-
1
-
-
78649442230
-
-
Cambridge University Press Cambridge, United Kingdom
-
Intergovernmental Panel on Climate Change (IPCC) IPCC's Fourth Assessment Report (AR4) 2007 Cambridge University Press Cambridge, United Kingdom
-
(2007)
IPCC's Fourth Assessment Report (AR4)
-
-
-
2
-
-
0004259967
-
-
China Statistics Press Beijing, China (in Chinese)
-
Department of Energy Statistics, National Bureau of Statistics, People's Republic of China China Energy Statistical Yearbook 2011 China Statistics Press Beijing, China (in Chinese)
-
(2011)
China Energy Statistical Yearbook
-
-
-
3
-
-
79955420809
-
2capture process: Flowsheeting and energetic integration
-
2capture process: flowsheeting and energetic integration Energy Proc. 4 2011 1303 1309
-
(2011)
Energy Proc.
, vol.4
, pp. 1303-1309
-
-
Moullec, Y.L.1
Kanniche, M.2
-
4
-
-
33947387930
-
2
-
2Energy 32 2007 1163 1176
-
(2007)
Energy
, vol.32
, pp. 1163-1176
-
-
Davison, J.1
-
5
-
-
34250789296
-
2capture unit using single- and blended-amines into supercritical coal-fired power plants: Implications for emission and energy management
-
2capture unit using single- and blended-amines into supercritical coal-fired power plants: implications for emission and energy management Int. J. Greenhouse Gas Control 1 2007 143 150
-
(2007)
Int. J. Greenhouse Gas Control
, vol.1
, pp. 143-150
-
-
Aroonwilas, A.1
Veawab, A.2
-
6
-
-
51449104259
-
2-capture from coal-fired power plants: Preliminary evaluation of an integrated chemical absorption process with piperazine-promoted potassium carbonate
-
2-capture from coal-fired power plants: preliminary evaluation of an integrated chemical absorption process with piperazine-promoted potassium carbonate Int. J. Greenhouse Gas Control 2 2008 539 552
-
(2008)
Int. J. Greenhouse Gas Control
, vol.2
, pp. 539-552
-
-
Oexmann, J.1
Hensel, C.2
Kather, A.3
-
7
-
-
84863464542
-
2capture in power plants: Minimization of the investment and operating cost of the post-combustion process using MEA aqueous solution
-
2capture in power plants: minimization of the investment and operating cost of the post-combustion process using MEA aqueous solution Int. J. Greenhouse Gas Control 10 2012 148 163
-
(2012)
Int. J. Greenhouse Gas Control
, vol.10
, pp. 148-163
-
-
Mores, P.1
Rodríguez, N.2
Scenna, N.3
-
8
-
-
84878237511
-
Influence of stripper operating parameters on the performance of amine absorption systems for post-combustion carbon capture: Part 1. High pressure strippers
-
S.S. Warudkar, K.R. Cox, and M.S. Wong Influence of stripper operating parameters on the performance of amine absorption systems for post-combustion carbon capture: part 1. High pressure strippers Int. J. Greenhouse Gas Control 16 2013 342 350
-
(2013)
Int. J. Greenhouse Gas Control
, vol.16
, pp. 342-350
-
-
Warudkar, S.S.1
Cox, K.R.2
Wong, M.S.3
-
13
-
-
67549114460
-
2capture-ready fossil plants with post-combustion capture. Part1: Requirements for supercritical pulverized coal plants using solvent-based flue gas scrubbing
-
2capture-ready fossil plants with post-combustion capture. Part1: requirements for supercritical pulverized coal plants using solvent-based flue gas scrubbing Power Energy 223 2009 427 438
-
(2009)
Power Energy
, vol.223
, pp. 427-438
-
-
Lucquiaud, M.1
Gibbins, J.2
-
15
-
-
79960737829
-
2capture with coal-fired power plants: A methodology to assess and optimise solvent-based post-combustion capture systems
-
2capture with coal-fired power plants: a methodology to assess and optimise solvent-based post-combustion capture systems Chem. Eng. Res. Des. 89 2011 1553 1571
-
(2011)
Chem. Eng. Res. Des.
, vol.89
, pp. 1553-1571
-
-
Lucquiaud, M.1
Gibbins, J.2
-
18
-
-
84881108203
-
2capture in an existing coal-fired power plant in China
-
2capture in an existing coal-fired power plant in China Energy 58 2013 117 127
-
(2013)
Energy
, vol.58
, pp. 117-127
-
-
Xu, G.1
Yang, Y.P.2
Ding, J.3
-
19
-
-
33746215314
-
-
Science Press Beijing, China
-
Sokolov Ejector 1977 Science Press Beijing, China 1 39
-
(1977)
Ejector
, pp. 1-39
-
-
Sokolov1
-
20
-
-
34250762201
-
2capture from power plants: Part I. A parametric study of the technical performance based on monoethanolamine
-
2capture from power plants: part I. A parametric study of the technical performance based on monoethanolamine Int. J. Greenhouse Gas Control 1 2007 37 46
-
(2007)
Int. J. Greenhouse Gas Control
, vol.1
, pp. 37-46
-
-
Mohammad, R.M.1
Schneiders, H.J.2
John, P.M.3
-
22
-
-
84883127449
-
2capture from power stations running with natural gas and pulverized coal: Assessment of a new chemical solvent TriEthylene TetrAmine
-
2capture from power stations running with natural gas and pulverized coal: assessment of a new chemical solvent TriEthylene TetrAmine Energy Proc. 1 2009 909 916
-
(2009)
Energy Proc.
, vol.1
, pp. 909-916
-
-
Jean-Marc, G.A.1
Chakib, B.2
-
23
-
-
80052260503
-
An energetic-exergetic analysis of a residential CHP system based on PEM fuel cell
-
L. Barelli, G. Bidini, and F. Gallorini An energetic-exergetic analysis of a residential CHP system based on PEM fuel cell Appl. Energy 88 2011 4334-4342
-
(2011)
Appl. Energy
, vol.88
, pp. 4334-4342
-
-
Barelli, L.1
Bidini, G.2
Gallorini, F.3
-
25
-
-
84877344067
-
Analytical model-based energy and exergy analysis of a gas microturbine at part-load operation
-
L. Malinowski, and M. Lewandowska Analytical model-based energy and exergy analysis of a gas microturbine at part-load operation Appl. Therm. Eng. 57 2013 125 132
-
(2013)
Appl. Therm. Eng.
, vol.57
, pp. 125-132
-
-
Malinowski, L.1
Lewandowska, M.2
-
27
-
-
77955175490
-
2capture in Huaneng Beijing coal-fired power station
-
2capture in Huaneng Beijing coal-fired power station Appl. Energy 87 2010 3347 3354
-
(2010)
Appl. Energy
, vol.87
, pp. 3347-3354
-
-
Huang, B.1
Xu, S.S.2
Gao, S.W.3
-
28
-
-
67649535133
-
2capture in Huaneng Beijing coal-fired power station
-
2capture in Huaneng Beijing coal-fired power station Proc. CSEE 29 2009 14 20
-
(2009)
Proc. CSEE
, vol.29
, pp. 14-20
-
-
Huang, B.1
Xu, S.S.2
Gao, S.W.3
-
29
-
-
84878242330
-
2purification. Part II: Techno-economic evaluation of oxygen and water deep removal processes
-
2purification. Part II: techno-economic evaluation of oxygen and water deep removal processes Int. J. Greenhouse Gas Control 16 2013 335 341
-
(2013)
Int. J. Greenhouse Gas Control
, vol.16
, pp. 335-341
-
-
Abbas, Z.1
Mezher, T.2
Abu-Zahra, M.R.M.3
-
31
-
-
34247526928
-
A process model to estimate the cost of industrial scale biodiesel production from waste cooking oil by supercritical transesterification
-
J.M.N.V. Kasteren, and A.P. Nisworo A process model to estimate the cost of industrial scale biodiesel production from waste cooking oil by supercritical transesterification Resour. Conserv. Recycl. 50 2007 442 458
-
(2007)
Resour. Conserv. Recycl.
, vol.50
, pp. 442-458
-
-
Kasteren, J.M.N.V.1
Nisworo, A.P.2
-
32
-
-
84874684775
-
Experimental study and techno-economical evaluation of Khangiran sour natural gas condensate desulfurization process
-
E. Moaseri, O. Mostaghisi, and A. Shahsavand Experimental study and techno-economical evaluation of Khangiran sour natural gas condensate desulfurization process Int. J. Nat. Gas Sci. Eng 12 2013 34 42
-
(2013)
Int. J. Nat. Gas Sci. Eng
, vol.12
, pp. 34-42
-
-
Moaseri, E.1
Mostaghisi, O.2
Shahsavand, A.3
-
34
-
-
15944402866
-
2from coal with commercially ready technology. Part B: Economic analysis
-
2from coal with commercially ready technology. Part B: economic analysis Int. J. Hydrogen Energy 30 2005 769 784
-
(2005)
Int. J. Hydrogen Energy
, vol.30
, pp. 769-784
-
-
Thomas, B.1
Robert, W.2
Stefano, C.3
|