-
2
-
-
5644245218
-
An analytical investigation of the bullwhip effect
-
R. Warburton, An Analytical Investigation of the Bullwhip Effect, Production and Operations Management, Vol. 13, No. 2, pp. 150-160, 2004.
-
(2004)
Production and Operations Management
, vol.13
, Issue.2
, pp. 150-160
-
-
Warburton, R.1
-
3
-
-
0242366706
-
Scheduling problems for parallel dedicated machines under multiple resource constraints
-
H. Kellerer and V. Strusevich, Scheduling Problems for Parallel Dedicated Machines under Multiple Resource Constraints, Descrete Applied Mathemathics 113, 2004, 45-68.
-
(2004)
Descrete Applied Mathemathics
, vol.113
, pp. 45-68
-
-
Kellerer, H.1
Strusevich, V.2
-
4
-
-
49149120190
-
Scheduling parallel dedicated machines with the speeding-up resource
-
H. Kellerer and V. Strusevich, Scheduling Parallel Dedicated Machines with the Speeding-Up Resource, Naval Research Logistics, Vol. 55, 2008.
-
(2008)
Naval Research Logistics
, vol.55
-
-
Kellerer, H.1
Strusevich, V.2
-
5
-
-
33845974930
-
A multi-objective production scheduling case study solved by simulated annealing
-
T. Loukil, J. Teghem and P. Fortemps, A multi-objective production scheduling case study solved by simulated annealing, European Journal of Operational Research 179, 2007, pp. 709-722.
-
(2007)
European Journal of Operational Research
, vol.179
, pp. 709-722
-
-
Loukil, T.1
Teghem, J.2
Fortemps, P.3
-
6
-
-
0023965120
-
Dynamic programming state-space relaxation for single machine scheduling
-
T. Abdui-Razaq and C Potts, Dynamic programming state-space relaxation for single machine scheduling, Journal of Oper. Res. Soc. Vol. 39 pp. 141-152, 1988.
-
(1988)
Journal of Oper. Res. Soc.
, vol.39
, pp. 141-152
-
-
Abdui-Razaq, T.1
Potts, C.2
-
7
-
-
3543096874
-
The one-machine problem with earliness and tardiness penalties
-
F. Sourd and S. Kedad-Sidhoum, The one-machine problem with earliness and tardiness penalties, Journal of Scheduling, Vol. 6 pp. 533-549, 2003.
-
(2003)
Journal of Scheduling
, vol.6
, pp. 533-549
-
-
Sourd, F.1
Kedad-Sidhoum, S.2
-
8
-
-
41949088593
-
New solution approaches to the general single-machine earliness-tardiness problem
-
April
-
H. Yau, Y. Pan, and L. Shi, New Solution Approaches to the General Single-Machine Earliness-Tardiness Problem, in IEEE Transactions on Automation Science and Engineering, Vol. 5, No. 2, April 2008.
-
(2008)
IEEE Transactions on Automation Science and Engineering
, vol.5
, Issue.2
-
-
Yau, H.1
Pan, Y.2
Shi, L.3
-
9
-
-
38749102030
-
On the geometry, preemptions and complexity of multiprocessor and shop scheduling
-
Springer
-
E. Shchepin, and N. Vakhania, On the geometry, preemptions and complexity of multiprocessor and shop scheduling, in Annals of Operations Research, Springer, 2008.
-
(2008)
Annals of Operations Research
-
-
Shchepin, E.1
Vakhania, N.2
-
10
-
-
22944478278
-
-
Technical Report, TR00-009, Department of Computer Science, Texas A&M University
-
N. Amato, P. An. Task Scheduling and Parallel-Mesh-Sweeps in Transport Computations, Technical Report, TR00-009, Department of Computer Science, Texas A&M University, 2000.
-
(2000)
Task Scheduling and Parallel-Mesh-Sweeps in Transport Computations
-
-
Amato, N.1
An, P.2
|