메뉴 건너뛰기




Volumn 73, Issue , 2014, Pages 298-311

Electricity transmission arrangements in Great Britain: Time for change?

Author keywords

Market design; Multi purpose transmission investment; Transmission regulation and pricing

Indexed keywords

COMMERCE; ECONOMICS; ELECTRIC UTILITIES;

EID: 84905373190     PISSN: 03014215     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.enpol.2014.06.014     Document Type: Article
Times cited : (30)

References (39)
  • 1
    • 51549102199 scopus 로고    scopus 로고
    • Transmission expansion under market conditions: the chilean experience
    • In: Proceedings of the IEEE PowerTech 2005. St. Petersburg
    • Araneda, J.C., Rios, S., 2005. Transmission expansion under market conditions: the chilean experience. In: Proceedings of the IEEE PowerTech 2005. St. Petersburg.
    • (2005)
    • Araneda, J.C.1    Rios, S.2
  • 2
    • 42549167806 scopus 로고    scopus 로고
    • Innovative measures to increase the utilization of Norwegian transmission
    • Proceedings of the IEEE PowerTech 2003. Bolognia
    • Breidablik, Ø., Giæver, F., Glende, I., 2003. Innovative measures to increase the utilization of Norwegian transmission. In: Proceedings of the IEEE PowerTech 2003. Bolognia.
    • (2003)
    • Breidablik, O.1    Giæver, F.2    Glende, I.3
  • 3
    • 84905398362 scopus 로고    scopus 로고
    • Benefits of an Integrated European Energy Market
    • Available at: Booz & Company
    • Booz & Company, Newberry, D., Strbac, G., Pudjianto, D., Noel, P., LeighFisher, 2013. Benefits of an Integrated European Energy Market. Available at: http://ec.europa.eu/energy/infrastructure/studies/doc/20130902_energy_integration_benefits.pdf.
    • (2013)
    • Newberry, D.1    Strbac, G.2    Pudjianto, D.3    Noel, P.4    Fisher, L.5
  • 4
    • 84870988074 scopus 로고    scopus 로고
    • Power Flow Control on the Italian Network by Means of Phase-shifting Transformers
    • Cigre Paris Session 2006, Paper A2-206
    • Carlini, E.M., Manduzio, G., Bonmann, D., 2006. Power Flow Control on the Italian Network by Means of Phase-shifting Transformers. Cigre Paris Session 2006, Paper A2-206.
    • (2006)
    • Carlini, E.M.1    Manduzio, G.2    Bonmann, D.3
  • 5
    • 84880131487 scopus 로고    scopus 로고
    • Global trends in electricity transmission system operation: where does the future lie?
    • Chawla M., Pollitt M. Global trends in electricity transmission system operation: where does the future lie?. Electr. J. 2013, 26(5):65-71.
    • (2013) Electr. J. , vol.26 , Issue.5 , pp. 65-71
    • Chawla, M.1    Pollitt, M.2
  • 7
    • 84885725823 scopus 로고    scopus 로고
    • 10-Year Network Development Plan 2012
    • Available at: , ENTSO-E
    • ENTSO-E, 2012. 10-Year Network Development Plan 2012. Available at: https://www.entsoe.eu/fileadmin/user_upload/_library/SDC/TYNDP/2012/TYNDP_2012_report.pdf.
    • (2012)
  • 8
    • 84905373205 scopus 로고    scopus 로고
    • Electricity transmission pricing: how much does it cost to get it wrong? Cambridge Working Papers in Economics 0466
    • Faculty of Economics, University of Cambridge
    • Green, R., 2004. Electricity transmission pricing: how much does it cost to get it wrong? Cambridge Working Papers in Economics 0466. Faculty of Economics, University of Cambridge.
    • (2004)
    • Green, R.1
  • 10
    • 84905394319 scopus 로고    scopus 로고
    • Allocating costs roughly commensurate with multiple transmission benefits
    • In: Presentation at ITPR Conference. Imperial College London. Available at:
    • Hogan, W., 2013. Allocating costs roughly commensurate with multiple transmission benefits. In: Presentation at ITPR Conference. Imperial College London. Available at: http://www.ofgem.gov.uk/Networks/Trans/ElecTransPolicy/itpr/workshops/Documents1/January%20workshop%20-%20William%20Hogan%20-%20Harvard.pdf.
    • (2013)
    • Hogan, W.1
  • 11
    • 77957118862 scopus 로고    scopus 로고
    • Towards a combined merchant-regulatory mechanism for electricity transmission expansion
    • Hogan W., Rosellón J., Vogelsang I. Towards a combined merchant-regulatory mechanism for electricity transmission expansion. J. Regul. Econ. 2010, 38(2):113-143.
    • (2010) J. Regul. Econ. , vol.38 , Issue.2 , pp. 113-143
    • Hogan, W.1    Rosellón, J.2    Vogelsang, I.3
  • 12
    • 78649926657 scopus 로고    scopus 로고
    • Operation Rules Determined by Risk Analysis for Special Protection Systems at Hydro-Quebec
    • CIGRE Paris Session 2004, Paper B5-205
    • Huang, J.A., Vanier, G., Valette, A., Harrison, S., Levesque, F., Wehenkel, L., 2004. Operation Rules Determined by Risk Analysis for Special Protection Systems at Hydro-Quebec. CIGRE Paris Session 2004, Paper B5-205.
    • (2004)
    • Huang, J.A.1    Vanier, G.2    Valette, A.3    Harrison, S.4    Levesque, F.5    Wehenkel, L.6
  • 13
    • 84884969891 scopus 로고    scopus 로고
    • Understanding the Balancing Challenge
    • Analysis Commissioned by DECC, 2012. Available at: , Imperial College and NERA Consulting
    • Imperial College and NERA Consulting, 2012. Understanding the Balancing Challenge. Analysis Commissioned by DECC, 2012. Available at: http://www.nera.com/nera-files/PUB_DECC_0812.pdf.
    • (2012)
  • 14
    • 36348964610 scopus 로고    scopus 로고
    • Special Protection Scheme Against Voltage Collapse in the South Part of the Swedish Grid
    • CIGRE Paris Session 1996
    • Ingelsson, B., Lindstrom, P.O., Karlsson, D., Runvik, G., Sjodin, J.O., 1996. Special Protection Scheme Against Voltage Collapse in the South Part of the Swedish Grid. CIGRE Paris Session 1996, pp. 38-105.
    • (1996) , pp. 38-105
    • Ingelsson, B.1    Lindstrom, P.O.2    Karlsson, D.3    Runvik, G.4    Sjodin, J.O.5
  • 15
    • 84905404527 scopus 로고    scopus 로고
    • Strengths and weaknesses of independent system operators without ownership unbundling
    • In: Presentation to EPRG-CEEPR London Conference. Available at:
    • Joskow, P.L., 2007. Strengths and weaknesses of independent system operators without ownership unbundling. In: Presentation to EPRG-CEEPR London Conference. Available at: http://www.eprg.group.cam.ac.uk/wpcontent/uploads/2008/12/agenda_070618.pdf.
    • (2007)
    • Joskow, P.L.1
  • 16
    • 84905404960 scopus 로고    scopus 로고
    • Adaptive Protection Deployment in Special Protection Schemes for Hydro Quebec[U+05F3]s Transmission Grid
    • PacWorld Magazine, June
    • Kirby, B., Richards, S., Kamwa,I., 2012. Adaptive Protection Deployment in Special Protection Schemes for Hydro Quebec[U+05F3]s Transmission Grid. PacWorld Magazine, June.
    • (2012)
    • Kirby, B.1    Richards, S.2    Kamwa, I.3
  • 17
    • 84905372304 scopus 로고    scopus 로고
    • Assessment of Synergies and Conflicts of Interest Arising From the Great Britain System Operator Delivering Electricity Market Reform
    • April 2013. Available at: , KPMG
    • KPMG, 2013. Assessment of Synergies and Conflicts of Interest Arising From the Great Britain System Operator Delivering Electricity Market Reform. April 2013. Available at: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/191733/KPMG_NG_Conflicts_of_Interest_Assessment_FINAL.pdf.
    • (2013)
  • 18
    • 43449104003 scopus 로고    scopus 로고
    • Transmission expansion in Argentina 5: the regional electricity forum of Buenos Aires province
    • Littlechild S.C., Ponzano E.A. Transmission expansion in Argentina 5: the regional electricity forum of Buenos Aires province. Energy Econ. 2008, 30(4):1491-1526.
    • (2008) Energy Econ. , vol.30 , Issue.4 , pp. 1491-1526
    • Littlechild, S.C.1    Ponzano, E.A.2
  • 19
    • 43449094761 scopus 로고    scopus 로고
    • Transmission expansion in Argentina 1: the Origins of Policy
    • Littlechild S.C., Skerk C.J. Transmission expansion in Argentina 1: the Origins of Policy. Energy Econ. 2008, 30(4):1491-1526.
    • (2008) Energy Econ. , vol.30 , Issue.4 , pp. 1491-1526
    • Littlechild, S.C.1    Skerk, C.J.2
  • 20
    • 43449105104 scopus 로고    scopus 로고
    • Transmission expansion in Argentina 2: The Fourth Line revisited
    • Littlechild S.C., Skerk C.J. Transmission expansion in Argentina 2: The Fourth Line revisited. Energy Econ. 2008, 30(4):1385-1419.
    • (2008) Energy Econ. , vol.30 , Issue.4 , pp. 1385-1419
    • Littlechild, S.C.1    Skerk, C.J.2
  • 21
    • 43449137851 scopus 로고    scopus 로고
    • Transmission expansion in Argentina 3: the Evolution of Policy
    • Littlechild S.C., Skerk C.J. Transmission expansion in Argentina 3: the Evolution of Policy. Energy Econ. 2008, 30(4):1420-1461.
    • (2008) Energy Econ. , vol.30 , Issue.4 , pp. 1420-1461
    • Littlechild, S.C.1    Skerk, C.J.2
  • 22
    • 43449092861 scopus 로고    scopus 로고
    • Transmission expansion in Argentina 4: a review of performance
    • Littlechild S.C., Skerk C.J. Transmission expansion in Argentina 4: a review of performance. Energy Econ. 2008, 30(4):1462-1490.
    • (2008) Energy Econ. , vol.30 , Issue.4 , pp. 1462-1490
    • Littlechild, S.C.1    Skerk, C.J.2
  • 23
    • 43449103075 scopus 로고    scopus 로고
    • Distribution companies, regulation and the public contest method
    • Littlechild S.C., Skerk C.J. Distribution companies, regulation and the public contest method. Energy Econ. 2008, 30(4):1527-1535.
    • (2008) Energy Econ. , vol.30 , Issue.4 , pp. 1527-1535
    • Littlechild, S.C.1    Skerk, C.J.2
  • 25
    • 84864483681 scopus 로고    scopus 로고
    • Integrated reliability and cost-benefit-based standards for transmission network operation
    • Moreno R., Pudjianto D., Strbac G. Integrated reliability and cost-benefit-based standards for transmission network operation. Proc. Inst. Mech. Eng., Part O: J. Risk Reliab. 2012, 226(1):75-87.
    • (2012) Proc. Inst. Mech. Eng., Part O: J. Risk Reliab. , vol.226 , Issue.1 , pp. 75-87
    • Moreno, R.1    Pudjianto, D.2    Strbac, G.3
  • 26
    • 84886300245 scopus 로고    scopus 로고
    • Transmission network investment with probabilistic security and corrective control
    • Moreno R., Pudjianto D., Strbac G. Transmission network investment with probabilistic security and corrective control. IEEE Trans. Power Syst. 2013, 28(4):3935-3944.
    • (2013) IEEE Trans. Power Syst. , vol.28 , Issue.4 , pp. 3935-3944
    • Moreno, R.1    Pudjianto, D.2    Strbac, G.3
  • 27
    • 84872836603 scopus 로고    scopus 로고
    • The Statement of the Use of System Charging Methodology
    • Available at: , National Grid
    • National Grid, 2010. The Statement of the Use of System Charging Methodology. Available at: http://www.nationalgrid.com/NR/rdonlyres/590ACE8D-01BE-4ED9-A028-3736D28A7CCE/41181/UoSCMI6R0v10Final.pdf.
    • (2010)
  • 28
    • 84884331327 scopus 로고    scopus 로고
    • Electricity Ten Year Statement
    • Available at: , National Grid
    • National Grid, 2012. Electricity Ten Year Statement. Available at: http://www2.nationalgrid.com/WorkArea/DownloadAsset.aspx?id=23109.
    • (2012)
  • 29
    • 84905397122 scopus 로고    scopus 로고
    • Addressing Market Power Concerns in the Electricity Wholesale Sector-Initial Policy Proposals
    • Para 1.15, March 2009, Ofgem
    • Ofgem, 2009. Addressing Market Power Concerns in the Electricity Wholesale Sector-Initial Policy Proposals. Para 1.15, March 2009.
    • (2009)
  • 30
    • 81555225957 scopus 로고    scopus 로고
    • RIIO: A New Way to Regulate Energy Networks
    • October 2010. Available at: , Ofgem
    • Ofgem, 2010. RIIO: A New Way to Regulate Energy Networks. October 2010. Available at: https://www.ofgem.gov.uk/ofgem-publications/51870/decision-doc.pdf.
    • (2010)
  • 31
    • 84905364265 scopus 로고    scopus 로고
    • Ofgem, RIIO - T1 Final Proposals. Available at: .
    • Ofgem, 2012a. RIIO - T1 Final Proposals. Available at: http://www.ofgem.gov.uk/Networks/Trans/PriceControls/RIIO-T1/Pages/RIIO-T1.aspx.
    • (2012)
  • 32
    • 84905366879 scopus 로고    scopus 로고
    • Ofgem, Open Letter: Planning for an Integrated Electricity Transmission System - Request for View. March 2012. Available at: .
    • Ofgem, 2012b. Open Letter: Planning for an Integrated Electricity Transmission System - Request for View. March 2012. Available at: https://www.ofgem.gov.uk/ofgem-publications/52756/itpr-open-letter-final-version-23-march-2012.pdf.
    • (2012)
  • 33
    • 84905391894 scopus 로고    scopus 로고
    • Ofgem, Electricity System Operator Incentives: Final Proposals. May 2013. Available at: .
    • Ofgem, 2013a. Electricity System Operator Incentives: Final Proposals. May 2013. Available at: https://www.ofgem.gov.uk/ofgem-publications/39898/electricity-system-operator-incentives-final-proposals-scheme-2013.pdf.
    • (2013)
  • 34
    • 84905402773 scopus 로고    scopus 로고
    • Ofgem, Cap and Floor Regime for Regulated Electricity Interconnector Investment for Application to Project NEMO. March 2013. Available at: .
    • Ofgem, 2013b. Cap and Floor Regime for Regulated Electricity Interconnector Investment for Application to Project NEMO. March 2013. Available at: https://www.ofgem.gov.uk/ofgem-publications/59243/cap-and-floor-regime-regulated-electricity-interconnector-investment-application-project-nemo.pdf.
    • (2013)
  • 35
    • 84879442390 scopus 로고    scopus 로고
    • Offshore Transmission Coordination Project Conclusions Report
    • March 2012. Available at: , Ofgem/DECC
    • Ofgem/DECC, 2012. Offshore Transmission Coordination Project Conclusions Report. March 2012. Available at: https://www.ofgem.gov.uk/ofgem-publications/51614/20120103otcp-conclusions-report.pdf.
    • (2012)
  • 36
    • 84879642669 scopus 로고    scopus 로고
    • An assessment of transient assistive measures using HVDC for special protection schemes: case on the GB transmission system
    • In: Proceedings of the 10th International Conference on AC and DC Power Transmission 2012. Birmingham, UK
    • Pipelzadeh, Y., Moreno, R., Chaudhuri, B., Strbac, G., Green, T.C., 2012. An assessment of transient assistive measures using HVDC for special protection schemes: case on the GB transmission system. In: Proceedings of the 10th International Conference on AC and DC Power Transmission 2012. Birmingham, UK.
    • (2012)
    • Pipelzadeh, Y.1    Moreno, R.2    Chaudhuri, B.3    Strbac, G.4    Green, T.C.5
  • 37
    • 84862255051 scopus 로고    scopus 로고
    • Lessons from the history of independent system operators in the energy sector
    • Pollitt M. Lessons from the history of independent system operators in the energy sector. Energy Policy 2012, 47:32-48.
    • (2012) Energy Policy , vol.47 , pp. 32-48
    • Pollitt, M.1
  • 38
    • 84887359284 scopus 로고    scopus 로고
    • Coordination in Offshore Transmission - An Assessment of Regulatory, Commercial and Economic Issues and Options
    • December 2011. Available at: , Redpoint Energy
    • Redpoint Energy, 2011. Coordination in Offshore Transmission - An Assessment of Regulatory, Commercial and Economic Issues and Options. December 2011. Available at:. https://www.ofgem.gov.uk/ofgem-publications/51669/offshore-transmission-redpoint-report-15-12-2011.pdf.
    • (2011)
  • 39
    • 82855168301 scopus 로고    scopus 로고
    • Towards a risk-based network operation and design standards
    • In: Proceedings of the General Meeting of the IEEE Power and Energy Society (PES) 2011. Detroit, USA
    • Strbac, G., Moreno, R., Pudjianto, D., Castro, M., 2011. Towards a risk-based network operation and design standards. In: Proceedings of the General Meeting of the IEEE Power and Energy Society (PES) 2011. Detroit, USA.
    • (2011)
    • Strbac, G.1    Moreno, R.2    Pudjianto, D.3    Castro, M.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.