7
    • (2011) Proceedings of 2011 CIBSE Technical Symposium , pp. 6-7
    • Naicker, S.S.1    Rees, S.J.2
  • 22
    • 85006566923 scopus 로고    scopus 로고
    • A living laboratory: ASHRAE’s renovated headquarters
    • Parsons, B. 2008 A living laboratory: ASHRAE’s renovated headquarters. Canadian Consuting Engineer 49(7):31–3
    • (2008) Canadian Consuting Engineer , vol.49 , Issue.7 , pp. 31-33
    • Parsons, B.1
  • 23
    • 0003413445 scopus 로고    scopus 로고
    • The effect of grout thermal conductivity on vertical geothermal heat exchanger design and performance
    • South Dakota State University, Brookings, SD
    • Paul, N.D. 1996 The effect of grout thermal conductivity on vertical geothermal heat exchanger design and performance. MS Thesis, South Dakota State University, Brookings, SD.
    • (1996) MS Thesis
    • Paul, N.D.1
  • 24
    • 77958508507 scopus 로고    scopus 로고
    • Sizing calculation spreadsheet: Vertical geothermal borefields
    • Philippe, M., M. Bernier, and D. Marchio. 2010 Sizing calculation spreadsheet: Vertical geothermal borefields. ASHRAE Journal 52(7):20–8
    • (2010) ASHRAE Journal , vol.52 , Issue.7 , pp. 20-28
    • Philippe, M.1    Bernier, M.2    Marchio, D.3
  • 25
    • 0033701370 scopus 로고    scopus 로고
    • A comparison of vertical ground heat exchanger software for commercial applications
    • Shonder, J.A., V. Baxter, J. Thornton, and P. Hughes. 2000 A comparison of vertical ground heat exchanger software for commercial applications. ASHRAE Transactions 106(1):831–42
    • (2000) ASHRAE Transactions , vol.106 , Issue.1 , pp. 831-842
    • Shonder, J.A.1    Baxter, V.2    Thornton, J.3    Hughes, P.4
  • 28
    • 84940413653 scopus 로고    scopus 로고
    • The sizing of borehole heat exchangers for ground source heat pumps: A comparison between tow methods. Master’s thesis
    • Staiti,M, Milan, Italy
    • Staiti,M. 2014 The sizing of borehole heat exchangers for ground source heat pumps: A comparison between tow methods. Master’s thesis, Politecnico di Milano, Milan, Italy.
    • (2014) Politecnico Di Milano
  • 29
    • 34248524394 scopus 로고    scopus 로고
    • Analysis of vertical ground loop heat exchangers applied to buildings in the UK. Building Service Engineering
    • Underwood, C.P., and J.D. Spitler. 2007 Analysis of vertical ground loop heat exchangers applied to buildings in the UK. Building Service Engineering, Research and Technology 28:133–59
    • (2007) Research and Technology , vol.28 , pp. 133-159
    • Underwood, C.P.1    Spitler, J.D.2
  • 31
    • 0034825490 scopus 로고    scopus 로고
    • Field validation of a short timestep model for vertical ground loop heat exchangers
    • Yavuzturk, C., and J.D. Spitler. 2001 Field validation of a short timestep model for vertical ground loop heat exchangers. ASHRAE Transactions 107(1):617–25
    • (2001) ASHRAE Transactions , vol.107 , Issue.1 , pp. 617-625
    • Yavuzturk, C.1    Spitler, J.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.