-
1
-
-
85141447571
-
Generation and local improvement of execution schedules using constraint-based simulation. Proc. of the 12th Int.Conf
-
Beijing, China
-
Beißert, U., König, M. and Bargstädt, H.-J. 2008. Generation and local improvement of execution schedules using constraint-based simulation. Proc. of the 12th Int.Conf. on Computing in Civil and Building Engineering (ICCCBE-XII). Beijing, China.
-
(2008)
On Computing in Civil and Building Engineering (ICCCBE-XII)
-
-
Beißert, U.1
König, M.2
Bargstädt, H.-J.3
-
2
-
-
85141469992
-
MFC—A Modular Line Camera for 3D World Modulling. Proc. of the 2nd Int
-
Börner, A. Hirschmüller, H., Scheibe, K., Suppa, M. and Wohlfeil, J. 2008. MFC—A Modular Line Camera for 3D World Modulling. Proc. of the 2nd Int. Workshop on Robot Vision.
-
(2008)
Workshop on Robot Vision
-
-
Börner1
Hirschmüller, A.H.2
Scheibe, K.3
Suppa, M.4
Wohlfeil, J.5
-
3
-
-
85141540559
-
-
2009 ASCE International Workshop on Computing in Civil Engineering. Austin, TX, USA
-
Borrmann, A., Schorr, M., Obergriesser, M., Ji, Y., Wu, I-C., Günthner, W., Euringer, T. and Rank, E. 2009. Using Product Data Management Systems for Civil Engineering Projects—Potentials and Obstacles. Proc. of the 2009 ASCE International Workshop on Computing in Civil Engineering. Austin, TX, USA.
-
(2009)
Using Product Data Management Systems for Civil Engineering Projects—Potentials and Obstacles. Proc. of The
-
-
Borrmann, A.1
Schorr, M.2
Obergriesser, M.3
Ji, Y.4
Wu, I.-C.5
Günthner, W.6
Euringer, T.7
Rank, E.8
-
4
-
-
0004087483
-
-
Modeling Spatial Uncertainty, Wiley Series in Probability and statistics
-
Chiles, J.-P. and Delfiner, P. 1999. Geostatistics, Modeling Spatial Uncertainty, Wiley Series in Probability and statistics.
-
(1999)
Geostatistics
-
-
Chiles, J.-P.1
Delfiner, P.2
-
5
-
-
36348967772
-
Energy-efficient Autonomous Four-rotor Flying Robot Controlled at 1 kHz
-
Gurdan, D., Stumpf, J., Achtelik, M., Doth, K-M., Hirzinger, G. and Rus, D. 2007. “Energy-efficient Autonomous Four-rotor Flying Robot Controlled at 1 kHz”, Proc. of the 2007 IEEE International Conference on Robotics and Automation.
-
(2007)
Proc. of the 2007 IEEE International Conference on Robotics and Automation
-
-
Gurdan, D.1
Stumpf, J.2
Achtelik, M.3
Doth, K.-M.4
Hirzinger, G.5
Rus, D.6
-
8
-
-
85141493430
-
An Integrated 3D Simulation Framework for Earthwork Processes. Proc
-
in Construction
-
Ji, Y., Borrmann, A., Rank, E., Wimmer, J. and Günthner, W. 2009. An Integrated 3D Simulation Framework for Earthwork Processes. Proc. of the 26th CIB-W78 Conference on Managing IT in Construction.
-
(2009)
Of the 26Th CIB-W78 Conference on Managing IT
-
-
Ji, Y.1
Borrmann, A.2
Rank, E.3
Wimmer, J.4
Günthner, W.5
-
9
-
-
85141530999
-
Parametric Description of Bridge Structures Proc. of the IABSE Conference on Information and Communication Technology for Bridges
-
Katz, C. 2008. Parametric Description of Bridge Structures Proc. of the IABSE Conference on Information and Communication Technology for Bridges, Building and Construction Practice.
-
(2008)
Building and Construction Practice
-
-
Katz, C.1
-
10
-
-
85141533640
-
-
GroundXML—an addition of alignment and subsoil specific cross-sectional data to the LandXML schema. The Twelfth International Conference on Civil, Structural and Environmental Engineering Computing
-
Kiviniemi, A., Fischer, M. and Bazjanac, V. 2005. Integration of Multiple Product Models: IFC Model Servers as a Potential Solution. Proc. of the 22nd CIB-W78 Conference on Information Technology in Construction. Obergrießer, M., Ji, Y., Euringer, T., Borrmann, A. and Rank, E. 2009. GroundXML—an addition of alignment and subsoil specific cross-sectional data to the LandXML schema. The Twelfth International Conference on Civil, Structural and Environmental Engineering Computing.
-
(2005)
Integration of Multiple Product Models: IFC Model Servers as a Potential Solution. Proc. of the 22Nd CIB-W78 Conference on Information Technology in Construction. Obergrießer, M., Ji, Y., Euringer, T., Borrmann, A. and
, pp. 2009
-
-
Kiviniemi, A.1
Fischer, M.2
Bazjanac, V.3
Rank, E.4
-
11
-
-
1642618587
-
Parametric 3D Modeling in Building Construction with Examples from Precast Concrete
-
Sacks, R., Eastman, C.M. and Lee, G. 2004. Parametric 3D Modeling in Building Construction with Examples from Precast Concrete. Automation in Construction, 13(3): 291–312.
-
(2004)
Automation in Construction
, vol.13
, Issue.3
, pp. 291-312
-
-
Sacks, R.1
Eastman, C.M.2
Lee, G.3
-
12
-
-
85141475445
-
-
Proc. of the 26th CIB-W78 Conference on Managing IT in Construction
-
Wu, I.C., Borrmann, A., Rank, E., Beißert, U. and König, M. A Pattern-Based Approach for Facilitating Schedule Generation and Cost Analysis in Bridge Construction Projects. Proc. of the 26th CIB-W78 Conference on Managing IT in Construction.
-
A Pattern-Based Approach for Facilitating Schedule Generation and Cost Analysis in Bridge Construction Projects
-
-
Wu, I.C.1
Borrmann, A.2
Rank, E.3
Beißert, U.4
König, M.5
-
13
-
-
58149255879
-
International collaboration for developing the bridge product model IFC-Bridge. Proc. of the 11th Int
-
Yabuki, N., Lebegue, E., Gual, J., Shitani, T. and Zhantao, L. 2006. International collaboration for developing the bridge product model IFC-Bridge. Proc. of the 11th Int. Conf on Computing in Civil and Building Engineering.
-
(2006)
Conf on Computing in Civil and Building Engineering
-
-
Yabuki, N.1
Lebegue, E.2
Gual, J.3
Shitani, T.4
Zhantao, L.5
|