메뉴 건너뛰기




Volumn 21, Issue 6, 2014, Pages 967-1002

The challenges of lean manufacturing implementation in SMEs

Author keywords

Lean implementation; Lean process; Lean production; Manufacturing strategy; Small to medium sized enterprises; Sme

Indexed keywords


EID: 84924456923     PISSN: 14635771     EISSN: None     Source Type: Journal    
DOI: 10.1108/BIJ-10-2012-0065     Document Type: Article
Times cited : (101)

References (39)
  • 1
  • 3
    • 0038451291 scopus 로고    scopus 로고
    • Leaning the right way
    • Alavi, S. (2003), “Leaning the right way”, Manufacturing Engineer, Vol. 82 No. 3, pp. 32-35.
    • (2003) Manufacturing Engineer , vol.82 , Issue.3 , pp. 32-35
    • Alavi, S.1
  • 4
    • 84876584313 scopus 로고    scopus 로고
    • Measuring the leanness of an organization
    • Bhasin, S. (2011), “Measuring the leanness of an organization”, International Journal of Lean Six Sigma, Vol. 2 No. 1, pp. 55-74.
    • (2011) International Journal of Lean Six Sigma , vol.2 , Issue.1 , pp. 55-74
    • Bhasin, S.1
  • 7
    • 0036035970 scopus 로고    scopus 로고
    • Is ‘lean a universal production system?: Batch production in the automotive industry”
    • Cooney, R. (2002), “Is ‘lean’ a universal production system?: batch production in the automotive industry”, International Journal of Operations & Production Management, Vol. 22 No. 10, pp. 1130-1147.
    • (2002) International Journal of Operations &Amp; Production Management , vol.22 , Issue.10 , pp. 1130-1147
    • Cooney, R.1
  • 8
    • 0002023293 scopus 로고
    • The limits of ‘lean
    • Cusumano, M.A. (1994), “The limits of ‘lean’”, Sloan Management Review, Vol. 35 No. 4, pp. 27-35.
    • (1994) Sloan Management Review , vol.35 , Issue.4 , pp. 27-35
    • Cusumano, M.A.1
  • 9
    • 33746227534 scopus 로고    scopus 로고
    • A benchmarking implementation framework for automotive manufacturing SMEs
    • Deros, B.M., Yusof, S.M. and Salleh, A.M. (2006), “A benchmarking implementation framework for automotive manufacturing SMEs”, Benchmarking: An International Journal, Vol. 13 No. 4, pp. 396-430.
    • (2006) Benchmarking: An International Journal , vol.13 , Issue.4 , pp. 396-430
    • Deros, B.M.1    Yusof, S.M.2    Salleh, A.M.3
  • 10
    • 77955430391 scopus 로고    scopus 로고
    • Adaptive configuration of a lean production system in small and medium-sized enterprises
    • Dombrowski, U., Crespo, I. and Zahn, T. (2010), “Adaptive configuration of a lean production system in small and medium-sized enterprises”, Production Engineering, Vol. 4 No. 4, pp. 341-348.
    • (2010) Production Engineering , vol.4 , Issue.4 , pp. 341-348
    • Dombrowski, U.1    Crespo, I.2    Zahn, T.3
  • 12
    • 0001073758 scopus 로고
    • Building theories from case study research
    • Eisenhardt, K.M. (1989), “Building theories from case study research”, Academy of Management Review, Vol. 14 No. 2, pp. 532-550.
    • (1989) Academy of Management Review , vol.14 , Issue.2 , pp. 532-550
    • Eisenhardt, K.M.1
  • 15
    • 18844413548 scopus 로고    scopus 로고
    • The role of SMEs in improving the competitive position of the European Union
    • Floyd, D. and McManus, J. (2005), “The role of SMEs in improving the competitive position of the European Union”, European Business Review, Vol. 17 No. 2, pp. 144-150.
    • (2005) European Business Review , vol.17 , Issue.2 , pp. 144-150
    • Floyd, D.1    McManus, J.2
  • 18
    • 70349556109 scopus 로고    scopus 로고
    • Application of benchmarking for assessing the lean manufacturing implementation
    • Gurumurthy, A. and Kodali, R. (2009), “Application of benchmarking for assessing the lean manufacturing implementation”, Benchmarking: An International Journal, Vol. 16 No. 2, pp. 274-308.
    • (2009) Benchmarking: An International Journal , vol.16 , Issue.2 , pp. 274-308
    • Gurumurthy, A.1    Kodali, R.2
  • 19
    • 0032099751 scopus 로고    scopus 로고
    • Lean implementation problems
    • Hancock, W.M. and Zayko, M.J. (1998), “Lean implementation problems”, IIE Solutions, Vol. 30 No. 6, pp. 38-42.
    • (1998) IIE Solutions , vol.30 , Issue.6 , pp. 38-42
    • Hancock, W.M.1    Zayko, M.J.2
  • 26
    • 18844435170 scopus 로고    scopus 로고
    • A typology of ‘best practices for a benchmarking process”
    • Marie, J.-L., Bronet, V. and Pillet, M. (2005), “A typology of ‘best practices’ for a benchmarking process”, Benchmarking: An International Journal, Vol. 12 No. 1, pp. 45-60.
    • (2005) Benchmarking: An International Journal , vol.12 , Issue.1 , pp. 45-60
    • Marie, J.-L.1    Bronet, V.2    Pillet, M.3
  • 27
    • 22744449303 scopus 로고    scopus 로고
    • “The benefits of lean manufacturing: What lean thinking has to offer to the process industries
    • Melton, T. (2005), “The benefits of lean manufacturing: what lean thinking has to offer to the process industries”, Chemical Engineering Research and Design, Vol. 83 No. A6, pp. 662-673.
    • (2005) Chemical Engineering Research and Design , vol.83 , Issue.6 , pp. 662-673
    • Melton, T.1
  • 29
    • 33646407541 scopus 로고    scopus 로고
    • Buyer-supplier relationships in small firms: The use of social factors to manage relationships
    • Morrissey, J.W. and Pittaway, L. (2006), “Buyer-supplier relationships in small firms: the use of social factors to manage relationships”, International Small Business Journal, Vol. 24 No. 3, pp. 272-298.
    • (2006) International Small Business Journal , vol.24 , Issue.3 , pp. 272-298
    • Morrissey, J.W.1    Pittaway, L.2
  • 30
    • 0042363456 scopus 로고    scopus 로고
    • A business process change framework for examining lean manufacturing: A case study
    • Motwani, J. (2003), “A business process change framework for examining lean manufacturing: a case study”, Industrial Management & Data Systems, Vol. 103 No. 5, pp. 339-346.
    • (2003) Industrial Management &Amp; Data Systems , vol.103 , Issue.5 , pp. 339-346
    • Motwani, J.1
  • 31
    • 78751645637 scopus 로고    scopus 로고
    • Company-specific quantitative evaluation of lean production methods
    • Peter, K. and Lanza, G. (2011), “Company-specific quantitative evaluation of lean production methods”, Production Engineering, Vol. 5 No. 1, pp. 81-87.
    • (2011) Production Engineering , vol.5 , Issue.1 , pp. 81-87
    • Peter, K.1    Lanza, G.2
  • 32
    • 0041418020 scopus 로고    scopus 로고
    • Lean is not enough
    • Ross, A. and Francis, D. (2003), “Lean is not enough”, Manufacturing Engineer, Vol. 82No. 4, pp. 14-17.
    • (2003) Manufacturing Engineer , vol.82 , Issue.4 , pp. 14-17
    • Ross, A.1    Francis, D.2
  • 33
    • 84924384371 scopus 로고    scopus 로고
    • master thesis, Massachusetts Institute of Technology, Cambridge, MA, , accessed September 15, 2012
    • Seitz, T. (2003), “Lean enterprise integration: a new framework for small businesses”, master thesis, Massachusetts Institute of Technology, Cambridge, MA, available at: http://lean.mit.edu/downolads/cat_view/75-theses/3328-2003-theses (accessed September 15, 2012).
    • (2003) Lean Enterprise Integration: A New Framework for Small Businesses
    • Seitz, T.1
  • 34
    • 0037357671 scopus 로고    scopus 로고
    • Lean manufacturing: Context, practice bundles, and performance
    • Shah, R. and Ward, P.T. (2003), “Lean manufacturing: context, practice bundles, and performance”, Journal of Operations Management, Vol. 21 No. 2, pp. 129-149.
    • (2003) Journal of Operations Management , vol.21 , Issue.2 , pp. 129-149
    • Shah, R.1    Ward, P.T.2
  • 36
    • 3543121323 scopus 로고    scopus 로고
    • A conceptual framework for effective implementation of JIT: An empirical investigation
    • Wafa, M.A. and Yasin, M.M. (1998), “A conceptual framework for effective implementation of JIT: an empirical investigation”, International Journal of Operations & Production Management, Vol. 18 No. 11, pp. 1111-1124.
    • (1998) International Journal of Operations &Amp; Production Management , vol.18 , Issue.11 , pp. 1111-1124
    • Wafa, M.A.1    Yasin, M.M.2
  • 37
    • 55349114890 scopus 로고
    • Kaizen, the many ways of getting better
    • Wittenberg, G. (1994), “Kaizen, the many ways of getting better”, Assembly Automation, Vol. 14 No. 4, pp. 12-17.
    • (1994) Assembly Automation , vol.14 , Issue.4 , pp. 12-17
    • Wittenberg, G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.