메뉴 건너뛰기




Volumn 26, Issue 1, 2015, Pages 159-168

A late acceptance hill-climbing algorithm for balancing two-sided assembly lines with multiple constraints

Author keywords

Late acceptance hill climbing; Multiple constraints; Two sided assembly line balancing

Indexed keywords

ASSEMBLY MACHINES; INTEGER PROGRAMMING;

EID: 84921068927     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-013-0770-x     Document Type: Article
Times cited : (64)

References (25)
  • 1
    • 84865481163 scopus 로고    scopus 로고
    • Experimental result of late acceptance randomized descent algorithm for solving course timetabling problems
    • Abuhamdah, A. (2010). Experimental result of late acceptance randomized descent algorithm for solving course timetabling problems. International Journal of Computer Science and Network Security, 10(1), 192–200.
    • (2010) International Journal of Computer Science and Network Security , vol.10 , Issue.1 , pp. 192-200
    • Abuhamdah, A.1
  • 3
    • 0027675494 scopus 로고
    • Balancing two-sided assembly lines: A case study
    • Bartholdi, J. (1993). Balancing two-sided assembly lines: A case study. International Journal of Production Research, 31(10), 2447–2461.
    • (1993) International Journal of Production Research , vol.31 , Issue.10 , pp. 2447-2461
    • Bartholdi, J.1
  • 4
    • 33645509107 scopus 로고    scopus 로고
    • Multi-rule multi-objective simulated annealing algorithm for straight and U type assembly line balancing problems
    • Baykasoglu, A. (2006). Multi-rule multi-objective simulated annealing algorithm for straight and U type assembly line balancing problems. Journal of Intelligent Manufacturing, 17(2), 217–232.
    • (2006) Journal of Intelligent Manufacturing , vol.17 , Issue.2 , pp. 217-232
    • Baykasoglu, A.1
  • 6
    • 84983114575 scopus 로고    scopus 로고
    • Burke, E. K., & Bykov, Y. (2008). A late acceptance strategy in hill-climbing for exam timetabling problems. In Conference on the practice and theory of automated timetabling, Montreal, Canada
    • Burke, E. K., & Bykov, Y. (2008). A late acceptance strategy in hill-climbing for exam timetabling problems. In Conference on the practice and theory of automated timetabling, Montreal, Canada.
  • 7
    • 82755197729 scopus 로고    scopus 로고
    • Multi-objective two-sided mixed-model assembly line balancing using particle swarm optimisation with negative knowledge
    • Chutima, P., & Chimklai, P. (2012). Multi-objective two-sided mixed-model assembly line balancing using particle swarm optimisation with negative knowledge. Computers & Industrial Engineering, 62(1), 39–55.
    • (2012) Computers & Industrial Engineering , vol.62 , Issue.1 , pp. 39-55
    • Chutima, P.1    Chimklai, P.2
  • 8
    • 35348949412 scopus 로고    scopus 로고
    • A station-oriented enumerative algorithm for two-sided assembly line balancing
    • Hu, X. F., Wu, E. F., & Jin, Y. (2008). A station-oriented enumerative algorithm for two-sided assembly line balancing. European Journal of Operational Research, 186(1), 435–440.
    • (2008) European Journal of Operational Research , vol.186 , Issue.1 , pp. 435-440
    • Hu, X.F.1    Wu, E.F.2    Jin, Y.3
  • 9
    • 77951096660 scopus 로고    scopus 로고
    • A branch-and-bound algorithm to minimize the line length of a two-sided assembly line
    • Hu, X. F., Wu, E. F., Bao, J. S., & Jin, Y. (2010). A branch-and-bound algorithm to minimize the line length of a two-sided assembly line. European Journal of Operational Research, 206(3), 703–707.
    • (2010) European Journal of Operational Research , vol.206 , Issue.3 , pp. 703-707
    • Hu, X.F.1    Wu, E.F.2    Bao, J.S.3    Jin, Y.4
  • 10
    • 0033993174 scopus 로고    scopus 로고
    • Two-sided assembly line balancing: A genetic algorithm approach
    • Kim, Y. K., Kim, Y. H., & Kim, Y. J. (2000). Two-sided assembly line balancing: A genetic algorithm approach. Production Planning & Control, 11(1), 44–53.
    • (2000) Production Planning & Control , vol.11 , Issue.1 , pp. 44-53
    • Kim, Y.K.1    Kim, Y.H.2    Kim, Y.J.3
  • 11
    • 53749096405 scopus 로고    scopus 로고
    • A mathematical model and a genetic algorithm for two-sided assembly line balancing
    • Kim, Y. K., Song, W. S., & Kim, J. H. (2009). A mathematical model and a genetic algorithm for two-sided assembly line balancing. Computers & Operations Research, 36(3), 853–865.
    • (2009) Computers & Operations Research , vol.36 , Issue.3 , pp. 853-865
    • Kim, Y.K.1    Song, W.S.2    Kim, J.H.3
  • 12
    • 0035399914 scopus 로고    scopus 로고
    • Two-sided assembly line balancing to maximize work relatedness and slackness
    • Lee, T. O., Kim, Y., & Kim, Y. K. (2001). Two-sided assembly line balancing to maximize work relatedness and slackness. Computers & Industrial Engineering, 40(3), 273–292.
    • (2001) Computers & Industrial Engineering , vol.40 , Issue.3 , pp. 273-292
    • Lee, T.O.1    Kim, Y.2    Kim, Y.K.3
  • 13
    • 78650583165 scopus 로고    scopus 로고
    • Balancing fuzzy multi-objective two-sided assembly lines via bees algorithm
    • Ozbakir, L., & Tapkan, P. (2010). Balancing fuzzy multi-objective two-sided assembly lines via bees algorithm. Journal of Intelligent & Fuzzy Systems, 21(5), 317–329.
    • (2010) Journal of Intelligent & Fuzzy Systems , vol.21 , Issue.5 , pp. 317-329
    • Ozbakir, L.1    Tapkan, P.2
  • 14
    • 79955580803 scopus 로고    scopus 로고
    • Bee colony intelligence in zone constrained two-sided assembly line balancing problem
    • Ozbakir, L., & Tapkan, P. (2011). Bee colony intelligence in zone constrained two-sided assembly line balancing problem. Expert Systems with Applications, 38(9), 11947–11957.
    • (2011) Expert Systems with Applications , vol.38 , Issue.9 , pp. 11947-11957
    • Ozbakir, L.1    Tapkan, P.2
  • 15
    • 75849138540 scopus 로고    scopus 로고
    • Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm
    • Ozcan, U. (2010). Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm. European Journal of Operational Research, 205(1), 81–97.
    • (2010) European Journal of Operational Research , vol.205 , Issue.1 , pp. 81-97
    • Ozcan, U.1
  • 16
    • 58549088684 scopus 로고    scopus 로고
    • A new hybrid improvement heuristic approach to simple straight and U-type assembly line balancing problems
    • Ozcan, U., & Toklu, B. (2009a). A new hybrid improvement heuristic approach to simple straight and U-type assembly line balancing problems. Journal of Intelligent Manufacturing, 20(1), 123–136.
    • (2009) Journal of Intelligent Manufacturing , vol.20 , Issue.1 , pp. 123-136
    • Ozcan, U.1    Toklu, B.2
  • 17
    • 56549085980 scopus 로고    scopus 로고
    • Multiple-criteria decision-making in two-sided assembly line balancing: A goal programming and a fuzzy goal programming models
    • Ozcan, U., & Toklu, B. (2009b). Multiple-criteria decision-making in two-sided assembly line balancing: A goal programming and a fuzzy goal programming models. Computers & Operations Research, 36(6), 1955–1965.
    • (2009) Computers & Operations Research , vol.36 , Issue.6 , pp. 1955-1965
    • Ozcan, U.1    Toklu, B.2
  • 19
    • 67349117327 scopus 로고    scopus 로고
    • Balancing of mixed-model two-sided assembly lines
    • Ozcan, U., & Toklu, B. (2009d). Balancing of mixed-model two-sided assembly lines. Computers & Industrial Engineering, 57(1), 217–227.
    • (2009) Computers & Industrial Engineering , vol.57 , Issue.1 , pp. 217-227
    • Ozcan, U.1    Toklu, B.2
  • 21
    • 59349112769 scopus 로고    scopus 로고
    • 2-ANTBAL: An ant colony optimisation algorithm for balancing two-sided assembly lines
    • Simaria, A. S., & Vilarinho, P. M. (2009). 2-ANTBAL: An ant colony optimisation algorithm for balancing two-sided assembly lines. Computers & Industrial Engineering, 56(2), 489–506.
    • (2009) Computers & Industrial Engineering , vol.56 , Issue.2 , pp. 489-506
    • Simaria, A.S.1    Vilarinho, P.M.2
  • 22
    • 39449124682 scopus 로고    scopus 로고
    • A review of the current applications of genetic algorithms in assembly line balancing
    • Tasan, S. O., & Tunali, S. (2008). A review of the current applications of genetic algorithms in assembly line balancing. Journal of Intelligent Manufacturing, 19(1), 49–69.
    • (2008) Journal of Intelligent Manufacturing , vol.19 , Issue.1 , pp. 49-69
    • Tasan, S.O.1    Tunali, S.2
  • 23
    • 84864403256 scopus 로고    scopus 로고
    • Bees algorithm for constrained fuzzy multi-objective two-sided assembly line balancing problem
    • Tapkan, P., Ozbakir, L., & Baykasoglu, A. (2012). Bees algorithm for constrained fuzzy multi-objective two-sided assembly line balancing problem. Optimization Letters, 6(6), 1039–1049.
    • (2012) Optimization Letters , vol.6 , Issue.6 , pp. 1039-1049
    • Tapkan, P.1    Ozbakir, L.2    Baykasoglu, A.3
  • 24
    • 80053040995 scopus 로고    scopus 로고
    • A late acceptance algorithm for the lock scheduling problem
    • Verstichel, J., & Berghe, G. V. (2009). A late acceptance algorithm for the lock scheduling problem. Logistic Management, 5, 457–478.
    • (2009) Logistic Management , vol.5 , pp. 457-478
    • Verstichel, J.1    Berghe, G.V.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.