메뉴 건너뛰기




Volumn 27, Issue 3, 2014, Pages 388-399

Schedule restoration for single-armed cluster tools

Author keywords

Cluster tool; discrete event systems; Petri nets; scheduling

Indexed keywords

ALGEBRA; DISCRETE EVENT SIMULATION; PETRI NETS; SCHEDULING; STOCHASTIC SYSTEMS; UNCERTAINTY ANALYSIS;

EID: 84905857105     PISSN: 08946507     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSM.2014.2315871     Document Type: Article
Times cited : (25)

References (50)
  • 1
    • 27644434964 scopus 로고    scopus 로고
    • An extended event graph with negative places and tokens for time window constraints
    • DOI 10.1109/TASE.2005.851236
    • T.-E. Lee and S.-H. Park, "An extended event graph with negative places and negative tokens for time window constraints, " IEEE Trans. Autom. Sci. Eng., vol. 2, no. 4, pp. 319-332, Oct. 2005. (Pubitemid 41560387)
    • (2005) IEEE Transactions on Automation Science and Engineering , vol.2 , Issue.4 , pp. 319-332
    • Lee, T.-E.1    Park, S.-H.2
  • 2
    • 79952626067 scopus 로고    scopus 로고
    • A graph-based analysis of the cycic scheduling problem with time constraints; Schedulability and periodicity of the earliest schedule
    • Feb
    • A. M. Kordon, "A graph-based analysis of the cycic scheduling problem with time constraints; schedulability and periodicity of the earliest schedule, " J. Sched., vol. 14, pp. 103-117, Feb. 2011.
    • (2011) J. Sched , vol.14 , pp. 103-117
    • Kordon, A.M.1
  • 3
    • 0028413052 scopus 로고
    • A theory of timed automata
    • Apr
    • R. Alur and D. L. Dill, "A theory of timed automata, " Theor. Comput. Sci., vol. 126, no. 2, pp. 183-235, Apr. 1994.
    • (1994) Theor. Comput. Sci , vol.126 , Issue.2 , pp. 183-235
    • Alur, R.1    Dill, D.L.2
  • 5
    • 0005861308 scopus 로고    scopus 로고
    • P-time Petri nets for manufacturing systems with staying time constraints
    • May
    • S. Calvez, P. Aygalinc, and W. Khansa, "P-time Petri nets for manufacturing systems with staying time constraints, " in Proc. IFAC CIS, May 1997, pp. 495-500.
    • (1997) Proc. IFAC CIS , pp. 495-500
    • Calvez, S.1    Aygalinc, P.2    Khansa, W.3
  • 7
    • 0035333368 scopus 로고    scopus 로고
    • Optimal cyclic scheduling of a robotic processing line with two-product and time-window constraints
    • L. Lei and Q. Liu, "Optimal cyclic scheduling of a robotic processing line with two-product and time-window constraints, " INFOR, vol. 39, pp. 185-199, May 2001. (Pubitemid 32496038)
    • (2001) INFOR , vol.39 , Issue.2 , pp. 185-199
    • Lei, L.1    Liu, Q.2
  • 8
    • 84960924881 scopus 로고
    • Interval timed coloured Petri nets and their analysis
    • Chicago, IL, USA
    • W. Aalst, "Interval timed coloured Petri nets and their analysis, " in Proc. Lect. Notes Comput. Sci., Chicago, IL, USA, 1993, pp. 453-472.
    • (1993) Proc. Lect. Notes Comput. Sci , pp. 453-472
    • Aalst, W.1
  • 9
    • 77955700913 scopus 로고    scopus 로고
    • Complexity of cyclic scheduling problems: A state-of-the-art survey
    • E. Levner, V. Kats, D. A. L. de Pablo, and T. Cheng, "Complexity of cyclic scheduling problems: A state-of-the-art survey, " Comput. Ind. Eng., vol. 59, no. 2, pp. 352-361, 2010.
    • (2010) Comput. Ind. Eng , vol.59 , Issue.2 , pp. 352-361
    • Levner, E.1    Kats, V.2    De Pablo, D.A.L.3    Cheng, T.4
  • 10
    • 84873384586 scopus 로고    scopus 로고
    • A Petri net-based novel scheduling approach and its cycle time analysis for dual-arm cluster tools with wafer revisiting
    • Feb
    • Y. Qiao, N. Wu, and M. Zhou, "A Petri net-based novel scheduling approach and its cycle time analysis for dual-arm cluster tools with wafer revisiting, " IEEE Trans. Semicond. Manuf., vol. 26, no. 1, pp. 100-110, Feb. 2013.
    • (2013) IEEE Trans. Semicond. Manuf , vol.26 , Issue.1 , pp. 100-110
    • Qiao, Y.1    Wu, N.2    Zhou, M.3
  • 11
    • 84887067395 scopus 로고    scopus 로고
    • Petri net modeling and cycle time analysis of dual-arm cluster tools with wafer revisiting
    • Jan
    • N. Wu, F. Chu, C. B. Chu, and C. M. Zhou, "Petri net modeling and cycle time analysis of dual-arm cluster tools with wafer revisiting, " IEEE Trans. Syst., Man, Cybern., Syst., vol. 43, no. 1, pp. 196-207, Jan. 2013.
    • (2013) IEEE Trans. Syst., Man, Cybern., Syst , vol.43 , Issue.1 , pp. 196-207
    • Wu, N.1    Chu, F.2    Chu, C.B.3    Zhou, C.M.4
  • 12
    • 84887980429 scopus 로고    scopus 로고
    • Petri net-based optimal one-wafer scheduling of single-arm multi-cluster tools in semiconductor manufacturing
    • Nov
    • Q. Zhu, N. Wu, Y. Qiao, and M. Zhou, "Petri net-based optimal one-wafer scheduling of single-arm multi-cluster tools in semiconductor manufacturing, " IEEE Trans. Semicond. Manuf., vol. 26, no. 4, pp. 578-591, Nov. 2013.
    • (2013) IEEE Trans. Semicond. Manuf , vol.26 , Issue.4 , pp. 578-591
    • Zhu, Q.1    Wu, N.2    Qiao, Y.3    Zhou, M.4
  • 13
    • 84900817063 scopus 로고    scopus 로고
    • Petri net-based optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in wafer fabrication
    • Mar
    • F. Yang, N. Wu, Y. Qiao, and M. Zhou, "Petri net-based optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in wafer fabrication, " IEEE Trans. Semicond. Manuf., no. 99, p. 1, Mar. 2014.
    • (2014) IEEE Trans. Semicond. Manuf , Issue.99 , pp. 1
    • Yang, F.1    Wu, N.2    Qiao, Y.3    Zhou, M.4
  • 14
    • 84905834944 scopus 로고    scopus 로고
    • Petri net-based polynomially complex approach to optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in semiconductor manufacturing
    • F. Yang, N. Wu, Y. Qiao, and M. Zhou, "Petri net-based polynomially complex approach to optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in semiconductor manufacturing, " IEEE Trans. Syst., Man, Cybern., Syst., 2014.
    • (2014) IEEE Trans. Syst., Man, Cybern., Syst
    • Yang, F.1    Wu, N.2    Qiao, Y.3    Zhou, M.4
  • 15
    • 0041384559 scopus 로고    scopus 로고
    • Scheduling analysis of time-constrained dual-armed cluster tools
    • Aug
    • J.-H. Kim, T.-E. Lee, H.-Y. Lee, and D.-B. Park, "Scheduling analysis of time-constrained dual-armed cluster tools, " IEEE Trans. Semicond. Manuf., vol. 16, no. 3, pp. 521-534, Aug. 2003.
    • (2003) IEEE Trans. Semicond. Manuf , vol.16 , Issue.3 , pp. 521-534
    • Kim, J.-H.1    Lee, T.-E.2    Lee, H.-Y.3    Park, D.-B.4
  • 16
    • 0035485501 scopus 로고    scopus 로고
    • An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
    • DOI 10.1109/70.964662, PII S1042296X01094666
    • S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints, " IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 609-618, Oct. 2001. (Pubitemid 33137777)
    • (2001) IEEE Transactions on Robotics and Automation , vol.17 , Issue.5 , pp. 609-618
    • Rostami, S.1    Hamidzadeh, B.2    Camporese, D.3
  • 17
    • 43849109024 scopus 로고    scopus 로고
    • A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
    • May
    • N. Q. Wu, C. B. Chu, F. Chu, and M. C. Zhou, "A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints, " IEEE Trans. Semicond. Manuf., vol. 21, no. 2, pp. 224-237, May 2008.
    • (2008) IEEE Trans. Semicond. Manuf , vol.21 , Issue.2 , pp. 224-237
    • Wu, N.Q.1    Chu, C.B.2    Chu, F.3    Zhou, M.C.4
  • 19
    • 84864687325 scopus 로고    scopus 로고
    • Petri net modeling and wafer sojourn time analysis of single-arm cluster tools with residency time constraints and activity time variation
    • Aug
    • Y. Qiao, N. Wu, and M. Zhou, "Petri net modeling and wafer sojourn time analysis of single-arm cluster tools with residency time constraints and activity time variation, " IEEE Trans. Semicond. Manuf., vol. 25, no. 3, pp. 432-446, Aug. 2012.
    • (2012) IEEE Trans. Semicond. Manuf , vol.25 , Issue.3 , pp. 432-446
    • Qiao, Y.1    Wu, N.2    Zhou, M.3
  • 20
    • 84863456306 scopus 로고    scopus 로고
    • Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation
    • Jul
    • Y. Qiao, N. Wu, and M. Zhou, "Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation, " IEEE Trans. Autom. Sci. Eng., vol. 9, no. 3, pp. 564-577, Jul. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng , vol.9 , Issue.3 , pp. 564-577
    • Qiao, Y.1    Wu, N.2    Zhou, M.3
  • 21
    • 46849094532 scopus 로고    scopus 로고
    • Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net
    • Aug
    • J.-H. Kim and T.-E. Lee, "Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net, " IEEE Trans. Autom. Sci. Eng., vol. 5, no. 3, pp. 490-503, Aug. 2008.
    • (2008) IEEE Trans. Autom. Sci. Eng , vol.5 , Issue.3 , pp. 490-503
    • Kim, J.-H.1    Lee, T.-E.2
  • 22
    • 84859753478 scopus 로고    scopus 로고
    • Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets
    • Apr
    • N. Wu and M. Zhou, "Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets, " IEEE Trans. Autom. Sci. Eng., vol. 9, no. 2, pp. 446-454, Apr. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng , vol.9 , Issue.2 , pp. 446-454
    • Wu, N.1    Zhou, M.2
  • 23
    • 84855355646 scopus 로고    scopus 로고
    • Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation
    • Jan
    • N. Wu and M. Zhou, "Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation, " IEEE Trans. Autom. Sci. Eng., vol. 9, no. 1, pp. 203-209, Jan. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng , vol.9 , Issue.1 , pp. 203-209
    • Wu, N.1    Zhou, M.2
  • 24
    • 0344013491 scopus 로고    scopus 로고
    • Schedule stabilization and robust timing control for time-constrained cluster tools
    • Sep
    • J.-H. Kim and T.-E. Lee, "Schedule stabilization and robust timing control for time-constrained cluster tools, " in Proc. IEEE ICRA, Sep. 2003, pp. 1039-1044.
    • (2003) Proc. IEEE ICRA , pp. 1039-1044
    • Kim, J.-H.1    Lee, T.-E.2
  • 25
    • 79961060862 scopus 로고    scopus 로고
    • A review of cluster tool scheduling and control for semiconductor manufacturing
    • T.-E. Lee, "A review of cluster tool scheduling and control for semiconductor manufacturing, " in Proc. Int. Conf. Model. Simul. Semicond. Manuf., 2008, pp. 1-6.
    • (2008) Proc. Int. Conf. Model. Simul. Semicond. Manuf , pp. 1-6
    • Lee, T.-E.1
  • 26
    • 84905868177 scopus 로고    scopus 로고
    • Handbook of automation
    • Berlin, Germany: Springer
    • T.-E. Lee, "Handbook of automation, " in Semiconductor Manufacturing Automation. Berlin, Germany: Springer, 2009, pp. 911-926.
    • (2009) Semiconductor Manufacturing Automation , pp. 911-926
    • Lee, T.-E.1
  • 27
    • 84876122279 scopus 로고    scopus 로고
    • Adaptive dispatching rule for semiconductor wafer fabrication facility
    • Apr
    • L. Li, Z. Sun, M. Zhou, and F. Qiao, "Adaptive dispatching rule for semiconductor wafer fabrication facility, " IEEE Trans. Autom. Sci. Eng., vol. 10, no. 2, pp. 354-364, Apr. 2013.
    • (2013) IEEE Trans. Autom. Sci. Eng , vol.10 , Issue.2 , pp. 354-364
    • Li, L.1    Sun, Z.2    Zhou, M.3    Qiao, F.4
  • 28
    • 84905834937 scopus 로고    scopus 로고
    • Response policies to process module failure in single-arm cluster tools subject to wafer residency time constraints
    • Y. Qiao, C. Pan, N. Wu, and M. Zhou, "Response policies to process module failure in single-arm cluster tools subject to wafer residency time constraints, " IEEE Trans. Semicond. Manuf.
    • IEEE Trans. Semicond. Manuf
    • Qiao, Y.1    Pan, C.2    Wu, N.3    Zhou, M.4
  • 29
    • 0022026963 scopus 로고
    • Linear-system-theoretic view of discrete-event processes and its use for performance evaluation in manufacturing
    • G. Cohen, D. Dubois, J. Quadrat, and M. Viot, "A linear-system-theoretic view of discrete-event processes and its use for performance evaluation in manufacturing, " IEEE Trans. Autom. Control, vol. 30, no. 3, pp. 210-220, Mar. 1985. (Pubitemid 15461189)
    • (1985) IEEE Transactions on Automatic Control , vol.AC-30 , Issue.3 , pp. 210-220
    • Cohen Guy1    Dubois Didier2    Quadrat Jean Pierre3    Viot Michel4
  • 30
    • 0024478677 scopus 로고
    • Algebraic tools for the performance evaluation of discrete event systems
    • Jan
    • G. Cohen, P. Moller, J.-P. Quadrat, and M. Viot, "Algebraic tools for the performance evaluation of discrete event systems, " Proc. IEEE, vol. 77, no. 1, pp. 39-85, Jan. 1989.
    • (1989) Proc. IEEE , vol.77 , Issue.1 , pp. 39-85
    • Cohen, G.1    Moller, P.2    Quadrat, J.-P.3    Viot, M.4
  • 32
    • 70449122721 scopus 로고    scopus 로고
    • Regular flow line models for semiconductor cluster tools: A case of lot dependent process times
    • Bangalore, India, Aug
    • J. R. Morrison, "Regular flow line models for semiconductor cluster tools: A case of lot dependent process times, " in Proc. 5th Annu. IEEE CASE, Bangalore, India, Aug. 2009, pp. 561-566.
    • (2009) Proc. 5th Annu. IEEE CASE , pp. 561-566
    • Morrison, J.R.1
  • 34
    • 0030691565 scopus 로고    scopus 로고
    • Performance measures and schedules in periodic job shops
    • Feb
    • T.-E. Lee and M. E. Posner, "Performance measures and schedules in periodic job shops, " Oper. Res., vol. 45, no. 1, pp. 72-91, Feb. 1998.
    • (1998) Oper. Res , vol.45 , Issue.1 , pp. 72-91
    • Lee, T.-E.1    Posner, M.E.2
  • 35
    • 0033891784 scopus 로고    scopus 로고
    • Stable earliest starting schedules for cyclic job shops: A linear system approach
    • DOI 10.1023/A:1008123115577
    • T.-E. Lee, "Stable earliest starting schedules for periodic job shops: A linear system approach, " Int. J. Flex. Manuf. Syst., vol. 12, no. 1, pp. 59-80, Feb. 2000. (Pubitemid 30573771)
    • (2000) International Journal of Flexible Manufacturing Systems , vol.12 , Issue.1 , pp. 59-80
    • Lee, T.-E.1
  • 36
    • 0036820026 scopus 로고    scopus 로고
    • Steady state analysis of cyclic job shops with overtaking
    • J.-W. Seo and T.-E. Lee, "Steady state analysis of cyclic job shops with overtaking, " Int. J. Flex. Manuf. Syst., vol. 14, no. 4, pp. 291-318, 2002.
    • (2002) Int. J. Flex. Manuf. Syst , vol.14 , Issue.4 , pp. 291-318
    • Seo, J.-W.1    Lee, T.-E.2
  • 37
    • 84894463859 scopus 로고    scopus 로고
    • Steady state analysis of timed event graphs with time window constraints
    • Apr
    • T.-E. Lee, S.-H. Park, and C. Jung, "Steady state analysis of timed event graphs with time window constraints, " Appl. Discrete Math., vol. 167, pp. 202-216, Apr. 2014.
    • (2014) Appl. Discrete Math , vol.167 , pp. 202-216
    • Lee, T.-E.1    Park, S.-H.2    Jung, C.3
  • 39
    • 33747443542 scopus 로고    scopus 로고
    • Multicluster tools scheduling: An integrated event graph and network model approach
    • DOI 10.1109/TSM.2006.879414, 1668233
    • S. Ding, J. Yi, and M. T. Zhang, "Multicluster tools scheduling: An integrated event graph and network model approach, " IEEE Trans. Semicond. Manuf., vol. 19, no. 3, pp. 339-351, Aug. 2006. (Pubitemid 44249890)
    • (2006) IEEE Transactions on Semiconductor Manufacturing , vol.19 , Issue.3 , pp. 339-351
    • Ding, S.1    Yi, J.2    Zhang, M.T.3
  • 40
    • 0028481573 scopus 로고
    • Singlewafer cluster tool performance: An analysis of throughput
    • Aug
    • T. L. Perkinson, P. K. McLarty, R. S. Gyurcsik, and R. K. Cavin, "Singlewafer cluster tool performance: An analysis of throughput, " IEEE Trans. Semicond. Manuf., vol. 7, no. 3, pp. 369-373, Aug. 1994.
    • (1994) IEEE Trans. Semicond. Manuf , vol.7 , Issue.3 , pp. 369-373
    • Perkinson, T.L.1    McLarty, P.K.2    Gyurcsik, R.S.3    Cavin, R.K.4
  • 42
    • 0034367676 scopus 로고    scopus 로고
    • Cyclic scheduling in robotic flowshops
    • Y. Crama, J. Van De Klundert, and E. Levner, "Cyclic scheduling in robotic flowshops, " Ann. Oper. Res., vol. 96, no. 4, pp. 97-124, 2000.
    • (2000) Ann. Oper. Res , vol.96 , Issue.4 , pp. 97-124
    • Crama, Y.1    Klundert De J.Van2    Levner, E.3
  • 43
    • 0036769403 scopus 로고    scopus 로고
    • On throughput maximization in constant travel-time robotic cells
    • Fall
    • M. Dawande, C. Sriskandarajah, and S. Sethi, "On throughput maximization in constant travel-time robotic cells, " Manuf. Serv. Oper. Manage., vol. 4, no. 4, pp. 296-312, Fall 2002.
    • (2002) Manuf. Serv. Oper. Manage , vol.4 , Issue.4 , pp. 296-312
    • Dawande, M.1    Sriskandarajah, C.2    Sethi, S.3
  • 44
    • 23944522312 scopus 로고    scopus 로고
    • Sequencing and scheduling in robotic cells: Recent developments
    • DOI 10.1007/s10951-005-2861-9
    • M. Dawande, H. N. Geismar, S. P. Sethi, and C. Sriskandarjahs, "Sequencing and scheduling in robotic cells: Recent developments, " J. Sched., vol. 8, no. 5, pp. 387-426, 2005. (Pubitemid 41202890)
    • (2005) Journal of Scheduling , vol.8 , Issue.5 , pp. 387-426
    • Dawande, M.1    Geismar, H.N.2    Sethi, S.P.3    Sriskandarajah, C.4
  • 45
    • 0031272146 scopus 로고    scopus 로고
    • Cyclic scheduling of identical parts in a robotic cell
    • Y. Crama and J. Van De Klundert, "Cyclic scheduling of identical parts in a robotic cell, " Oper. Res., vol. 45, no. 6, pp. 952-965, 1997. (Pubitemid 127684775)
    • (1997) Operations Research , vol.45 , Issue.6 , pp. 952-965
    • Crama, Y.1    Van De Klundert, J.2
  • 46
    • 85023501284 scopus 로고    scopus 로고
    • Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation
    • T.-K. Kim, C. Jung, and T.-E. Lee, "Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation, " Int. J. Prod. Res., vol. 50, no. 10, pp. 2785-2795, 2012.
    • (2012) Int. J. Prod. Res , vol.50 , Issue.10 , pp. 2785-2795
    • Kim, T.-K.1    Jung, C.2    Lee, T.-E.3
  • 48
    • 77957890217 scopus 로고    scopus 로고
    • Robotic cells with stochastic processing times
    • H. N. Geismar and M. Pinedo, "Robotic cells with stochastic processing times, " IIE Trans., vol. 42, no. 12, pp. 897-914, 2010.
    • (2010) IIE Trans , vol.42 , Issue.12 , pp. 897-914
    • Geismar, H.N.1    Pinedo, M.2
  • 50
    • 33646731658 scopus 로고    scopus 로고
    • Workload balancing and scheduling of a single-armed cluster tools
    • T.-E. Lee, H.-Y. Lee, and Y.-H. Shin, "Workload balancing and scheduling of a single-armed cluster tools, " in Proc. APIEMS, 2004, pp. 1-6.
    • (2004) Proc. APIEMS , pp. 1-6
    • Lee, T.-E.1    Lee, H.-Y.2    Shin, Y.-H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.