-
1
-
-
84912109578
-
-
ITU-R rfeti Report ITU-R M. 2243, Assessment of the global mobile broadband deployments and forecasts for International Mobile Telecommunications Tech. Rep. 2011
-
ITU-R, "Report ITU-R M. 2243, Assessment of the global mobile broadband deployments and forecasts for International Mobile Telecommunications," Tech. Rep., 2011
-
-
-
-
3
-
-
84875640535
-
A novel architecture for LTE-B:C-plane/U-plane split and Phantom Cell concept
-
H. Ishii, Y. Kishiyama, and H. Takahashi, "A novel architecture for LTE-B:C-plane/U-plane split and Phantom Cell concept," in Globecom Workshops (GC Wkshps), 2012 IEEE, 2012, pp. 624-630
-
(2012)
Globecom Workshops (GC Wkshps), 2012 IEEE
, pp. 624-630
-
-
Ishii, H.1
Kishiyama, Y.2
Takahashi, H.3
-
4
-
-
84912071775
-
-
EARTH Project Work Package 2 Retrieved Apr. 18, 2013, Jun.
-
EARTH Project Work Package 2, "Deliverable D2. 1: Economical and Ecological Impact of ICT," Retrieved Apr. 18, 2013, from https://www. ict-earth. eu/publications/deliverables/deliverables. html, Jun. 2010
-
(2010)
Deliverable D2. 1: Economical and Ecological Impact of ICT
-
-
-
5
-
-
84890900309
-
A feasibility study for the detached cell concept
-
Jan.
-
E. Ternon, Z. Bharucha, and H. Taoka, "A Feasibility Study for the Detached Cell Concept," in SCC 2013, Jan. 2013
-
(2013)
SCC 2013
-
-
Ternon, E.1
Bharucha, Z.2
Taoka, H.3
-
6
-
-
84911956236
-
-
3rd Generation Partnership Project (3GPP), Technical Specification Group Radio Access Network, 3GPP TSG RAN WG1 R1-133456, 3GPP Std. R1-133 456, Aug
-
3rd Generation Partnership Project (3GPP), Technical Specification Group Radio Access Network, Views on Small Cell On/Off Mechanisms, 3GPP TSG RAN WG1 R1-133456, 3GPP Std. R1-133 456, Aug. 2013
-
(2013)
Views on Small Cell On/Off Mechanisms
-
-
-
7
-
-
84912109577
-
-
Enhancements of small cell on/off, 3GPP TSG RAN WG1 R1-132888, 3GPP Std. R1-132 888, Aug. 2013
-
-, Enhancements of small cell on/off, 3GPP TSG RAN WG1 R1-132888, 3GPP Std. R1-132 888, Aug. 2013
-
-
-
-
8
-
-
84912131102
-
-
Evaluation results for small cell on/off in SCE scenario 2a, 3GPP TSG RAN WG1 R1-133104, 3GPP Std. R1-133 104, Aug. 2013
-
-, Evaluation results for small cell on/off in SCE scenario 2a, 3GPP TSG RAN WG1 R1-133104, 3GPP Std. R1-133 104, Aug. 2013
-
-
-
-
9
-
-
84912109575
-
-
Evolved Universal Terrestrial Radio Access (E-UTRA); LTE Positioning Protocol (LPP) (Release 11), 3GPP TS 36. 355 V11. 3. 0, 3GPP Std., Jun. 2013
-
-, Evolved Universal Terrestrial Radio Access (E-UTRA); LTE Positioning Protocol (LPP) (Release 11), 3GPP TS 36. 355 V11. 3. 0, 3GPP Std., Jun. 2013
-
-
-
-
10
-
-
80051999588
-
Reducing energy consumption in lte with cell dtx
-
P. Frenger, P. Moberg, J. Malmodin, Y. Jading, and I. Gódor, "Reducing Energy Consumption in LTE with Cell DTX," in Proceedings of the IEEE VTC 2011-Spring, 2011
-
(2011)
Proceedings of the IEEE VTC 2011-Spring
-
-
Frenger, P.1
Moberg, P.2
Malmodin, J.3
Jading, Y.4
Gódor, I.5
-
11
-
-
84911984107
-
-
EARTH Project Work Package 4, Jun. 2012, retrieved Apr. 18
-
EARTH Project Work Package 4, "Deliverable D4. 3: Final Report on Green Radio Technologies," https://www. ictearth. eu/publications/deliverables/deliverables. html, Jun. 2012, retrieved Apr. 18, 2013
-
(2013)
Deliverable D4. 3: Final Report on Green Radio Technologies
-
-
-
12
-
-
84905027074
-
-
3rd Generation Partnership Project (3GPP), Technical Specification Group Radio Access Network, 3GPP TSG RAN WG1 R1-130750, 3GPP Std. R1-130 750, Feb
-
3rd Generation Partnership Project (3GPP), Technical Specification Group Radio Access Network, Evaluation assumptions for small cells enhancements-physical layer, 3GPP TSG RAN WG1 R1-130750, 3GPP Std. R1-130 750, Feb. 2013
-
(2013)
Evaluation Assumptions for Small Cells Enhancements-physical Layer
-
-
-
14
-
-
84893225128
-
-
TR 36. 814 V9. 0. 0, www. 3gpp. org/ftp/Specs/, Std., Mar. 2010, retrieved 15 Jan.
-
-, Further Advancements for E-UTRA Physical Layer Aspects (Release 9), TR 36. 814 V9. 0. 0, www. 3gpp. org/ftp/Specs/, Std., Mar. 2010, retrieved 15 Jan. 2013
-
(2013)
Further Advancements for E-UTRA Physical Layer Aspects (Release 9)
-
-
-
15
-
-
84875670654
-
B4G local area: High level requirements and system design
-
P. Mogensen, K. Pajukoski, B. Raaf, E. Tiirola, E. Lahetkangas, I. Kovacs, G. Berardinelli, L. Garcia, L. Hu, and A. Cattoni, "B4G local area: High level requirements and system design," in Globecom Workshops (GC Wkshps), 2012 IEEE, 2012, pp. 613-617
-
(2012)
Globecom Workshops (GC Wkshps), 2012 IEEE
, pp. 613-617
-
-
Mogensen, P.1
Pajukoski, K.2
Raaf, B.3
Tiirola, E.4
Lahetkangas, E.5
Kovacs, I.6
Berardinelli, G.7
Garcia, L.8
Hu, L.9
Cattoni, A.10
|