-
1
-
-
33746375651
-
'Near-optimal rehabilitation scheduling of water distribution systems based on a multi-objective genetic algorithm'
-
Alvisi, S., and Franchini, M. (2006). "Near-optimal rehabilitation scheduling of water distribution systems based on a multi-objective genetic algorithm". Civ. Eng. Environ. Syst., 23(3), 143-160.
-
(2006)
Civ. Eng. Environ. Syst.
, vol.23
, Issue.3
, pp. 143-160
-
-
Alvisi, S.1
Franchini, M.2
-
2
-
-
70350423302
-
'Multiobjective optimization of rehabilitation and leakage detection scheduling in water distribution systems'
-
Alvisi, S., and Franchini, M. (2009). "Multiobjective optimization of rehabilitation and leakage detection scheduling in water distribution systems". J. Water Resour. Plann. Manage. 426-439. 10.1061/(ASCE)0733-9496(2009)135:6(426).
-
(2009)
J. Water Resour. Plann. Manage.
, pp. 426-439
-
-
Alvisi, S.1
Franchini, M.2
-
3
-
-
0029411369
-
'Concept of significance index for maintenance and design of pipe networks'
-
Arulraj, G. P., and Suresh, H. R. (1995). "Concept of significance index for maintenance and design of pipe networks". J. Hydraul. Eng. 833-837. 10.1061/(ASCE)0733-9429(1995)121:11(833).
-
(1995)
J. Hydraul. Eng.
, pp. 833-837
-
-
Arulraj, G.P.1
Suresh, H.R.2
-
4
-
-
0035307339
-
'Water leakage and sustainable supply-truth or consequences?'
-
Brothers, K. J. (2001). "Water leakage and sustainable supply-truth or consequences?" J. Am. Water Works Assoc., 93(4), 150-152.
-
(2001)
J. Am. Water Works Assoc.
, vol.93
, Issue.4
, pp. 150-152
-
-
Brothers, K.J.1
-
5
-
-
0037238399
-
'Asset planning for water reticulation systems: The PARMS model'
-
Burn, L. S., Tucker, S. N., Rahilly, M., Davis, P., Jarrett, R., and Po, M. (2003). "Asset planning for water reticulation systems: The PARMS model". Water Sci. Technol., 3(1), 55-62.
-
(2003)
Water Sci. Technol.
, vol.3
, Issue.1
, pp. 55-62
-
-
Burn, L.S.1
Tucker, S.N.2
Rahilly, M.3
Davis, P.4
Jarrett, R.5
Po, M.6
-
8
-
-
84940237720
-
'Accounting for phasing of construction within the design of water distribution networks'
-
in press
-
Creaco, E., Franchini, M., and Walski, T. (2013). "Accounting for phasing of construction within the design of water distribution networks". J. Water Resour. Plann. Manage. in press. 10.1061/(ASCE)WR.1943-5452.0000358.
-
(2013)
J. Water Resour. Plann. Manage
-
-
Creaco, E.1
Franchini, M.2
Walski, T.3
-
9
-
-
0035395910
-
'Optimal scheduling of water pipe replacement using genetic algorithms'
-
Dandy, G. C., and Engelhardt, M. (2001). "Optimal scheduling of water pipe replacement using genetic algorithms". J. Water Resour. Plann. Manage. 214-223. 10.1061/(ASCE)0733-9496(2001)127:4(214).
-
(2001)
J. Water Resour. Plann. Manage.
, pp. 214-223
-
-
Dandy, G.C.1
Engelhardt, M.2
-
10
-
-
33144476626
-
'Multi-objective trade-offs between cost and reliability in the replacement of water mains'
-
Dandy, G. C., and Engelhardt, M. (2006). "Multi-objective trade-offs between cost and reliability in the replacement of water mains". J. Water Resour. Plann. Manage. 79-88. 10.1061/(ASCE)0733-9496(2006)132:2(79).
-
(2006)
J. Water Resour. Plann. Manage.
, pp. 79-88
-
-
Dandy, G.C.1
Engelhardt, M.2
-
11
-
-
0020205298
-
'Organizing and analyzing leak and break data for making main replacement decisions'
-
Day, D. K. (1982). "Organizing and analyzing leak and break data for making main replacement decisions". J. Am. Water Works Assoc., 74(11), 588-594.
-
(1982)
J. Am. Water Works Assoc.
, vol.74
, Issue.11
, pp. 588-594
-
-
Day, D.K.1
-
12
-
-
4244108521
-
-
American Water Works Association Research Foundation, Denver
-
Deb, A. K., Grablutz, F. M., Hasit, Y. J., Snyder, J. K., Loganathan, G. V., and Agbenowsi, N. (2002). Prioritizing water main rehabilitation and replacement, American Water Works Association Research Foundation, Denver.
-
(2002)
Prioritizing water main rehabilitation and replacement
-
-
Deb, A.K.1
Grablutz, F.M.2
Hasit, Y.J.3
Snyder, J.K.4
Loganathan, G.V.5
Agbenowsi, N.6
-
13
-
-
0036530772
-
'A fast and elitist multi-objective genetic algorithm: NSGA-II'
-
Deb, K., Pratap, A., Agarwal, S., and Meyarivan, T. (2002). "A fast and elitist multi-objective genetic algorithm: NSGA-II". IEEE Trans. Evol. Comput., 6(2), 182-197.
-
(2002)
IEEE Trans. Evol. Comput.
, vol.6
, Issue.2
, pp. 182-197
-
-
Deb, K.1
Pratap, A.2
Agarwal, S.3
Meyarivan, T.4
-
14
-
-
22144488590
-
-
CGI Risk Management Services Group, Markham, Canada.
-
Fire Underwriters Survey (FUS). (1999). Water supply for public protection, CGI Risk Management Services Group, Markham, Canada.
-
(1999)
Water supply for public protection
-
-
-
15
-
-
0022117480
-
'A technical note on the inclusion of pressure dependent demand and leakage terms in water supply network models'
-
Germanopoulos, G. (1985). "A technical note on the inclusion of pressure dependent demand and leakage terms in water supply network models". Civ. Eng. Syst., 2(3), 171-179.
-
(1985)
Civ. Eng. Syst.
, vol.2
, Issue.3
, pp. 171-179
-
-
Germanopoulos, G.1
-
17
-
-
0028498635
-
'Optimal rehabilitation model for water-distribution systems'
-
Kim, J. H., and Mays, L. W. (1994). "Optimal rehabilitation model for water-distribution systems". J. Water Resour. Plann. Manage. 674-692. 10.1061/(ASCE)0733-9496(1994)120:5(674).
-
(1994)
J. Water Resour. Plann. Manage.
, pp. 674-692
-
-
Kim, J.H.1
Mays, L.W.2
-
18
-
-
0031815321
-
'Long-term planning methodology for water distribution system rehabilitation'
-
Kleiner, Y., Adams, B. J., and Rogers, J. S. (1998). "Long-term planning methodology for water distribution system rehabilitation". Water Resour. Res., 34(8), 2039-2051.
-
(1998)
Water Resour. Res.
, vol.34
, Issue.8
, pp. 2039-2051
-
-
Kleiner, Y.1
Adams, B.J.2
Rogers, J.S.3
-
19
-
-
84906222209
-
'A comprehensive approach to long and short term planning of water main renewal'
-
Centre for Water Systems, Univ. of Exeter, Exeter, U.K.
-
Kleiner, Y., and Nafi, A. (2011). "A comprehensive approach to long and short term planning of water main renewal". 2011 Conf. in Computation and Control in Water Industry, Centre for Water Systems, Univ. of Exeter, Exeter, U.K.
-
(2011)
2011 Conf. in Computation and Control in Water Industry
-
-
Kleiner, Y.1
Nafi, A.2
-
20
-
-
0032657522
-
'Using limited data to assess future needs'
-
Kleiner, Y., and Rajani, B. (1999). "Using limited data to assess future needs". J. Am. Water Works Assoc., 91(7), 47-61.
-
(1999)
J. Am. Water Works Assoc.
, vol.91
, Issue.7
, pp. 47-61
-
-
Kleiner, Y.1
Rajani, B.2
-
21
-
-
0026808111
-
'Optimal maintenance scheduling for water distribution systems'
-
Lansey, K., Basnet, C., Mays, L. W., and Woodburn, J. (1992). "Optimal maintenance scheduling for water distribution systems". Civ. Eng. Syst., 9(3), 211-226.
-
(1992)
Civ. Eng. Syst.
, vol.9
, Issue.3
, pp. 211-226
-
-
Lansey, K.1
Basnet, C.2
Mays, L.W.3
Woodburn, J.4
-
22
-
-
0025507256
-
'Optimization model for water distribution system design'
-
Lansey, K. E., and Mays, L. W. (1989). "Optimization model for water distribution system design". J. Hydraul. Eng. 1401-1418. 10.1061/(ASCE)0733-9429(1989)115:10(1401).
-
(1989)
J. Hydraul. Eng.
, pp. 1401-1418
-
-
Lansey, K.E.1
Mays, L.W.2
-
23
-
-
1542541369
-
'Optimal replacement of water pipes'
-
Mailhot, A., Poulin, A., and Villeneuve, J. P. (2003). "Optimal replacement of water pipes". Water Resour. Res., 39(5), 1-14.
-
(2003)
Water Resour. Res.
, vol.39
, Issue.5
, pp. 1-14
-
-
Mailhot, A.1
Poulin, A.2
Villeneuve, J.P.3
-
24
-
-
84904688763
-
'Developing an integrated model for water distribution systems considering both distributed leakage and pressure-dependent demands'
-
ASCE, Reston, VA
-
Martinez, F., Conejos, P., and Vercher, J. (1999). "Developing an integrated model for water distribution systems considering both distributed leakage and pressure-dependent demands". 26th ASCE Water Resources Planning and Management Division Conf., ASCE, Reston, VA, 1-14.
-
(1999)
26th ASCE Water Resources Planning and Management Division Conf
, pp. 1-14
-
-
Martinez, F.1
Conejos, P.2
Vercher, J.3
-
25
-
-
33646583524
-
'Decision support system for water pipeline renewal prioritisation'
-
Moglia, M., Burn, S., and Meddings, S. (2006). "Decision support system for water pipeline renewal prioritisation". Electron. J. Inform. Tech. Construct., 11, 237-256.
-
(2006)
Electron. J. Inform. Tech. Construct.
, vol.11
, pp. 237-256
-
-
Moglia, M.1
Burn, S.2
Meddings, S.3
-
26
-
-
78651490378
-
'Scheduling renewal of water pipes while considering adjacency of infrastructure works and economies of scale'
-
Nafi, A., and Kleiner, Y. (2010). "Scheduling renewal of water pipes while considering adjacency of infrastructure works and economies of scale". J. Water Resour. Plann. Manage. 519-530. 10.1061/(ASCE)WR.1943-5452.0000062.
-
(2010)
J. Water Resour. Plann. Manage.
, pp. 519-530
-
-
Nafi, A.1
Kleiner, Y.2
-
27
-
-
84859341205
-
'Evaluating the impact of climate change mitigation strategies on the optimal design and expansion of the Amherstview, Ontario water network: A Canadian case study'
-
Roshani, E., MacLeod, S. P., and Filion, Y. R. (2012). "Evaluating the impact of climate change mitigation strategies on the optimal design and expansion of the Amherstview, Ontario water network: A Canadian case study". J. Water Resour. Plann. Manage. 100-110. 10.1061/(ASCE)WR.1943-5452.0000158.
-
(2012)
J. Water Resour. Plann. Manage.
, pp. 100-110
-
-
Roshani, E.1
MacLeod, S.P.2
Filion, Y.R.3
-
29
-
-
0029659569
-
'Capacity reliability of water distribution networks and optimum rehabilitation decision making'
-
Schneiter, C. R., Haimes, Y. Y., Li, D., and Lambert, J. H. (1996). "Capacity reliability of water distribution networks and optimum rehabilitation decision making". Water Resour. Res., 32(7), 2271-2278.
-
(1996)
Water Resour. Res.
, vol.32
, Issue.7
, pp. 2271-2278
-
-
Schneiter, C.R.1
Haimes, Y.Y.2
Li, D.3
Lambert, J.H.4
-
30
-
-
0018318075
-
'An analytic approach to scheduling pipe replacement'
-
Shamir, U., and Howard, C. D. D. (1979). "An analytic approach to scheduling pipe replacement". J. Am. Water Works Assoc., 71(5), 248-258.
-
(1979)
J. Am. Water Works Assoc.
, vol.71
, Issue.5
, pp. 248-258
-
-
Shamir, U.1
Howard, C.D.D.2
-
31
-
-
0024108254
-
'Predicting internal roughness in water mains'
-
Sharp, W. W., and Walski, T. M. (1988). "Predicting internal roughness in water mains". J. Am. Water Works Assoc., 80(11), 34-40.
-
(1988)
J. Am. Water Works Assoc.
, vol.80
, Issue.11
, pp. 34-40
-
-
Sharp, W.W.1
Walski, T.M.2
-
32
-
-
82955208765
-
-
Treasury Board of Canada Secretariat, Ottawa, ON, Canada.
-
Treasury Board of Canada Secretariat (TBS). (2007). Benefit-cost analysis guide interim report, Treasury Board of Canada Secretariat, Ottawa, ON, Canada.
-
(2007)
Benefit-cost analysis guide interim report
-
-
-
33
-
-
0022723008
-
'Predicting costs of pipe cleaning and lining projects'
-
Walski, T. M. (1986). "Predicting costs of pipe cleaning and lining projects". J. Transp. Eng. 317-327. 10.1061/(ASCE)0733-947X(1986)112:3(317).
-
(1986)
J. Transp. Eng.
, pp. 317-327
-
-
Walski, T.M.1
-
34
-
-
0020098396
-
'Economic analysis of water main breaks'
-
Walski, T. M., and Pelliccia, A. (1982). "Economic analysis of water main breaks". J. Am. Water Works Assoc., 74(3), 140-147.
-
(1982)
J. Am. Water Works Assoc.
, vol.74
, Issue.3
, pp. 140-147
-
-
Walski, T.M.1
Pelliccia, A.2
-
35
-
-
0023172149
-
'Model for the optimal rehabilitation and replacement of water distribution system components'
-
ASCE, New York.
-
Woodburn, J., Lansey, K., and Mays, L. W. (1987). "Model for the optimal rehabilitation and replacement of water distribution system components". Proc., 1987 National Conf. Hydraulic Engineering, ASCE, New York.
-
(1987)
Proc., 1987 National Conf. Hydraulic Engineering
-
-
Woodburn, J.1
Lansey, K.2
Mays, L.W.3
|