메뉴 건너뛰기




Volumn 27, Issue , 2015, Pages 137-147

A self-adaptive PSO for joint lot sizing and job shop scheduling with compressible process times

Author keywords

Job shop; Lot sizing; Particle swarm optimization (PSO); Process compressibility; Scheduling; Self adaptivity

Indexed keywords

COMPRESSIBILITY; PRODUCTION CONTROL; SCHEDULING;

EID: 84912093473     PISSN: 15684946     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.asoc.2014.10.015     Document Type: Article
Times cited : (49)

References (24)
  • 1
    • 0022234268 scopus 로고
    • Simultaneous lot sizing and sequencing for multistage production systems
    • P. Afentakis Simultaneous lot sizing and sequencing for multistage production systems IIE Trans. 17 1985 327 331
    • (1985) IIE Trans. , vol.17 , pp. 327-331
    • Afentakis, P.1
  • 2
    • 34147159638 scopus 로고    scopus 로고
    • A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
    • F.S. Al-Anzi, and A. Allahverdi A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times Eur. J. Oper. Res. 182 2007 80 94
    • (2007) Eur. J. Oper. Res. , vol.182 , pp. 80-94
    • Al-Anzi, F.S.1    Allahverdi, A.2
  • 4
    • 0037058522 scopus 로고    scopus 로고
    • Integrated material planning and operations scheduling (IMPOS)
    • H. Fallah, and E. Shayan Integrated material planning and operations scheduling (IMPOS) Int. J. Prod. Res. 40 2002 4285 4304
    • (2002) Int. J. Prod. Res. , vol.40 , pp. 4285-4304
    • Fallah, H.1    Shayan, E.2
  • 5
    • 0012712572 scopus 로고    scopus 로고
    • A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods
    • B. Franck, K. Neumann, and C. Schwindt A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods OR Spektrum 19 1997 77 85
    • (1997) OR Spektrum , vol.19 , pp. 77-85
    • Franck, B.1    Neumann, K.2    Schwindt, C.3
  • 6
    • 0032216046 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes
    • M.G. Ierapetritou, and C.A. Floudas Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes Ind. Eng. Chem. Res. 37 1998 4360 4374
    • (1998) Ind. Eng. Chem. Res. , vol.37 , pp. 4360-4374
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 7
    • 54249105631 scopus 로고    scopus 로고
    • Short-term scheduling of batch plants with multiple intermediate due dates
    • M.G. Ierapetritou, T.S. Hene, and C.A. Floudas Short-term scheduling of batch plants with multiple intermediate due dates Comput. Chem. Eng. 23 1999 515 518
    • (1999) Comput. Chem. Eng. , vol.23 , pp. 515-518
    • Ierapetritou, M.G.1    Hene, T.S.2    Floudas, C.A.3
  • 8
    • 0041511823 scopus 로고    scopus 로고
    • The capacitated lot sizing problem: A review of models and algorithms
    • B. Karimi, S.M.T. Fatemi Ghomi, and J.M. Wilson The capacitated lot sizing problem: a review of models and algorithms Omega 31 2003 365 378
    • (2003) Omega , vol.31 , pp. 365-378
    • Karimi, B.1    Fatemi Ghomi, S.M.T.2    Wilson, J.M.3
  • 10
    • 0030244109 scopus 로고    scopus 로고
    • Simulated annealing and genetic algorithms for scheduling products with multi-level product structure
    • J.U. Kim, and Y.D. Kim Simulated annealing and genetic algorithms for scheduling products with multi-level product structure Comput. Oper. Res. 23 1996 857 868
    • (1996) Comput. Oper. Res. , vol.23 , pp. 857-868
    • Kim, J.U.1    Kim, Y.D.2
  • 11
    • 77955090318 scopus 로고    scopus 로고
    • Evolutionary self-adaptation: A survey of operators and strategy parameters
    • O. Kramer Evolutionary self-adaptation: a survey of operators and strategy parameters Evolut. Intell. 3 2010 51 65
    • (2010) Evolut. Intell. , vol.3 , pp. 51-65
    • Kramer, O.1
  • 12
    • 0037054916 scopus 로고    scopus 로고
    • Uncertainty under MRP-planned manufacture: Review and categorization
    • S.C.L. Koh, S.M. Saad, and M.H. Jones Uncertainty under MRP-planned manufacture: review and categorization Int. J. Prod. Res. 40 2002 2399 2421
    • (2002) Int. J. Prod. Res. , vol.40 , pp. 2399-2421
    • Koh, S.C.L.1    Saad, S.M.2    Jones, M.H.3
  • 13
    • 70249093672 scopus 로고    scopus 로고
    • Integration of production planning and scheduling: Overview, challenges and opportunities
    • C.T. Maravelias, and C. Sung Integration of production planning and scheduling: overview, challenges and opportunities Comput. Chem. Eng. 33 2009 1919 1930
    • (2009) Comput. Chem. Eng. , vol.33 , pp. 1919-1930
    • Maravelias, C.T.1    Sung, C.2
  • 14
    • 1342264261 scopus 로고    scopus 로고
    • The effect of various operators on the genetic search for large scheduling problems
    • A.C. Nearchou The effect of various operators on the genetic search for large scheduling problems Int. J. Prod. Econ. 88 2004 191 203
    • (2004) Int. J. Prod. Econ. , vol.88 , pp. 191-203
    • Nearchou, A.C.1
  • 15
    • 0036507655 scopus 로고    scopus 로고
    • Production planning for a project job shop, with application to disassembly, evaluation and maintenance of nuclear weapons
    • L.K. Nozick, M.A. Turnquist, C.R. Lawton, G.F. List, D.A. Jones, S.T. Wright, and E.A. Kjeldgaard Production planning for a project job shop, with application to disassembly, evaluation and maintenance of nuclear weapons Prod. Plan. Control 13 2002 187 198
    • (2002) Prod. Plan. Control , vol.13 , pp. 187-198
    • Nozick, L.K.1    Turnquist, M.A.2    Lawton, C.R.3    List, G.F.4    Jones, D.A.5    Wright, S.T.6    Kjeldgaard, E.A.7
  • 16
    • 0035546154 scopus 로고    scopus 로고
    • The finite horizon economic lot sizing problem in job shops: The multiple cycle approach
    • J. Ouenniche, and J.W.M. Bertrand The finite horizon economic lot sizing problem in job shops: the multiple cycle approach Int. J. Prod. Econ. 74 2001 49 61
    • (2001) Int. J. Prod. Econ. , vol.74 , pp. 49-61
    • Ouenniche, J.1    Bertrand, J.W.M.2
  • 18
    • 84974861854 scopus 로고
    • Integrated scheduling with batching and lot sizing: A review of algorithms and complexity
    • C.N. Potts, and L.N. van Wassenhove Integrated scheduling with batching and lot sizing: a review of algorithms and complexity J. Oper. Res. Soc. 43 1992 395 406
    • (1992) J. Oper. Res. Soc. , vol.43 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 19
    • 84655176746 scopus 로고    scopus 로고
    • A discrete particle swarm optimization algorithm with self-adaptive diversity control for the permutation flowshop problem with blocking
    • X. Wang, and L. Tang A discrete particle swarm optimization algorithm with self-adaptive diversity control for the permutation flowshop problem with blocking Appl. Soft Comput. 12 2012 652 662
    • (2012) Appl. Soft Comput. , vol.12 , pp. 652-662
    • Wang, X.1    Tang, L.2
  • 21
    • 69649103114 scopus 로고    scopus 로고
    • A resource-constrained assembly job shop scheduling problem with lot streaming technique
    • T.C. Wong, F.T.S. Chan, and L.Y. Chan A resource-constrained assembly job shop scheduling problem with lot streaming technique Comput. Ind. Eng. 57 2009 983 995
    • (2009) Comput. Ind. Eng. , vol.57 , pp. 983-995
    • Wong, T.C.1    Chan, F.T.S.2    Chan, L.Y.3
  • 22
    • 33748492325 scopus 로고    scopus 로고
    • Scheduling and lot sizing with sequence-dependent setup: A literature review
    • X. Zhu, and W.E. Wilhelm Scheduling and lot sizing with sequence-dependent setup: a literature review IIE Trans. 38 2006 987 1007
    • (2006) IIE Trans. , vol.38 , pp. 987-1007
    • Zhu, X.1    Wilhelm, W.E.2
  • 23
    • 0001775820 scopus 로고    scopus 로고
    • Batch scheduling in process industries: An application of resource-constrained project scheduling
    • C. Schwindt, and N. Trautmann Batch scheduling in process industries: an application of resource-constrained project scheduling OR Spektrum 22 2000 501 524
    • (2000) OR Spektrum , vol.22 , pp. 501-524
    • Schwindt, C.1    Trautmann, N.2
  • 24
    • 72049116023 scopus 로고    scopus 로고
    • Capacitated lot sizing with linked lots for general product structures in job shops
    • C. Oztürk, and A.M. Ornek Capacitated lot sizing with linked lots for general product structures in job shops Comput. Ind. Eng. 58 2010 151 164
    • (2010) Comput. Ind. Eng. , vol.58 , pp. 151-164
    • Oztürk, C.1    Ornek, A.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.