메뉴 건너뛰기




Volumn 33, Issue 4, 2014, Pages 462-475

An integrated inventory problem with transportation in a divergent supply chain under service level constraint

Author keywords

Controllable lead time; Integrated inventory model; Multi buyer; Service level constraint

Indexed keywords

AUTOMOBILE MANUFACTURE; COST REDUCTION; FLEET OPERATIONS; NORMAL DISTRIBUTION; SUPPLY CHAINS;

EID: 84919463059     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jmsy.2014.04.002     Document Type: Article
Times cited : (27)

References (39)
  • 1
    • 33748518397 scopus 로고    scopus 로고
    • On the integrated production, inventory, and distribution routing problem
    • L. Lei, S. Liu, A. Ruszczynski, and S. Park On the integrated production, inventory, and distribution routing problem IIE Trans 38 11 2006 955 970
    • (2006) IIE Trans , vol.38 , Issue.11 , pp. 955-970
    • Lei, L.1    Liu, S.2    Ruszczynski, A.3    Park, S.4
  • 2
    • 0033344267 scopus 로고    scopus 로고
    • A review of integrated analysis of production-distribution systems
    • A.M. Sarmiento, and R. Nagi A review of integrated analysis of production-distribution systems IIE Trans 31 11 1999 1061 1074
    • (1999) IIE Trans , vol.31 , Issue.11 , pp. 1061-1074
    • Sarmiento, A.M.1    Nagi, R.2
  • 3
    • 0032674456 scopus 로고    scopus 로고
    • An integrated inventory-transportation system with modified periodic policy for multiple products
    • W.W. Qu, J.H. Bookbinder, and P. Iyogun An integrated inventory-transportation system with modified periodic policy for multiple products Eur J Operat Res 115 2 1999 254 269
    • (1999) Eur J Operat Res , vol.115 , Issue.2 , pp. 254-269
    • Qu, W.W.1    Bookbinder, J.H.2    Iyogun, P.3
  • 4
    • 67349207733 scopus 로고    scopus 로고
    • Joint cyclic production and delivery scheduling in a two-stage supply chain
    • G. Pundoor, and Z.L. Chen Joint cyclic production and delivery scheduling in a two-stage supply chain Int J Prod Econ 19 1 2009 55 74
    • (2009) Int J Prod Econ , vol.19 , Issue.1 , pp. 55-74
    • Pundoor, G.1    Chen, Z.L.2
  • 6
    • 0017416997 scopus 로고
    • An integrated inventory model for a single supplier-single customer problem
    • S.K. Goyal An integrated inventory model for a single supplier-single customer problem Int J Prod Res 15 1 1976 107 111
    • (1976) Int J Prod Res , vol.15 , Issue.1 , pp. 107-111
    • Goyal, S.K.1
  • 7
    • 84985846646 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor
    • A. Banerjee A joint economic-lot-size model for purchaser and vendor Decis Sci 17 3 1986 292 311
    • (1986) Decis Sci , vol.17 , Issue.3 , pp. 292-311
    • Banerjee, A.1
  • 8
    • 0033747626 scopus 로고    scopus 로고
    • An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment
    • M.A. Hoque, and S.K. Goyal An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment Int J Prod Econ 180 1 2000 305 315
    • (2000) Int J Prod Econ , vol.180 , Issue.1 , pp. 305-315
    • Hoque, M.A.1    Goyal, S.K.2
  • 9
    • 33749988426 scopus 로고    scopus 로고
    • Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost
    • K. Ertogral, M. Darwish, and M. Ben-Daya Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost Eur J Operat Res 176 3 2007 1592 1606
    • (2007) Eur J Operat Res , vol.176 , Issue.3 , pp. 1592-1606
    • Ertogral, K.1    Darwish, M.2    Ben-Daya, M.3
  • 10
    • 49049099173 scopus 로고    scopus 로고
    • Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information
    • Y.C. Hsiao Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information Int J Prod Econ 115 1 2008 229 235
    • (2008) Int J Prod Econ , vol.115 , Issue.1 , pp. 229-235
    • Hsiao, Y.C.1
  • 11
    • 34548838814 scopus 로고    scopus 로고
    • The joint economic lot sizing problem: Review and extensions
    • M. Ben-Daya, M. Darwish, and K. Ertogral The joint economic lot sizing problem: review and extensions Eur J Operat Res 185 2 2008 726 742
    • (2008) Eur J Operat Res , vol.185 , Issue.2 , pp. 726-742
    • Ben-Daya, M.1    Darwish, M.2    Ertogral, K.3
  • 12
    • 84155165065 scopus 로고    scopus 로고
    • The joint economic lot size problem: A review
    • C.H. Glock The joint economic lot size problem: a review Int J Prod Econ 135 2 2012 671 686
    • (2012) Int J Prod Econ , vol.135 , Issue.2 , pp. 671-686
    • Glock, C.H.1
  • 13
    • 84985822403 scopus 로고
    • The individually responsible and rational decision approach to economic lot sizes for one vendor and many purchasers
    • P. Joglekar, and S. Tharthare The individually responsible and rational decision approach to economic lot sizes for one vendor and many purchasers Decis Sci 21 3 1990 492 506
    • (1990) Decis Sci , vol.21 , Issue.3 , pp. 492-506
    • Joglekar, P.1    Tharthare, S.2
  • 14
    • 0029632685 scopus 로고
    • A one-vendor multi-buyer integrated inventory model
    • L. Lu A one-vendor multi-buyer integrated inventory model Eur J Operat Res 81 2 1995 312 323
    • (1995) Eur J Operat Res , vol.81 , Issue.2 , pp. 312-323
    • Lu, L.1
  • 15
    • 3042773343 scopus 로고    scopus 로고
    • On a replenishment coordination model in an integrated supply chain with one vendor and multiple buyers
    • M.J. Yao, and C.C. Chiou On a replenishment coordination model in an integrated supply chain with one vendor and multiple buyers Eur J Operat Res 159 2 2004 406 419
    • (2004) Eur J Operat Res , vol.159 , Issue.2 , pp. 406-419
    • Yao, M.J.1    Chiou, C.C.2
  • 16
    • 56049096723 scopus 로고    scopus 로고
    • Policies for a single-vendor multi-buyer system with finite production rate
    • B. Abdul-Jalbar, J.M. Gutiérrez, and J. Sicilia Policies for a single-vendor multi-buyer system with finite production rate Decis Support Syst 46 1 2008 84 100
    • (2008) Decis Support Syst , vol.46 , Issue.1 , pp. 84-100
    • Abdul-Jalbar, B.1    Gutiérrez, J.M.2    Sicilia, J.3
  • 17
    • 33646120799 scopus 로고    scopus 로고
    • Joint economic lot size in distribution system with multiple shipment policy
    • H. Siajadi, R.N. Ibrahim, and P.B. Lochert Joint economic lot size in distribution system with multiple shipment policy Int J Prod Econ 102 2 2006 302 316
    • (2006) Int J Prod Econ , vol.102 , Issue.2 , pp. 302-316
    • Siajadi, H.1    Ibrahim, R.N.2    Lochert, P.B.3
  • 18
    • 38649120479 scopus 로고    scopus 로고
    • Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain
    • M.A. Hoque Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain Eur J Operat Res 188 3 2008 811 825
    • (2008) Eur J Operat Res , vol.188 , Issue.3 , pp. 811-825
    • Hoque, M.A.1
  • 19
    • 79954414612 scopus 로고    scopus 로고
    • Generalized single-vendor multi-buyer integrated inventory supply chain models with a better synchronization
    • M.A. Hoque Generalized single-vendor multi-buyer integrated inventory supply chain models with a better synchronization Int J Prod Econ 131 2 2011 463 472
    • (2011) Int J Prod Econ , vol.131 , Issue.2 , pp. 463-472
    • Hoque, M.A.1
  • 20
    • 41549099629 scopus 로고    scopus 로고
    • An exact policy for enhancing buyer-supplier linkage in supply chain system
    • C.T. Chang, C.C. Chiou, Y.S. Liao, and S.C. Chang An exact policy for enhancing buyer-supplier linkage in supply chain system Int J Prod Econ 113 1 2008 470 479
    • (2008) Int J Prod Econ , vol.113 , Issue.1 , pp. 470-479
    • Chang, C.T.1    Chiou, C.C.2    Liao, Y.S.3    Chang, S.C.4
  • 21
    • 37349007852 scopus 로고    scopus 로고
    • Coordination of a single-manufacturer/multi-buyer supply chain with credit option
    • S.P. Sarmah, D. Acharya, and S.K. Goyal Coordination of a single-manufacturer/multi-buyer supply chain with credit option Int J Prod Econ 111 2 2008 676 685
    • (2008) Int J Prod Econ , vol.111 , Issue.2 , pp. 676-685
    • Sarmah, S.P.1    Acharya, D.2    Goyal, S.K.3
  • 22
    • 0031232606 scopus 로고    scopus 로고
    • Mixture inventory model involving variable lead time with a service level constraint
    • L.Y. Ouyang, and K.S. Wu Mixture inventory model involving variable lead time with a service level constraint Comput Operat Res 24 9 1997 875 882
    • (1997) Comput Operat Res , vol.24 , Issue.9 , pp. 875-882
    • Ouyang, L.Y.1    Wu, K.S.2
  • 24
    • 0002505095 scopus 로고
    • An analytical determination of lead time with normal demand
    • C.J. Liao, and C.H. Shyu An analytical determination of lead time with normal demand Int J Operat Prod Manage 11 9 1991 72 78
    • (1991) Int J Operat Prod Manage , vol.11 , Issue.9 , pp. 72-78
    • Liao, C.J.1    Shyu, C.H.2
  • 25
    • 0037139670 scopus 로고    scopus 로고
    • A study of an integrated inventory with controllable lead time
    • J.C.H. Pan, and J.S. Yang A study of an integrated inventory with controllable lead time Int J Prod Res 40 5 2002 1263 1273
    • (2002) Int J Prod Res , vol.40 , Issue.5 , pp. 1263-1273
    • Pan, J.C.H.1    Yang, J.S.2
  • 26
    • 9544241347 scopus 로고    scopus 로고
    • Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time
    • L.Y. Ouyang, K.S. Wu, and C.H. Ho Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time Int J Prod Econ 92 3 2004 255 266
    • (2004) Int J Prod Econ , vol.92 , Issue.3 , pp. 255-266
    • Ouyang, L.Y.1    Wu, K.S.2    Ho, C.H.3
  • 27
    • 1342266030 scopus 로고    scopus 로고
    • Just-in-time purchasing: An integrated inventory model involving deterministic variable lead time and quality improvement investment
    • J.S. Yang, and J.C.H. Pan Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment Int J Prod Res 42 5 2004 853 863
    • (2004) Int J Prod Res , vol.42 , Issue.5 , pp. 853-863
    • Yang, J.S.1    Pan, J.C.H.2
  • 28
    • 34250886305 scopus 로고    scopus 로고
    • Integrated vendor-buyer inventory system with sublot sampling inspection policy and controllable lead time
    • K.S. Wu, L.Y. Ouyang, and C.H. Ho Integrated vendor-buyer inventory system with sublot sampling inspection policy and controllable lead time Int J Syst Sci 38 4 2007 339 350
    • (2007) Int J Syst Sci , vol.38 , Issue.4 , pp. 339-350
    • Wu, K.S.1    Ouyang, L.Y.2    Ho, C.H.3
  • 29
    • 69649098598 scopus 로고    scopus 로고
    • Two-echelon supply chain inventory model with controllable lead time and service level constraint
    • J.K. Jha, and K. Shanker Two-echelon supply chain inventory model with controllable lead time and service level constraint Comput Ind Eng 57 3 2009 1096 1104
    • (2009) Comput Ind Eng , vol.57 , Issue.3 , pp. 1096-1104
    • Jha, J.K.1    Shanker, K.2
  • 30
    • 77955280730 scopus 로고    scopus 로고
    • Cost allocation model for optimizing supply chain inventory with controllable lead time
    • F. Ye, and X. Xu Cost allocation model for optimizing supply chain inventory with controllable lead time Comput Ind Eng 59 1 2010 93 99
    • (2010) Comput Ind Eng , vol.59 , Issue.1 , pp. 93-99
    • Ye, F.1    Xu, X.2
  • 31
    • 80053219023 scopus 로고    scopus 로고
    • Supply chain coordination model with controllable lead time and service level constraint
    • Y. Li, X. Xu, and F. Ye Supply chain coordination model with controllable lead time and service level constraint Comput Ind Eng 61 3 2011 858 864
    • (2011) Comput Ind Eng , vol.61 , Issue.3 , pp. 858-864
    • Li, Y.1    Xu, X.2    Ye, F.3
  • 32
    • 80054878040 scopus 로고    scopus 로고
    • Supply chain coordination with controllable lead time and asymmetric information
    • Y. Li, X. Xu, X. Zhao, J.H.Y. Yeung, and F. Ye Supply chain coordination with controllable lead time and asymmetric information Eur J Operat Res 217 1 2012 108 119
    • (2012) Eur J Operat Res , vol.217 , Issue.1 , pp. 108-119
    • Li, Y.1    Xu, X.2    Zhao, X.3    Yeung, J.H.Y.4    Ye, F.5
  • 33
    • 84879062020 scopus 로고    scopus 로고
    • An operational policy for an integrated inventory system under consignment stock policy with controllable lead time and buyers' space limitation
    • H. Yi, and B.R. Sarker An operational policy for an integrated inventory system under consignment stock policy with controllable lead time and buyers' space limitation Comput Operat Res 40 11 2013 2632 2645
    • (2013) Comput Operat Res , vol.40 , Issue.11 , pp. 2632-2645
    • Yi, H.1    Sarker, B.R.2
  • 34
    • 0007031914 scopus 로고
    • The distribution free continuous review inventory system with a service level constraint
    • I. Moon, and S. Choi The distribution free continuous review inventory system with a service level constraint Comput Ind Eng 27 1-4 1994 209 212
    • (1994) Comput Ind Eng , vol.27 , Issue.14 , pp. 209-212
    • Moon, I.1    Choi, S.2
  • 35
    • 4544274679 scopus 로고    scopus 로고
    • Improved inventory models with service level and lead time
    • P. Chu, K.L. Yang, and P.S. Chen Improved inventory models with service level and lead time Comput Operat Res 32 2 2005 285 296
    • (2005) Comput Operat Res , vol.32 , Issue.2 , pp. 285-296
    • Chu, P.1    Yang, K.L.2    Chen, P.S.3
  • 36
    • 52049093681 scopus 로고    scopus 로고
    • Integrated inventory and transportation mode selection: A service parts logistics system
    • E. Kutanoglu, and D. Lohiya Integrated inventory and transportation mode selection: a service parts logistics system Transport Res E: Logistics Transport Rev 44 5 2008 665 683
    • (2008) Transport Res E: Logistics Transport Rev , vol.44 , Issue.5 , pp. 665-683
    • Kutanoglu, E.1    Lohiya, D.2
  • 38
    • 84871233087 scopus 로고    scopus 로고
    • Lehigh University. [accessed 17.12.08]
    • Snyder LV. 2004. VRP Solver [Online]. Lehigh University. Available from: http://www.lehigh.edu/∼lvs2/download/vrpsolver.html [accessed 17.12.08].
    • (2004) VRP Solver
    • Snyder, L.V.1
  • 39
    • 0000419596 scopus 로고
    • Scheduling of vehicles from a central depot to a number of delivery points
    • G. Clarke, and J.W. Wright Scheduling of vehicles from a central depot to a number of delivery points Operat Res 12 4 1964 568 581
    • (1964) Operat Res , vol.12 , Issue.4 , pp. 568-581
    • Clarke, G.1    Wright, J.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.